China Railway CRH5

From Wikipedia, the free encyclopedia
China Railways CRH5 EMU
Crh5 beijing.jpg
CRH5A high-speed train in Beijing railway station
In service2007 – Present
ManufacturerAlstom
Changchun Railway Vehicles Co., Ltd.
Family namePendolino
Number built140 trainsets (1120 cars)
Formation8 cars per trainset (5M3T)
CapacityFixed seats: 622
Rolling seats: 586 or 570
Operator(s)Chinese Ministry of Railways
- Beijing Railway Bureau
- Shenyang Railway Bureau
- Harbin Railway Bureau
- Taiyuan Railway Bureau
- Jinan Railway Bureau
- Zhengzhou Railway Bureau
- Wuhan Railway Bureau
- Lanzhou Railway Bureau
- Hohhot Railway Bureau
-
Line(s) servedHigh speed and major conventional rail lines in northern China
Specifications
Train length211.5 m (694 ft)
Width3,200 mm (10 ft 6 in)
Height4,270 mm (14 ft 0 in)
Platform height500–1,250 mm (1 ft 8 in–4 ft 1 in)
Maximum speed250 km/h (155 mph)
Weight443 t (436 long tons; 488 short tons)
Traction systemAlstom IGBT VVVF inverter control
Power output5,500 kW (7,400 hp)
TransmissionAC-DC-AC
Acceleration≥ 0.5 m/s2 (1.6 ft/s2) (Starter)
0.11 m/s2 (0.36 ft/s2)
(at 200 km/h or 124 mph)
0.05 m/s2 (0.16 ft/s2)
(at 250 km/h or 155 mph)
Power supply(?)
Electric system(s)25 kV 50 Hz AC Overhead
Current collection methodPantograph
Braking system(s)Regenerative, electronically controlled pneumatic brakes
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The CRH5 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is an electric multiple unit high-speed train in use with China Railway High-speed in the People's Republic of China. The CRH5 is based on the ETR-600 New Pendolino used in Italy.

The CRH5 are non-tilting trains, developed for the Chinese Railways and which technology has been transferred to local manufacturers.[1] The CRH5 operate steadily at 250 kilometres per hour (155 mph).[2][3][4]

Variants[]

CRH5A[]

In 2004, the Ministry of Railway in China contracted Alstom and CNR Changchun Railway Vehicles to produce 60 sets of the train with a maximum speed of 250 km/h (155 mph). They were ordered around the same time as the Regina-based CRH1A and the Shinkansen-based CRH2A. These trains have been given the designation CRH5A. 30 additional sets were ordered in 2009 and 20 additional sets were ordered in 2010 to complete the current fleet operating on China's northern and eastern lines.[5][6] On April 26, 2011, the MOR ordered an additional 30 sets.

As to the initial 60 sets, the first three were manufactured by Alstom's factory in Italy, and the next six were delivered in complete knock down form and assembled by CNR Changchun Railway Vehicle. The remaining 51 sets were built by CNR Changchun through technology transfer from Alstom.

The first train (CRH5-001A) departed from Savigliano port, Italy on December 11, 2006 and arrive at Dalian port on January 28, 2007. The first CRH5A set made by CNR Changchun (CRH5-010A) was delivered in April, 2007.

The CRH5A sets started service from April 18, 2007, the date of the sixth national railway speed-up at the Beijing-Harbin Railway. In the following years, it opened service at the Jinan-Qingdao high-speed rail and Shijiazhuang-Taiyuan high-speed rail.

Each of the CRH5A set consists of eight cars. The initial 12 sets (CRH5-001A ~ CRH5-012A) have one first-class seating car (ZY), six second-class seating cars (ZE), and one second-class seating/dining car (ZEC). The subsequent sets have two first-class seating cars (ZY) and six second-class seating cars (ZE).

The CRH5A trains experienced a number of failures in early stages. The failures were attributed to new technologies introduced on CRH5A and a relatively short trial run before the first delivery [7][8]

CRH5E[]

CRH5E

CRH5E are cold resistant high speed sleeper trains outfitted with traditional railway sleeping berths (couchette car).[9][10][11]

CRH5G/H[]

CRH5G

CRH5G is a specialized cold and sand/windstorm resistant version of the CRH5 for use on the Baoji–Lanzhou high-speed railway manufactured by CRRC Changchun Railway Vehicles.[12][13][14]

CIT001[]

The CIT001 train at Beijing South

On April 2, 2007, ordered a CRH5-based high-speed test train; the official name of this train set is , name code CIT001. This train is equipped with special devices to monitor the condition of the track, wheel-rail force, overhead wire, communication system and signal system. The train is painted with yellow and white color and started test run on July 1, 2007.[15]

Formation[]

Power Destination

  • M – Motor car
  • T – Trailer car
  • C – Driver cabin
  • P – Pantograph

Coach Type

  • ZY – First Class Coach
  • ZE – Second Class Coach
  • ZYE – First Class/Second Class Coach
  • ZEC – Second Class Coach/Buffet Car

CRH5A

Coach No. 1 2 3 4 5 6 7 8
Type1 ZE ZEC ZE ZY
Type2 ZY ZE ZEC ZE ZY
Power Configuration MC M TP M T TP M MC
Power Units Unit 1 Unit 2
Capacity1 74 93 93 93 93 42 74 60
Capacity2 56 90 90 90 90 40 74 56
  • ^1 Train No.CRH5A-5001 to CRH5A-5012 and CRH5A-5043 to CRH5A-5053
  • ^2 Train No.CRH5A-5013 to CRH5A-5042, CRH5A-5054 to CRH5A-5140 and CRH5G-5141 to CRH5G-5156

Distribution[]

Operator Quantity Series number Lines serving Note
CRH5A
Beijing Railway Bureau 21 CRH5-005A、CRH5-007A、CRH5-009A、CRH5-018A、CRH5-021A、
CRH5-028A、CRH5-029A、CRH5-046A ~ CRH5-055A、
CRH5-063A、CRH5-064A、CRH5-090A、CRH5-091A
Jingha RailwayJinghu Railway
Jingguang RailwayShitai PDL
Jinan Railway Bureau 18 CRH5-061A、CRH5-062A、CRH5-065A ~ CRH5-080A Jinghu RailwayJiaoji PDL
Zhengzhou Railway Bureau 14 CRH5-034A ~ CRH5-043A、CRH5-056A、CRH5-057A、
CRH5-059A、CRH5-060A
Longhai RailwayJingguang RailwayJinghu Railway
Shenyang Railway Bureau 30 CRH5-001A ~ CRH5-004A、CRH5-006A、CRH5-008A、
CRH5-010A ~ CRH5-017A、CRH5-024A ~ CRH5-027A、
CRH5-031A、CRH5-032A、CRH5-058A、
CRH5-081A ~ CRH5-085A、CRH5-088A、CRH5-089A、
CRH5-092A、CRH5-093A
Jingha Railway
Harbin Railway Bureau 6 CRH5-019A、CRH5-020A、CRH5-022A、
CRH5-023A、CRH5-030A、CRH5-033A
Jingha Railway
Taiyuan Railway Bureau 4 CRH5-044A、CRH5-045A、CRH5-054A、CRH5-055A Shitai PDLJingguang Railway
China MOR 1 CIT001 Comprehensive testing train

(as of January 2013)

See also[]

  • China Railways CRH1
  • China Railways CRH2
  • China Railways CRH3
  • China Railways CRH380A
  • List of high-speed trains
  • China Railways CRH6
  • China Railways CIT Trains
  • New Pendolino
  • Avant class 114
  • Pendolino

References[]

  1. ^ "Archived copy". Archived from the original on 2010-02-28. Retrieved 2010-11-06.CS1 maint: archived copy as title (link)
  2. ^ "Archived copy". Archived from the original on 2015-09-23. Retrieved 2010-01-30.CS1 maint: archived copy as title (link)
  3. ^ "Archived copy". Archived from the original on 2011-07-17. Retrieved 2010-01-30.CS1 maint: archived copy as title (link)
  4. ^ "Archived copy". Archived from the original on 2013-02-12. Retrieved 2010-01-30.CS1 maint: archived copy as title (link)
  5. ^ "四方所同长春轨道客车股份有限公司获2亿CRH5型动车组大订单-中国起重机吊车网". Qizhong7.com. Archived from the original on 3 March 2016. Retrieved 15 August 2018.
  6. ^ "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-12-22.CS1 maint: archived copy as title (link)
  7. ^ "Archived copy". Archived from the original on 2012-03-03. Retrieved 2010-01-30.CS1 maint: archived copy as title (link)
  8. ^ "Archived copy". Archived from the original on 2009-10-17. Retrieved 2010-01-30.CS1 maint: archived copy as title (link)
  9. ^ "China to introduce new high-speed trains with fold-out beds and wifi!". Shanghaiist. 2016-11-18. Retrieved 2020-06-09.
  10. ^ "中国制造新型卧铺动车组CRH5E完成空调试验-中新网". www.chinanews.com. Retrieved 2020-06-09.
  11. ^ "我国首列抗高寒卧铺动车组获批量生产资格-新华网". www.xinhuanet.com. Retrieved 2020-06-09.
  12. ^ "Self-developed new train to run on high-speed rail line[6]- Chinadaily.com.cn". www.chinadaily.com.cn. Retrieved 2020-06-09.
  13. ^ "耐寒耐高温抗风沙 CRH5G型技术提升动车组亮相". www.sohu.com. Retrieved 2020-06-09.
  14. ^ "CRH5G型技术提升动车组正式投入宝兰高铁运营". pic.people.com.cn. Retrieved 2020-06-09.
  15. ^ 走自主创新之路,做铁路安全卫士 Archived 2011-07-07 at the Wayback Machine
Retrieved from ""