Line 8 (Tianjin Metro)

From Wikipedia, the free encyclopedia
Line 8
 8 
Lushuidao station line8 platform.jpg
Lushuidao station
Overview
StatusOperational
OwnerTianjin
LocaleTianjin, China
Termini
Stations9
Service
TypeRapid transit
SystemTianjin Metro
Services1
Operator(s)CRCC association
History
Opened28 December 2021; 2 months ago (2021-12-28)
Technical
Line length13.42 km (8.34 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead lines

Line 8 of the Tianjin Metro (Chinese: 天津地铁8号线; pinyin: Tiānjīn Dìtiě Bā Hào Xiàn) is a rapid transit line running from northwest to southeast Tianjin. The Phase I south section of line 8, which was originally called Line 6 Phase 2 during construction, was opened on 28 December 2021.[1] The line is currently 13.42 km long and has 9 stations.

This is the first metro line in Tianjin that uses Type A six car, GoA4 automated trains.

Opening timeline[]

Segment Commencement Length Station(s) Name
Lushuidao — Xianshuiguxi 28 December 2021 13.42 km (8.34 mi)[2] 9 Line 6 Phase 2 (before 2020)

(1st section)

9 January 2022 Temporary ceased operation due to COVID-19 pandemic
Lushuidao — Hehuinanlu
(except Shuanggang)
27 January 2022 service resumed
Shuanggang 30 January 2022
Xianshuiguxi 31 January 2022
Lüshuigongyuan — Lushuidao 2025 18 Phase 1 (2nd section)

Stations (northwest to southeast)[]

Station name Connections Bus Connections Distance
km
Location
English Chinese
中北镇 Nankai
福姜路
延安路
雅安道
绿水公园
兰坪路
鞍山西道  6 
南丰路   
六里台   
Xikanglu 西康路  3  Heping
成都道
马场道 Hexi
人民公��
Xiawafang 下瓦房  1   5 
湘江道
Tucheng 土城  1    
澧水道   
梅江道东
南珠桥   
沂山路 Jinnan
长泰河东    Hexi
渌水道  6  304 613 753 Jinnan
双港 215 304 613
景荷道
景荔道
天津大学北洋园校区 205 214区间 216 612
海河教育园区 205 214区间 216 612
南开大学津南校区 131
和慧南路
咸水沽西 219 226西线 930

References[]

  1. ^ "官宣!12月28日天津这两条地铁线路开通运营". 北方网. Retrieved 2021-12-26.
  2. ^ "4号线南段与6号线二期将于年内载客试运营 两条地铁线路进入空载试跑��段". 2021-10-29.
Retrieved from ""