Line 3 (Zhengzhou Metro)
Line 3 | |
---|---|
3 | |
![]() Train 0312 approaching Haitansi Station | |
Overview | |
Status | Operating |
Owner | Zhengzhou |
Locale | Zhengzhou, Henan, China |
Stations | 21 |
Service | |
Type | Rapid transit |
System | Zhengzhou Metro |
Operator(s) | Zhengzhou Metro Group Corporation |
History | |
Opened | December 26, 2020 |
Technical | |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Line 3 of Zhengzhou Metro (Chinese: 郑州地铁3号线; pinyin: zhèngzhōu dìtiě sānhào xiàn) is a rapid transit line in Zhengzhou that runs in a northwest - southeast direction. The line uses six car Type A trains.[1] The line opened on December 26, 2020.[2]
Opening timeline[]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Henan Sports Center — Henan Orthopaedics Hospital | 26 December 2020 | 25.488 km (15.8 mi)[3] | 19 | Phase 1 |
Henan Orthopaedics Hospital — Yinggang | 26 June 2021 | 2 | ||
Yinggang — Binhexinchengnan | 2024 (Planned) | 6.305 km (3.918 mi)[4] | 4 | Phase 2 |
Stations[]
![](http://upload.wikimedia.org/wikipedia/commons/thumb/e/e2/Route_Map_of_Zhengzhou_Metro_Line_3.png/400px-Route_Map_of_Zhengzhou_Metro_Line_3.png)
Map of Zhengzhou Metro Line 3.
Phase I[]
Station
№ |
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
0321 | 省体育中心 | 4 | Huiji | |||
0322 | 王砦 | |||||
0323 | 兴隆铺 | |||||
0324 | 同乐 | (U/C) | Jinshui | |||
0325 | 南阳新村 | |||||
0326 | 海滩寺 | 5 | ||||
0327 | 大石桥 | (U/C) | ||||
0328 | 人民公园 | Erqi | ||||
0329 | Erqiguangchang | 二七广场 | 1 | |||
0330 | 西大街 | Guancheng | ||||
0331 | Dongdajie | 东大街 | 2 | |||
0332 | 郑州文庙 | |||||
0333 | 博览中心 | 6 (U/C) | ||||
0334 | 凤凰台 | Jinshui | ||||
0335 | 东十里铺 | 4 | ||||
0336 | 通泰路 | |||||
0337 | 西周 | (U/C) | Guancheng | |||
0338 | 东周 | |||||
0339 | 省骨科医院 | 5 | ||||
0340 | 圃田西 | (U/C) | ||||
0341 | 营岗 | |||||
Phase II[]
- Opening in 2024.
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
潮河 | |||||
滨河新城 | |||||
司赵 | |||||
滨河新城南 | |||||
References[]
- ^ "郑州市轨道交通3号线一期工程人防工程防护设备、安装及相关服务采购项目A包、B包、C包、D包招标公告". 2019-03-29. Retrieved 2019-10-23.
- ^ "First-stage of Metro line three, Metro line four in Zhengzhou starts operation - Xinhua | English.news.cn". www.xinhuanet.com. Retrieved 2020-12-28.
- ^ "郑州地铁3号线一期、4号线正式开通". 2020-12-26.
- ^ "郑州地铁6号线、3号线二期消息:涉及站点、工期等". 2020-01-08.
Categories:
- Zhengzhou Metro lines
- Railway lines opened in 2020
- 2020 establishments in China