Beijing Fengtai railway station

From Wikipedia, the free encyclopedia
Beijing Fengtai

北京丰台
China Railway
Beijing Subway
Construction site of New Fengtai Railway Station (20210916154040).jpg
Construction site of new Beijing Fengtai railway station in September 2021
General information
LocationFengtai District, Beijing
Coordinates
Operated byBeijing Mass Transit Railway Operation Corp., Ltd (Beijing Subway Line 10)
Line(s)Beijing–Shanghai railway
Fengtai–Shacheng railway
Beijing–Guangzhou high-speed railway
Beijing–Shangqiu high-speed railway (planned)
     Line 10
     Line 16 (u/c)
Platforms2 (1 island platform)
Tracks2
Other information
Station code10025 (TMIS)
FTP (telegram)
FTA (pinyin)
ClassificationTop Class station (特等站)
History
Opened
  • 1896[1] (old railway station)
  • 5 May 2013 (2013-05-05) (Beijing Subway Line 10)
  • April 2022[2] (new railway station)
  • Late 2022 (Beijing Subway Line 16)
Closed19 June 2010 (2010-06-19) (old railway station)
Services
Preceding station   China Railways.svg China Railway   Following station
Beijing South
towards Beijing
Beijing–Shanghai Railway
towards Shanghai
Beijing Subway
Shoujingmao
outer loop / anticlockwise
Line 10
Niwa
inner loop / clockwise

Beijing Fengtai railway station[3] (Chinese: 北京丰台站; pinyin: Běijīng Fēngtái zhàn) is a railway station located in the Fengtai District of Beijing. It renamed from Fengtai railway station to Beijing Fengtai railway station in 2021.[3] The new railway station is scheduled to open in April 2022.[2]

The new railway station will be served by both high-speed and conventional speed railways[4][5] and will be the largest railway station in Asia.[6] It is also likely to serve as one of the terminal stations of the Beijing–Guangzhou high-speed railway.[7]

History[]

Construction on the original station began in 1895, and it was opened in 1896.[1] Passenger services ceased on 19 June 2010.[8] The station has been closed since June 2010 in preparation for the construction of the new Fengtai railway station, which is expected to have a similar scale to Beijing South railway station.[5]

A metro station on Line 10 of the Beijing Subway was opened here on 5 May 2013.[9]

The construction of the new station was officially started in mid 2018 and the new railway station was expected to open in 2020 for conventional speed railway,[4] and in 2021 for high-speed railway.[4] However, it is now expected to open in April 2022.[10]

Layout[]

China Railway[]

The station will have twelve platforms for high-speed trains (consisting of six islands) directly above twenty platforms for conventional services (consisting of nine islands and two side platforms).[11]

Beijing Subway[]

Fengtai railway station is served by Line 10 of the Beijing Subway.[12][13] It will also connect with Line 16 in the future.[14] The station has an underground island platform and three exits, lettered C1, C2, and D. Exit C1 is accessible.

The Line 10 platform

References[]

  1. ^ a b "期待!百年老站的华丽转身".
  2. ^ a b "丰台区区长初军威:打造金融科技文化商务集聚地,推动高质量发展".
  3. ^ a b "北京丰台站站名字牌吊装完成". 2021-11-12. Archived from the original on 2021-11-12.
  4. ^ a b c "新丰台站正式开工 将成北京重要交通枢纽". 2018-09-09.
  5. ^ a b 京石客运专线下半年建成 丰台火车站成高铁总站 [The Beijing-Shijiazhuang Passenger Railway will be completed in the second half of the year. Fengtai Railway Station to become the main high-speed train station.]. Huochepiao (in Chinese). July 27, 2012. Archived from the original on 2013-01-07.
  6. ^ Chen, Ziyan (2018-08-15). "Asia's largest railway station being built in Beijing". China Daily. Retrieved 2018-08-16.
  7. ^ 京广客运专线将引入新丰台站 [Beijing-Guangzhou Passenger Line will introduce new Fengtai station]. news.163.com (in Chinese). July 29, 2010. Archived from the original on November 21, 2012. Retrieved November 25, 2012.
  8. ^ Liu Zening (刘泽宁) (2010-06-20). 115岁北京丰台火车站改扩建 200人捧场末班车. Tencent (QQ) News. Retrieved 2013-07-19.
  9. ^ 北京第二条地铁环线10号线5月5日日正式贯通运营. 163.com news. Xinhua News. 2013-05-05. Retrieved 2013-05-05.
  10. ^ "丰台区区长初军威:打造金融科技文化商务集聚地,推动高质量发展".
  11. ^ "丰台火车站改建工程施工总平面图及丰台站周边交通规划、产业规划". QQ (in Chinese). 2020-06-02. Archived from the original on 2021-05-09. Retrieved 2021-05-09.
  12. ^ 地铁10号线二期I段设计方案敲定 [Section I of Line 10 Phase II finalizing the design]. Capital Construction News (in Chinese). Beijing Municipal Commission of Housing and Urban-Rural Development. January 28, 2008. Archived from the original on 2014-11-01.
  13. ^ 北京公交查询. smskb.com (in Chinese). Archived from the original on 2014-04-16.
  14. ^ 北京地铁16号线车站设计方案展示. 2013-04-25. Archived from the original on 2013-10-07. Retrieved 2014-12-30.


Retrieved from ""