Guiyang–Nanning high-speed railway
Guiyang–Nanning high-speed railway 贵南高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Locale | Guiyang Nanning |
Termini | Guiyang East |
Service | |
Services | 1 |
Operator(s) | China Railway High-speed |
History | |
Opened | 2023 |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Guiyang–Nanning high speed railway is a high speed line between Guiyang and Nanning in China. The line will be 512 km long, of which 482 km is new track. Travel time between the two cities will be cut from 10 hours to 2.5 when the line opens in 2023.[1] The route will be part of the Baotou (Yinchuan)–Hainan corridor.
History[]
Construction on the railway began in 2018.
Route[]
The line will establish a second route between Longdongbao and Duyun East, before leaving the existing Guiyang–Guangzhou high-speed railway.
Station Name | Chinese | Metro transfers/connections |
Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Guiyang North | 贵阳北 | 1 | Guizhou | |||||||
Guiyang East | 贵阳东 | |||||||||
Longdongbao | 龙洞堡 | Guiyang Longdongbao International Airport 2 | ||||||||
龙里北 | ||||||||||
贵定县 | ||||||||||
Duyun East | 都匀东 | |||||||||
独山东 | ||||||||||
荔波 | ||||||||||
环江 | ||||||||||
河池 | Guangxi | |||||||||
永安镇 | ||||||||||
都安 | ||||||||||
马山 | ||||||||||
南宁北 | ||||||||||
Nanning East | 南宁东 | 1 |
References[]
- ^ "Construction site of Guiyang-Nanning high-speed railway - People's Daily Online". en.people.cn. Retrieved 2020-06-22.
- ^ "贵阳至南宁高铁全面开建 全程运行时间不到2小时-中新网". www.chinanews.com. Retrieved 2020-06-22.
Categories:
- High-speed railway lines in China
- High-speed railway lines under construction
- People's Republic of China rail transport stubs