Line 5 (Changsha Metro)

From Wikipedia, the free encyclopedia
Line 5
 5 
Train of Metro Line 5 in Furong District Government Station.jpeg
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
TerminiMaozhutang
Shuiduhe
Stations18
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
History
Opened28 June 2020
Technical
Line length22.5 km (13.98 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 5 of the Changsha Metro (Chinese: 长沙地铁五号线; pinyin: Chǎngshā Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Changsha. The line opened on 28 June 2020[2] with 18 stations.

Opening timeline[]

Segment Commencement Length Station(s) Name
Maozhutang — Shuiduhe 28 June 2020 22.5 km (13.98 mi)[1] 18 Phase 1

Stations[]

Section Station name Connections Distance
km
Location
English Chinese
Phase 1 Maozhutang 毛竹塘
Bantangchong 板塘冲
Datang 大塘
Yuhua District Government 雨花区政府
Muqiao 木桥
Guitang 圭塘  4 
South Gaoqiao 高桥南
North Gaoqiao 高桥北
Furong District Government 芙蓉区政府  6 
Wanjiali Square 万家丽广场  2 
Mawangdui 马王堆
Huojucun 火炬村
Yazipu 鸭子铺
Malanshan 马栏山
North Yuehu Park 月湖公园北  3 
Baimaopu 白茅铺
Tuqiao 土桥
Shuiduhe 水渡河

References[]

  1. ^ a b "长沙地铁3、5号线一期工程将于近期开通初期运营".
  2. ^ "长沙地铁3号线5号线预计6月28日载客初期运营". 2020-06-25.
Retrieved from ""