Line 19 (Beijing Subway)

From Wikipedia, the free encyclopedia
Line 19
 19 
19 004 at Doudian (20210702144354).jpg
Train of Line 19 in CRRC Changke Erqi Railway Equipments factory in July 2021
Overview
Other name(s)M19 / R3 (planned name)
StatusUnder construction
TerminiMudan Yuan
Xin Gong
Stations10 (Phase 1)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]
Rolling stock8-car Type A
Technical
Line length22.4 km (Phase 1)[1]
Characterfully underground[2]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (Phase 1)[3]
Route map

Legend
planned extensions
Mudan Yuan
Left arrow outer - inner Right arrow
Xiaoyue river
Left arrow - Right arrow
North Hucheng river
Jishuitan
Left arrow outer - inner Right arrow
Ping'an Li
Line 3 Right arrow
Left arrow Line 3 Tiancun
Line 1 crossing
Line 2 crossing
Line 7 crossing
South Hucheng river
Jingfengmen
Liangshui river
Left arrow Daxing Airport Express Lize Business District
Ma'cao river
Caoqiao
Left arrow inner - outer Right arrow
Xingong depot
Xin Gong
planned extensions

Line 19 of the Beijing Subway (Chinese: 北京地铁19号线; pinyin: běijīng dìtiě shíjiǔ hàoxiàn) is a rapid transit line under construction in Beijing. Phase 1 of the line, which is currently under construction, is 22.4 km in length with 10 stations. It is fully underground.[4]

Description[]

According to the most recent plan, Phase 1 of Line 19 will begin at Mudan Yuan station in Haidian District and end at Xin Gong station in Fengtai District.[5] Phase 1 of the line is 22.4 km (13.9 mi) in length with 10 stations.[6] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.

Rolling stock[]

The line will use 8-car type A rolling stock.[3][7]

Planned opening time[]

Segment Commencement Length Station(s) Name
Mudan Yuan — Xin Gong 2021 (Planned)[8] 22.4 km (13.9 mi) 10 Phase 1

Stations (Phase I)[]

Station Name Connections Distance
km
English Chinese
Mudan Yuan 牡丹园  10 
北太平庄  12  (U/C)
Jishuitan 积水潭  2 
Ping'an Li 平安里  4   6 
金融街
牛街
Jingfengmen 景风门  14  (U/C)
Caoqiao 草桥  10   Daxing Airport 
新发地
Xin Gong 新宫  Daxing 

History[]

It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities.[citation needed] As of 2015, the line was renamed to Line 19[9] with the first phase starting construction in 2016.[5] The line will open in 2021.[10][11]

Future Development[]

Phase 2 of Line 19, which is under planning, consists of a northern extension. There will be a branch line of the northern extension, which will serve the rebuilt Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[12]

References[]

  1. ^ Jump up to: a b "定了!地铁19号线,北京轨道运营公司运营". 2019-12-12.
  2. ^ http://m.sohu.com/n/419834931/
  3. ^ Jump up to: a b 北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2017-03-24.
  4. ^ http://m.sohu.com/n/419834931/
  5. ^ Jump up to: a b "北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网". www.xinhuanet.com. Retrieved 2018-07-21.
  6. ^ "北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27" (in Chinese).
  7. ^ 北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2018-05-29.
  8. ^ "北京今年年底预计开通7条(段)地铁 总计约54公里". 2021-02-26.
  9. ^ http://news.cnr.cn/native/gd/20150720/t20150720_519258903.shtml
  10. ^ "19号线草桥以南后年先行开通". 2019-07-03.
  11. ^ "编制轨道交通新一轮建设规划". 2019-02-27.
  12. ^ 北京地铁19号线一期计划2020年底开通. www.bj.xinhuanet.com. Retrieved 2017-03-24.
Retrieved from ""