Line 19 (Beijing Subway)
Line 19 | ||
---|---|---|
19 | ||
Overview | ||
Other name(s) | M19 / R3 (planned name) | |
Status | Under construction | |
Termini | Mudan Yuan Xin Gong | |
Stations | 10 (Phase 1) | |
Service | ||
Type | Rapid transit | |
System | Beijing Subway | |
Operator(s) | Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1] | |
Rolling stock | 8-car Type A | |
Technical | ||
Line length | 22.4 km (Phase 1)[1] | |
Character | fully underground[2] | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |
Operating speed | 100 km/h (Phase 1)[3] | |
|
Line 19 of the Beijing Subway (Chinese: 北京地铁19号线; pinyin: běijīng dìtiě shíjiǔ hàoxiàn) is a rapid transit line under construction in Beijing. Phase 1 of the line, which is currently under construction, is 22.4 km in length with 10 stations. It is fully underground.[4]
Description[]
According to the most recent plan, Phase 1 of Line 19 will begin at Mudan Yuan station in Haidian District and end at Xin Gong station in Fengtai District.[5] Phase 1 of the line is 22.4 km (13.9 mi) in length with 10 stations.[6] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.
Rolling stock[]
The line will use 8-car type A rolling stock.[3][7]
Planned opening time[]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Mudan Yuan — Xin Gong | 2021 (Planned)[8] | 22.4 km (13.9 mi) | 10 | Phase 1 |
Stations (Phase I)[]
Station Name | Connections | Distance km | ||
---|---|---|---|---|
English | Chinese | |||
Mudan Yuan | 牡丹园 | 10 | ||
北太平庄 | 12 (U/C) | |||
Jishuitan | 积水潭 | 2 | ||
Ping'an Li | 平安里 | 4 6 | ||
金融街 | ||||
牛街 | ||||
Jingfengmen | 景风门 | 14 (U/C) | ||
Caoqiao | 草桥 | 10 Daxing Airport | ||
新发地 | ||||
Xin Gong | 新宫 | Daxing | ||
History[]
It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities.[citation needed] As of 2015, the line was renamed to Line 19[9] with the first phase starting construction in 2016.[5] The line will open in 2021.[10][11]
Future Development[]
Phase 2 of Line 19, which is under planning, consists of a northern extension. There will be a branch line of the northern extension, which will serve the rebuilt Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[12]
References[]
- ^ Jump up to: a b "定了!地铁19号线,北京轨道运营公司运营". 2019-12-12.
- ^ http://m.sohu.com/n/419834931/
- ^ Jump up to: a b 北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2017-03-24.
- ^ http://m.sohu.com/n/419834931/
- ^ Jump up to: a b "北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网". www.xinhuanet.com. Retrieved 2018-07-21.
- ^ "北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27" (in Chinese).
- ^ 北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2018-05-29.
- ^ "北京今年年底预计开通7条(段)地铁 总计约54公里". 2021-02-26.
- ^ http://news.cnr.cn/native/gd/20150720/t20150720_519258903.shtml
- ^ "19号线草桥以南后年先行开通". 2019-07-03.
- ^ "编制轨道交通新一轮建设规划". 2019-02-27.
- ^ 北京地铁19号线一期计划2020年底开通. www.bj.xinhuanet.com. Retrieved 2017-03-24.
- Beijing Subway lines
- Proposed public transport in China
- Proposed buildings and structures in Beijing
- Transport infrastructure under construction in China