Metrocenter station
Metrocenter | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Valley Metro Rail light rail station | |||||||||||
Location | Phoenix, Arizona United States | ||||||||||
Coordinates | 33°34′29″N 112°07′03″W / 33.574754°N 112.117595°WCoordinates: 33°34′29″N 112°07′03″W / 33.574754°N 112.117595°W | ||||||||||
Owned by | Valley Metro | ||||||||||
Operated by | Valley Metro Rail | ||||||||||
Line(s) | Northwest Extension Phase II | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | Valley Metro Bus: 27, 35, 90, 106, I-17 Rapid. | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Disabled access | |||||||||||
History | |||||||||||
Opening | 2024 | ||||||||||
Future services | |||||||||||
|
Metrocenter is an under-construction elevated light rail station on the Valley Metro system in Phoenix.[1] It is the northern terminus of the Northwest Extension Phase II, located on the east side of the former Metrocenter mall. The station includes a park and ride facility and relocated bus transit hub. It is the first elevated station in the system and is expected to open in 2024.[2]
As of 2020 the Metrocenter Transit Center is served by Valley Metro Bus Routes 27, 35, 90, 106, and the I-17 Rapid.
References[]
- ^ Caraveo, Chris (24 July 2020). "Construction on light rail extension in north Phoenix begins in August". Daily Independent. Retrieved 23 September 2020.
- ^ Anderson, Jake (28 August 2020). "Phoenix gets $50M in federal funds for northwest Valley light rail extension". KTAR News 92.3 FM. Retrieved 24 September 2020.
Categories:
- Valley Metro Rail stations in Phoenix, Arizona
- Railway stations scheduled to open in 2024
- Railway stations under construction in the United States
- Future Valley Metro Rail stations
- Bus stations in Arizona
- Western United States railway station stubs
- Arizona building and structure stubs
- Arizona transportation stubs