Line 4 (Fuzhou Metro)
Line 4 | |
---|---|
4 | |
Overview | |
Status | Under Construction |
Owner | City of Fuzhou |
Locale | Fuzhou, China |
Termini | Banzhou Difengjiang |
Stations | 23 (Phase 1) |
Service | |
Type | Rapid transit |
System | Fuzhou Metro |
Services | 1 |
Operator(s) | Fuzhou Metro Co., Ltd. |
History | |
Opened | 2022 (scheduled) |
Technical | |
Line length | 28.4 km (17.65 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Banzhou and ends at Difengjiang. The total length is 28.4 km. Line 4's color is yellow. This line was scheduled to begin the construction in 2017 and end in 2022.
Stations[]
English |
Chinese |
|||
半洲 | Island (Underground) | |||
建新 | Island (Underground) | |||
洪塘 | Island (Underground) | 5 | ||
金牛山 | Island (Underground) | |||
凤凰池 | Island (Underground) | |||
陆庄 | Island (Underground) | |||
西门 | Island (Underground) | |||
Dongjiekou | 东街口 | Island (Underground) | 1 | |
省立医院 | Island (Underground) | |||
东门 | Island (Underground) | |||
三角池 | Island (Underground) | |||
竹屿 | Island (Underground) | |||
横屿 | Island (Underground) | |||
后屿 | Island (Underground) | |||
Qianyu | 前屿 | Island (Underground) | 2 | |
光明港 | Island (Underground) | |||
鳌峰洲 | Island (Underground) | |||
花海公园 | Island (Underground) | |||
会展中心 | Island (Underground) | |||
林浦 | Island (Underground) | 6 | ||
Chengmen | 城门 | Island (Underground) | 1 | |
螺洲温泉 | Island (Underground) | |||
帝封江 | Island (Underground) | 5 | ||
References[]
Categories:
- Fuzhou Metro lines
- Proposed railway lines in China