Jakarta-Cikampek II South Toll Road

From Wikipedia, the free encyclopedia
Rambu petunjuk 4a.svg
Jakarta-Cikampek II South Toll Road
Trans-Java Toll road en.svg
Route information
Part of AH2
Maintained by PT Jasamarga Japek Selatan
(PT Jasa Marga Tbk and PT Wira Nusantara Bumi}
Length62 km (39 mi)
Major junctions
FromJatiasih
Major intersectionsJakarta Outer Ring Road
Purbaleunyi Toll Road
ToSadang
Location
Major citiesJakarta, Bandung
Highway system

Jakarta-Cikampek II South Toll Road is an under-construction toll road which connects Jakarta Outer Ring Road atJatiasih and Purbaleunyi Toll Road at Sadang in Java, Indonesia[1].The goal of constructing this toll road is to reduce frequent congestion in Jakarta-Cikampek Toll Road, which will also serve as an alternative route from Jakarta to Bandung or vice versa. The toll road is 62 kilometers long, and will have gates at Jatiasih, Bantar Gebang, Setu, Sukaragam, Taman Mekar, Kutanegara, and Sadang.[2] The toll road is a complementary road for Trans-Java Toll Road, and is expected to be operational by 2020.[3]

Sections[]

The toll road has three sections,[4]

  • Section 1: Jati Asih - Setu, 9.3 kilometers
  • Section 2: Setu - Taman Mekar, 24.85 kilometers
  • Section 3: Taman Mekar - Sadang, 27.85 kilometer.

See also[]

  • Trans-Java toll road

References[]

  1. ^ "Jakarta-Cikampek II Toll Road Targeted to Operate in 2020". Tempo. Retrieved 20 July 2019.
  2. ^ "Pembebasan lahan Tol Japek II Selatan akan dikebut". Retrieved 20 July 2019.
  3. ^ "Ini Progres Pembangunan Jalan Tol Jakarta Cikampek II Selatan". Tempo. Retrieved 20 July 2019.
  4. ^ "Konstruksi Tol Jakarta-Cikampek II Selatan Sudah Dimulai". Kompas. Retrieved 20 July 2019.
Retrieved from ""