Tangerang–Merak Toll Road

From Wikipedia, the free encyclopedia

Coordinates: 06°10′56.84″S 106°47′35.01″E / 6.1824556°S 106.7930583°E / -6.1824556; 106.7930583

Tangerang-Merak Toll Road
Banten Highway
Route information
Part of AH2
Maintained by PT Marga Mandala Sakti dba Astra Infra Toll Road Tangerang-Merak
(Astra International)
Length72 km (45 mi)
Major junctions
East endCikupa IC
Major intersectionsJakarta–Tangerang Toll Road
Jakarta Outer Ring Road 2
Serpong–Balaraja Toll Road (Planned)
West endMerak
Location
Major citiesTangerang Regency, Lebak Regency, Serang, Cilegon
Highway system

The Tangerang–Merak Toll Road ( AH2), also known as the Banten highway, is part of the Trans-Java toll road. It is the second toll road constructed in Indonesia, following the Jagorawi Toll Road in 1981. This highway connects Tangerang and the port of Merak on the north-western tip of Java, which further connects by ferry to Sumatra island. The road passes through Cikupa, Balaraja, Kragilan, Ciujung, Serang, Cilegon, and Merak.

Further investment is underway. In mid-2012, the toll road operator, PT Marga Mandala Sakti, recently acquired by Astra International Tbk, said that construction of all parts of the road to connect with the port of Merak was almost complete.[1]

Payment[]

The fee for this road can be paid using e-toll

Fee[]

Route Gol. 1 Gol. 2 Gol. 3 Gol. 4 Gol. 5
Cikupa - Cikupa
Serang Timur - Serang Barat
2,50 4,00 4,50 6,00 7,00
Cilegon Timur–Cilegon Barat 4,00 5,50 6,50 8,50 10,50
Serang Barat–Cilegon Timur 5,00 6,50 8,00 10,50 12,50
Cikupa–Balaraja Timur 5,00 7,00 8,50 11,00 13,00
Cilegon Timur–Merak 5,50 8,00 9,50 12,50 15,00
Ciujung–Serang Timur 6,00 8,50 10,00 13,00 16,00
Cikupa–Balaraja Barat 6,50 9,00 10,50 14,00 16,50
Serang Timur–Cilegon Timur 7,50 10,50 12,50 16,50 19,50
Ciujung–Serang Barat
Serang Barat - Cilegon Barat
9,00 12,00 14,50 19,00 23,00
Balaraja Barat–Ciujung 10,50 14,50 17,00 22,50 27,00
Serang Barat–Merak 11,50 14,50 17,50 23,00 27,50
Serang Timur–Cilegon Barat 11,50 16,00 19,00 25,00 30,00
Serang Timur–Merak 13,00 18,50 21,50 28,50 34,50
Ciujung–Cilegon Timur 13,50 19,00 22,50 29,50 35,50
Balaraja Barat–Serang Timur 16,50 23,00 27,00 35,50 43,00
Cikupa–Ciujung 16,50 23,00 27,50 36,00 43,50
Ciujung–Cilegon Barat 17,50 24,50 29,00 38,00 46,00
Balaraja Barat–Serang Barat 19,00 26,50 31,50 41,50 50,00
Ciujung–Merak 19,50 27,00 32,00 42,00 50,50
Cikupa–Serang Timur 23,00 31,50 37,50 49,50 59,50
Balaraja Barat–Cilegon Timur 24,00 33,50 39,50 52,00 62,50
Cikupa–Serang Barat 25,00 35,50 42,00 55,00 66,50
Balaraja Barat–Cilegon Barat 28,00 38,50 46,00 60,50 73,00
Balaraja Barat–Merak 29,50 41,00 49,00 64,00 77,50
Cikupa–Cilegon Timur 30,50 42,00 50,00 65,50 79,00
Cikupa–Cilegon Barat 34,50 47,50 56,50 74,50 89,50
Cikupa–Merak 36,00 50,00 59,50 78,00 94,00

Exits[]

Toll Gate KM Destination
Cikupa 31 Cikupa
Cikande (planned) 52 Cikande
Industrial Site (planned)
Ciujung 60 Ciujung
Serang Timur 72

Pandeglang
Serang Barat 78
Cilegon Timur 87
Cilegon Barat 95
Anyer
Carita
Merak 98

Elevated toll road section[]

To overcome floods of Ciujung River in kilometer 57 to 59 which happened in 2012 and 2013, the operator has planned to elevated the toll road certain section by 2.7 meter height above the existing toll road with prediction cost Rp.300 billion ($25 million) for 2.5 kilometer elevated toll road as Prof. Dr. Ir. Soedijatmo Toll Road (Soekarno–Hatta Toll Road).[2]

See also[]

References[]

  1. ^ 'Tengerang-Merak toll road nears completion.', The Jakarta Post, 16 June 2012.
  2. ^ "Merak toll road to get new, elevated section". March 26, 2014.

External links[]


Retrieved from ""