Beijing–Binhai intercity railway
Beijing–Binhai intercity railway 京滨城际铁路 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Beijing, Hebei, and Tianjin | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Beijing Sub-Center Binhai West | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | High-speed rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | China Railway High-speed | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 171.7 km (107 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Beijing–Binhai intercity railway | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 京滨城际铁路 | ||||||
Traditional Chinese | 京濱城際鐵路 | ||||||
| |||||||
Second Beijing–Tianjin intercity railway | |||||||
Simplified Chinese | 京津第二城际铁路 | ||||||
Traditional Chinese | 京津第二城際鐵路 | ||||||
|
Beijing–Binhai intercity railway (Jingbin intercity railway), also known as the Second Beijing–Tianjin intercity railway, is a new high-speed railway located between the municipalities of Beijing and Tianjin. It will run from Beijing Sub-Center railway station to Binhai West railway station in Binhai New Area of Tianjin. The first half of this project will be built as part of the Beijing–Tangshan intercity railway. From onwards the line will branch south along new trackage to Tianjin.
Together with the Beijing–Tangshan intercity railway, this railway forms part of a proposed regional 4 North-South lines, 4 East-West lines that together form a network for fast commuter services across the densely populated Beijing, Tianjin and Hebei megalopolis.
Route[]
It starts at Beijing Sub-Center railway station, which is located in Tongzhou District. And then it goes into Xianghe County, Hebei, and Baodi District, Tianjin. This project then deviates from the Beijing-Tangshan ICR alignment to travel south through eastern Wuqing District, Ninghe District, Beichen District, Dongli District serving a station at Tianjin Binhai International Airport then terminating in Tianjin's Binhai New Area.
History[]
Advanced engineering commenced onsite at December 29, 2015.[1] As of mid-October 2020, it was reported that the line's most technically complicated section had been erected: a 31.7km-long stretch of line raised on a continuous series of bridges making 10 river-crossings en route. Estimated completion date is September 2022.[2]
References[]
- ^ Cao Zheng (曹政) (December 30, 2015). 京唐京滨城际先期工程昨开工 明年上半年全线建设 (in Chinese). Beijing Daily. Archived from the original on March 4, 2016. Retrieved December 30, 2015.
- ^ "京滨城际铁路取得关键突破,一期计划2022年9月通车". Sohu.
- High-speed railway lines in China
- Rail transport in Beijing
- Rail transport in Hebei
- Rail transport in Tianjin
- Standard gauge railways in China
- Airport rail links in China