Valley Metro Rail

From Wikipedia, the free encyclopedia

Valley Metro Rail
METRO Phoenix logo.png
Phoenix Exterior 7417.2008.jpg
Valley Metro, downtown Phoenix, 2008
Overview
OwnerValley Metro
LocalePhoenix-Tempe-Mesa, Arizona, United States
Termini19th Avenue/Dunlap
Gilbert Road/Main Street
Stations38 (List of stations)
Websitevalleymetro.org/maps-schedules/rail
Service
TypeLight rail
SystemValley Metro Rail
Services1
Operator(s)Alternate Concepts, Inc.
Rolling stockKinki Sharyo LF LRV
Daily ridership50,009 (2017)
History
OpenedDecember 27, 2008; 12 years ago (December 27, 2008)
Technical
Line length28.2 mi (45 km)[1]
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead catenary 750 V
hide
Route map

Legend
Mountain View/25th Avenue
25th Avenue/Dunlap
Northwest Extension Phase 2 (2024)
19th Avenue/Dunlap
Northern/19th Avenue
Glendale/19th Avenue
19th Avenue/Montebello
19th Avenue/Camelback
7th Avenue/Camelback
Central Avenue/Camelback
Campbell/Central Avenue
Indian School/Central Avenue
Osborn/Central Avenue
Thomas/Central Avenue
Encanto/Central Avenue
McDowell/Central Avenue
Roosevelt/Central Avenue
McKinley Loop
Van Buren/
1st Avenue
Van Buren/
Central Avenue
Jefferson/
1st Avenue
Washington/
Central Avenue
South Central Extension (2024)
3rd Street/
Jefferson
3rd Street/
Washington
5th Street Loop
12th Street/
Jefferson
12th Street/
Washington
24th Street/
Jefferson
24th Street/
Washington
38th Street/Washington
44th Street/Washington enlarge… Airport interchange
50th Street/Washington
Operations and Maintenance Center
Priest Drive/Washington
Center Parkway/Washington
Mill Avenue/Third Street
Veterans Way/College Avenue
University Drive/Rural
Dorsey/Apache Boulevard
McClintock/Apache Boulevard
Smith–Martin/Apache Boulevard
Price–101 Freeway/Apache Boulevard
Sycamore/Main Street
Alma School/Main Street
Country Club/Main Street
Center/Main Street
Mesa Drive/Main Street
Stapley/Main Street
Gilbert Road/Main Street
Handicapped/disabled access all stations accessible

Valley Metro Rail (styled corporately as METRO) is a 28.2-mile (45 km)[1] light rail line serving the cities of Phoenix, Tempe, and Mesa in Arizona, USA. The network, which is part of the Valley Metro public transit system, began operations on December 27, 2008. The line carried 49,416 passengers per day in 2016,[2] making it the 14th busiest light rail system in the country.

In the years since it opened in 2008, the system has undergone two expansions, with at least five more scheduled, including the Tempe Streetcar. Furthermore, extensions are planned into West Phoenix and South Phoenix to Baseline Road, all of which were expanded as a direct result of obtaining funding under the Proposition 104 sales tax increase.

Cost and infrastructure[]

The expected construction cost for the initial 20 miles (32 km) was $1.4 billion, or $70 million per mile.[3] In 2008, Valley Metro estimated the train would cost $184 million to operate over the following five years with fares covering $44 million of the operation costs and tax subsidies covering the remaining costs.[4]

Trains operate on city streets in a "center reservation", similar to the Red Line of the METRORail light rail system in Houston, the surface sections of the MBTA subway's Green Line in Boston, and some surface sections of the Muni Metro in San Francisco and TRAX in Salt Lake City. Some parts of the line, such as the bridge over Tempe Town Lake (near State Route 202), have no contact with other traffic. The vehicles used are rated for a maximum speed of 58 miles per hour (93 km/h), and have to complete the 28 miles (45 km) route in just over 90 minutes, including station stops.[5] The system is powered by an overhead catenary that supplies power at 750 volts.[6]

History[]

A driver waits for the light to turn green

Numerous plans have preceded the current implementation of light rail. The Phoenix Street Railway provided streetcar service from 1887 to 1948. Historic vehicles may be seen at the Arizona Street Railway Museum, with Car #116 celebrating her 80th birthday on December 25, 2008, just days before the opening of modern rail service. In 1989, the ValTrans elevated rail proposal was turned down by voters in a referendum due to cost and feasibility concerns.[7] Subsequent initiatives during the 1990s failed over similar reasons.

Metro was created by the Transit 2000 Regional Transportation Plan (RTP), also called the Transit 2000 plan, which involved a 0.5 per cent sales tax, and was approved by Phoenix voters in 2000. Transit 2000 aimed at improving the local bus service (considered unacceptably inadequate compared to other major US cities) and the formation of bus rapid transit and light rail, among other things, which was seen as a more affordable approach. It used the route placing and color designations from the 1989 ValTrans plan.

Construction on the new light rail line began in March 2005.[citation needed] In March 2008, cracks in the system's rails were discovered. The cause of the cracks was determined to be improper use of plasma cutting torches by contractors.[8] The affected track was repaired by May at a cost of $600,000 with still no word on which parties will be held financially responsible.[9] The last of the concrete and rail for the system was installed in the end of April, with the CEO declaring the system to be on time and on budget.[10]

Construction on the initial light rail segment, 2007

There are 28 stations on the initial twenty-mile (32 km) starter segment. The line celebrated its grand opening on December 27, 2008, with official ribbon-cutting ceremonies and community celebrations throughout Phoenix, Tempe, and Mesa. The event was produced by Arizona's Entertainment Solutions, Inc.[11] and was attended by thousands of local residents who waited as long as an hour or more to ride the vehicles.[12][13] The stations have been designed to complement their immediate surroundings.[14] Station platform areas are approximately 16 feet (4.9 m) wide by 300 feet (91 m) long.

As of early 2014, income has exceeded Metro's stated goal with 44.6% farebox recovery, partially due to the light rail ridership far exceeding original projections. The light rail has also led to rapid urban development in downtown Phoenix and Tempe, generating additional revenue through taxes.

Valley Metro had its busiest month in April 2017, with a total passenger count of 1,514,456 and an average weekday ridership of 52,910. On the weekend of March 31, 2017, through April 2, 2017, the light rail system saw 275,615 passengers board the train due to several large events including Final Four Fan Fest, March Madness Music Festival, Arizona Diamondbacks home opener, Phoenix Pride Festival, Phoenix Suns game, and Tempe Festival of the Arts. That Sunday, April 2, 2017, they saw 80,210 passengers board the train thanks to fans attending the Arizona Diamondbacks home opening game as well as the other large events occurring that weekend.[15]

Central Mesa Extension[]

The Central Mesa Extension extended rail service 3.1 miles (5.0 km) from the line's original eastern terminus at Sycamore Street in the median of Main Street to Mesa Drive.[16] It added four stations at Alma School Road, Country Club Drive, Center Street, and Mesa Drive. In March 2012, Valley Metro selected a design-build joint venture between Kiewit Corporation and Mass. Electric to construct the extension.[17] Construction began in July 2012 and passenger service began on August 22, 2015.[18] Mesa held a summit in early 2012 to have urban developers give their ideas on how to revitalize Downtown Mesa.[19] The extension cost $200 million, paid for from a combination of Proposition 400 sales tax revenues and federal air quality and New Starts grants, and is estimated to have added 5,000 daily riders.[16]

Northwest Phase I[]

Dunlap Avenue station in March 2016

Phase I of the Northwest Extension was the first to extension within the Phoenix city limits. The system was extended north from the previous terminus at Montebello Avenue along the median of 19th Avenue to a new terminus and park and ride at the southwest corner of 19th Avenue and Dunlap Avenue. The extension features two additional stations, located at Northern Avenue and Glendale Avenue and is predicted to serve 5,000 riders per day in its first full year of operation.

As an original part of the Transit 2000 plan, this extension was originally scheduled to open by 2012.[20] However, a combination of lower than expected sales tax revenues, combined with uncertainty surrounding the availability of federal funds to support the project resulted in the opening date being pushed back initially to 2014, and then by 9 years, to fiscal year 2023, by the Phoenix City Council in June 2009.[21]

In July 2012, a vote was held to reschedule this extension to open in 2016. Under this plan, the city of Phoenix advanced $60 million of local funds to Valley Metro Rail, who would then fund the remaining cost of the project (approximately $267 million) with both Transit 2000 and Proposition 400 funds,[22] thereby allowing work on the project to begin.

Phoenix light rail outside the Phoenix Convention Center, 2009

The design-build contract was awarded to a joint venture of Sundt and Stacy and Witbeck, for the 3.2-mile (5.1 km) extension.[23] Construction began in January 2013,[24] with a celebration to mark the laying of the first track section being held in July 2014.[25] Construction work continued until December 2015, when it was announced the extension would open March 19, 2016, and that testing along the new stretch would continue.[26][27]

50th Street infill station[]

The 50th Street infill station project adds a new station to the existing alignment at 50th Street and Washington. The project aimed to enable better connectivity with nearby businesses, and recent commercial and residential development projects in the area.[28]

The project, funded entirely by the City of Phoenix, began construction in June 2017; service to the new station started on April 25, 2019.[29]

Gilbert Road Extension[]

An extension further eastward, 1.9 miles (3.1 km) past the current terminus at Mesa Drive to Gilbert Road, began construction in October 2016,[30] and began operating on May 18, 2019.[31][32] The line, budgeted at approximately $184 million, travels in the median of Main Street and has one intermediate stop at Stapley Drive. The design-build contract for this project was awarded to Sundt/Stacy and Witbeck, with Jacobs Engineering providing design services for the project.[33][34] Service to the new stations started on May 18, 2019.

Proposition 105 and South Extension[]

After voters approved a tax measure in August 2015 to fund transportation, the City of Phoenix moved the timeline of the light rail extension to South Phoenix up by a decade.[citation needed] Outreach to the residents and business owners of South Phoenix became strained when the extension called for the reduction of lanes from four to two along Central Avenue.[35] In February 2019, opponents were able to gather enough signatures to require the city to hold a referendum on future light rail expansion.[36] The referendum to stop light rail expansion, known as Proposition 105, failed to pass in a special election on August 27, 2019.[37] Construction on the South Central extension began in October 2019[38] and it is expected to be operational by 2024.[39]

Operations[]

Route description[]

System map since opening the Gilbert Road extension.

As of 2019, the Valley Metro Rail system consists of one single line serving all 38 stations total, and denoted with a gold-yellow color on Valley Metro publications.[40] The line starts in Phoenix at the 19th Avenue/Dunlap station on its own right-of-way south of Dunlap Avenue, before turning south on 19th Avenue for 4 miles (6.4 km). It then turns eastward on Camelback Road for 2.5 miles (4.0 km), then turns south onto Central Avenue where it continues all the way into Downtown Phoenix. At Roosevelt, the line splits into one-way segments: Mesa-bound service runs on First Avenue south before turning east on Jefferson Street; likewise, Dunlap-bound one-way service starts at 26th Street on Washington Street before turning north on Central Avenue.

After both tracks rejoin east of 24th Street on Washington Street, it continues past Sky Harbor Airport – which is connected by the PHX Sky Train at 44th Street/Washington – then turns southeast toward Tempe. The line leaves Washington Street and crosses Tempe Town Lake on its own bridge parallel to the Union Pacific Railroad before turning east along Mill Avenue and then proceeding via its own right-of-way near ASU. Going southward, it joins Apache Boulevard headed eastward, which becomes Main Street in the city of Mesa, where the light rail line ends at an intersection with Gilbert Road.

Hours and headways[]

Full service on the line begins Monday through Friday at approximately 4:30 a.m., while Saturday and Sunday service begins at approximately 4:50 a.m.[41] Service ends at approximately 1 a.m. Monday through Thursday nights, weekend service ends at 3:25 a.m. Friday and Saturday mornings, with Sunday service ending at approximately 12:30 a.m. Monday morning.[41]

Due to the fact a complete light rail trip takes approximately 90 minutes from end to end, trains departing at 11 p.m. for example end by 12:25 a.m. In the early morning and late night hours, limited service operates eastbound service from Priest Drive/Washington to Gilbert Road and westbound from 50th Street/Washington to Dunlap Avenue. This limited service extends the line's operating hours to as early as 3:30 a.m. all days, as late as 1:20 a.m. Sunday through Thursday, and as late as 4:20 a.m. on Friday and Saturday.[41] Every day, 1–4 eastbound PM rush hour trips short-turn at 44th Street/Washington and 1–4 westbound PM rush hour trips short-turn at Priest Drive/Washington.[41]

Weekday frequencies consist of every 12 minutes, Saturday daytime service every 15 minutes and Sunday and evening service being every 20 minutes.[41]

Rolling stock[]

As of 2020, Valley Metro Rail operates a fleet of 50 Kinki Sharyo Low Floor Light Rail Vehicles (LRVs), which were built exclusive to VMR. Each vehicle has a seated capacity of 66.[42] Due to the desert climate of the Phoenix area the units were designed with more insulation and solar reflective windows as well as larger air conditioner units.[43] The vehicles are accessible with space for four wheelchairs and four bicycles, per vehicle with addition to a hydraulic levelling system to remove potential vertical gap, to ease loading.[44] Up to three vehicles may operate together in a single train set but are typically in sets of two.[45] The vehicles have a maximum speed of 58 mph (93 km/h).[46] The LF-LRVs are also equipped with energy absorbent bumpers to reduce the effects of road vehicle collision; such necessary due to the light rail mostly running in the center of streets.[1]

In 2017, Valley Metro contracted Brookville Equipment Corporation and Siemens Mobility for six and 11 light rail vehicles, respectively, with the Brookville fleet planned to be used for Tempe Streetcar service.[47] The first Siemens car arrived in March 2020[48] and the first Brookville car for Tempe in March 2021.[49]

Manufacturer Model Quantity Fleet numbers Years in service
Kinki Sharyo Low Floor Light Rail Vehicle[42] 50 101–150 2008–present
Brookville Liberty Streetcar[50] 6[47] TBA 2021 (planned)[51]
Siemens S700[52][a] 25 (53 options)[47][54] 201–225 2020 (planned)[55]

Fares[]

Valley Metro Rail shares its fare system with the Valley Metro Bus system, but uses a proof-of-payment system to allow for simplified boarding and platform access. Tickets can be purchased from ticket vending machines at the entrance to all stations but must be validated before boarding the train.[56]

Fare inspections are conducted throughout the system at random to ensure compliance. As of 2015, the system has a fare-compliance rate of 94%.[57]

Future extensions and improvements[]

Tempe Streetcar (2021)[]

Phoenix light rail at night on Tempe Town Lake, 2008

Tempe Streetcar will consist of 14 stations, running from Dorsey Lane west on Apache Boulevard, then north on Mill Avenue.[58] From there, it will loop around Downtown Tempe along Mill and Ash avenues.[59] The route continues along Rio Salado Parkway to Marina Heights, with a possible extension to Mesa to connect with the Chicago Cubs new spring training facility, as well as Tempe Marketplace.[60][61] Service is expected to begin in 2021.[51]

South Central Extension (2024)[]

hide
South Central Extension
Legend
Washington/
Central Avenue
Jefferson/
3rd Avenue
Downtown Hub
Lincoln/
1st Avenue
Lincoln/
Central Avenue
Buckeye/Central Avenue
Pioneer/Central Avenue
Broadway/Central Avenue
Roeser/Central Avenue
Southern/Central Avenue
Baseline/Central Avenue
Handicapped/disabled access all stations accessible

The South Central Extension will run from Downtown Phoenix, south along Central Avenue to Baseline Road, adding 4.9 miles (7.9 km) and seven stations, while connecting with two park and ride locations.[62]

Additionally, this project will form a light rail hub in Downtown Phoenix, between Central and First avenues to the west and east, and Washington and Jefferson streets to the north and south. Also included are new tracks for turn-around / staging purposes at both Third Avenue and Fifth Street for enhanced flexibility during peak service.[63] Trains along the segment are planned to operate as a new line, originating at Baseline Road and running to the Downtown Hub before interlining with the existing light rail system and continuing north to the terminus at Dunlap Avenue/19th Avenue.[64]

After receiving environmental approval from the Federal Transit Administration (FTA) in January 2017,[65] the project entered the design phase. Construction began in 2019, with completion expected in 2024.

Northwest Phase II (2024)[]

Upon completion of Northwest Phase I, focus shifted to Phase II of the project. Estimated to be complete by 2024,[66] this extension will continue west on Dunlap Avenue before turning to head north along 25th Avenue. From there, the system will head west on Mountain View Road, before crossing Interstate 17 and terminating on the east side of Metrocenter Mall. The extension is expected to include three new stations, one in the vicinity of 25th Avenue and Dunlap, another adjacent to the Rose Mofford Sports Complex and a relocated transit center on the east side of Metrocenter Mall.[33]

By October 2017, the project had entered the environmental assessment (EA) phase.[67][68] The construction contract was awarded to Kiewit-McCarthy in July 2020 and is scheduled to break ground in the Fall.[69]

Capitol/I-10 West Extension (Phase I: 2024, Phase II: 2030)[]

hide
Capitol / I-10 West
Legend
67th Avenue
59th Avenue
51st Avenue
35th Avenue
I-10
Papago Freeway
21st Avenue/Van Buren
Phase 2 (2030)
Phase 1 (2024)
17th Avenue
7th Avenue
Jefferson/
3rd Avenue
Washington/
3rd Avenue
Jefferson/1st Avenue
3rd Street/
Jefferson
3rd Street/
Washington
Handicapped/disabled access all stations accessible

The Capitol/I-10 West Extension will run from Downtown Phoenix from Central Station and 1st Avenue/Jefferson west to Interstate 17 and turn north to the interchange of Interstate 10 and I-17 ("The Stack"). Then the line will turn west and continue down I-10 in the median past 43rd Avenue. It will then go over the westbound lanes of I-10 to continue alongside the highway to the , adding 11 miles (18 km) and 11 stations to connect the West Valley and ease congestion on Interstate 10. The line will transfer over I-10 from the median to the shoulder to accommodate the proposed extension of Loop 202, which will connect with I-10 around 51st Avenue.[70] By 2020, Valley Metro was also studying the possibility of extending the terminus to the Desert Sky Transit Center, adjacent to the Desert Sky Mall.[71]

As of 2020 both phases are in the final stages of the environmental assessment, with Phase I of the project expected to begin operations in 2024. Phase II operations are scheduled to begin in 2030.[72]

West Phoenix/Glendale[]

Map of Metro Light Rail system, showing starter line and future expansion corridors

Starting in 2013, Valley Metro along with the cities of Glendale and Phoenix approved a project to study the potential extension of light rail, bus rapid transit or streetcar to Glendale. Initially, three different route options were proposed, all of which headed west from the current light rail system and featured a shared terminus in the Downtown Glendale area. Options included travel directly across Glendale Avenue, as well as routes that travel along Camelback Road and a combination of 43rd and 51st avenues, before entering the shared downtown terminus area.

In February 2016, a community working group recommend a route for this project, this route travels along Camelback Road until 43rd Avenue, at which point light rail would travel north along 43rd Avenue until Glendale Avenue, from there it would continue west until it reaches 56th Avenue, where the route is likely to shift approximately 500 feet (150 m) north to Glenn Drive, where it will continue to the downtown terminus. Light rail was selected as the preferred type of transit for the route, as opposed to bus rapid transit or streetcar.[73]

On October 17, 2017, Glendale City Council directed staff against moving forward on a route into downtown Glendale, effectively killing the plans for the Glendale portion of the extension.[74] At the beginning of 2019, Phoenix City Council voted to indefinitely delay the remaining Phoenix portion of the project.[75]

Future extensions[]

As of 2019, an extension was planned to occur to Arizona State University's West campus in 2044.[33] A previous study into a Northeast light rail corridor has been suspended indefinitely, with Phoenix City Council directing funds towards street maintenance instead.[76]

As of 2019, extensions of streetcar and light rail in Tempe, Mesa, and Chandler were being studied.[77][78][79]

Northeast extension[]

A northeast extension to Paradise Valley Mall, closely following Arizona State Route 51 is also being considered.[when?][by whom?][80][non-primary source needed]

See also[]

Explanatory notes[]

  1. ^ The first 11 of these were model S70 at the time the order was placed, but in 2020 they were retroactively rebranded as model S700 by Siemens.[53]

References[]

  1. ^ Jump up to: a b "Light rail to reach eastern end of the line with opening of Mesa extension". azcentral. Retrieved August 6, 2019.
  2. ^ "Valley Metro Rail – Ridership Report (FY2016)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
  3. ^ "FAQs and Fast Facts" (pdf). – ValleyMetro.org. Archived December 17, 2007, at the Wayback Machine
  4. ^ "Coping with light-rail costs". archive.azcentral.com.
  5. ^ "Valley Metro Rail – Timetable". March 19, 2016. Retrieved March 20, 2016.
  6. ^ "Fast facts" (PDF). ValleyMetro.org. September 14, 2011. p. 6. Retrieved August 10, 2014.
  7. ^ Phoenix Transit Elections. – Arizona Rail Passenger Association. Archived August 12, 2007, at the Wayback Machine
  8. ^ Light-rail cracks: Who is at fault?. – Arizona Republic. – AZCentral.com.
  9. ^ "30 light-rail sections fixed at cost of $600K". – Arizona Republic. – AZCentral.com. – May 16, 2008.
  10. ^ "Light-rail construction: The end is near?". – Arizona Republic. – AZCentral.com. – April 29, 2008.
  11. ^ "Entertainment Solutions Inc". Solutionsaz.com. Retrieved October 17, 2013.
  12. ^ "Long waits greet riders along stops on light-rail lines". archive.azcentral.com.
  13. ^ "Phoenix Light Rail Grand Opening 12/27/08 08:00 AM". Valley Metro. December 27, 2008. Archived from the original on February 9, 2009. Retrieved December 25, 2008.
  14. ^ "Light Rail Station Design". Valley Metro. Archived from the original on December 17, 2007. Retrieved February 20, 2008.
  15. ^ "Rail Weekend Ridership Up 79 Percent" (Press release). Valley Metro. April 3, 2017. Retrieved June 19, 2017.
  16. ^ Jump up to: a b "Central Mesa Light Rail Extension" (PDF). Valley Metro. December 2014. Retrieved May 9, 2015.
  17. ^ "Design-Build Contractor Selected for Central Mesa Extension" (Press release). Valley Metro. March 22, 2012. Retrieved May 9, 2015.
  18. ^ Mitchell, Garrett (August 22, 2015). "Mesa light rail expansion debuts to thousands of riders". The Arizona Republic. Retrieved August 25, 2015.
  19. ^ Groff, Garin (February 16, 2012). "Downtown Mesa summit to tackle urban development along light rail – East Valley Tribune: Mesa". East Valley Tribune. Retrieved October 17, 2013.
  20. ^ "Valley Metro – RTP Brochure" (PDF). p. 9. Retrieved March 20, 2016.
  21. ^ Holstege, Sean (June 25, 2009). "Light-rail extension planned for 19th Ave. delayed until 2014". The Arizona Republic. Retrieved March 20, 2016.
  22. ^ Bui, Lynh (July 21, 2012). "Phoenix OKs plan to accelerate light-rail extension". The Arizona Republic. Retrieved March 20, 2016.
  23. ^ "Sundt Construction-Stacy and Witbeck Joint Venture Chosen To Extend Valley Metro Light Rail Line". April 5, 2013. Retrieved March 20, 2016.
  24. ^ "Sundt Partnership Breaks Ground on Phoenix Light Rail Project". January 15, 2013. Retrieved March 20, 2016.
  25. ^ "Community Celebrates Progress of the Northwest Light Rail Extension". Retrieved March 20, 2016.
  26. ^ "Northwest Extension Marks Arrival of Trains". Valley Metro. Retrieved March 20, 2016.
  27. ^ Goth, Brenna (December 10, 2015). "Northwest Phoenix light-rail extension to open in March". The Arizona Republic. Retrieved March 20, 2016.
  28. ^ Goth, Brenna (September 28, 2016). "New $23 million Phoenix light-rail station to serve riders with disabilities". AZCentral. Retrieved October 5, 2017.
  29. ^ "50th Street Station (Fact Sheet, Q2 2017)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
  30. ^ "Groundbreaking ceremony for light rail extension to Gilbert Road". City of Mesa. October 15, 2016. Retrieved October 5, 2017.
  31. ^ "Gilbert Road Extension (Fact Sheet, Q3 2017)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
  32. ^ "Celebrate with us on May 18! Two more miles of light rail open in Mesa. | Valley Metro". www.valleymetro.org. Retrieved May 20, 2019.
  33. ^ Jump up to: a b c Goth, Brenna (February 9, 2016). "South Phoenix light rail on fast track, to come a decade early". Arizona Republic. Retrieved February 15, 2016.
  34. ^ "Gilbert Road Light Rail Extension" (PDF). Valley Metro. April 2015. Retrieved June 5, 2015.
  35. ^ Estes, Christina; Goldstein, Steve; Gilger, Lauren (August 13, 2019). "Proposition 105: A Light Rail Fact Check For Phoenix Voters". KJZZ. Retrieved August 28, 2019. Christina Estes: Well, this started with some residents and business owners in south Phoenix who didn't want to see Central Avenue reduced from four lanes to two lanes to make room for light rail. It has since morphed into a full anti-light rail initiative. If voters approved Prop 105 it will stop the South Central extension as well as other future light rail projects.
  36. ^ Boehm, Jessica (February 6, 2019). "Phoenix voters will decide future of light rail in August". Arizona Republic. Retrieved August 28, 2019.
  37. ^ Goldstein, Steve; Brodie, Mark (August 28, 2019). "Phoenix Leaders React To Overwhelming Rejection Of Proposition 105, Proposition 106". KJZZ. Retrieved August 28, 2019.
  38. ^ "Construction Begins on South Central Extension Downtown Hub Light Rail Project". Mass Transit Mag. October 21, 2019. Retrieved October 21, 2019.
  39. ^ "South Central Extension/Downtown Hub". Valley Metro. Retrieved April 8, 2020.
  40. ^ http://www.valleymetro.org/images/uploads/Valley_Metro_System_Map_April_2016.pdf Archived May 8, 2016, at the Wayback Machine Valley Metro System Map (April 2016)
  41. ^ Jump up to: a b c d e "Valley Metro Rail" (PDF). Valley Metro. October 28, 2019. Retrieved April 8, 2020.
  42. ^ Jump up to: a b "Valley Metro Rail, Low Floor Light Rail Vehicle". Kinki Sharyo. Retrieved October 5, 2017.
  43. ^ "Valley Metro Rail Facts" (PDF). Valley Metro. August 19, 2021. p. 10.
  44. ^ "Valley Metro Rail Facts" (PDF). Valley Metro. p. 1.
  45. ^ Holle, Gina. "Phoenix Light Rail: On Track" (PDF). Community Transportation Association of America. Retrieved January 15, 2015.
  46. ^ "Valley Metro Rail – Technical Data" (PDF). Kinkisharyo International. Retrieved October 5, 2017.
  47. ^ Jump up to: a b c "Valley Metro contracts with Siemens, Brookville for new rail fleet". Progressive Railroading. Retrieved April 8, 2020.
  48. ^ Valley Metro (March 18, 2020). "Siemens rail car delivery". Retrieved November 16, 2020.
  49. ^ "Brookville Delivers First of Six Off-Wire Capable Streetcars to Valley Metro". Metro Magazine. March 15, 2021. Archived from the original on April 10, 2021. Retrieved July 5, 2021.
  50. ^ "Brookville catches $33M Tempe streetcar contract". Railway Age. June 19, 2017. Retrieved October 5, 2017.
  51. ^ Jump up to: a b West, Bryan (January 22, 2018). "Rails delivered to Tempe for 3-mile streetcar project". KPNX. Retrieved July 6, 2018.
  52. ^ "Siemens to build eleven light rail vehicles for Phoenix". Siemens AG. June 14, 2017. Retrieved October 5, 2017.
  53. ^ "Siemens rebadges North American low-floor cars". Tramways & Urban Transit (993). UK: Mainspring Enterprises Ltd. September 2020. p. 336. ISSN 1460-8324.
  54. ^ Clark, Douglas (October 6, 2020). "Valley Metro Regional Public Transportation Authority to expand light rail fleet in Phoenix, Arizona". Transportation Today. Retrieved October 7, 2020.
  55. ^ "Siemens to Build New Light Rail Vehicles for Phoenix Valley Metro Rail System". Mass Transit. June 19, 2017. Retrieved April 8, 2020.
  56. ^ "Proof of Payment – Valley Metro". Retrieved February 22, 2016.
  57. ^ "Valley Metro RMC Minutes (February 3, 2016)" (PDF). Valley Metro. pp. 198–199. Retrieved February 22, 2016.
  58. ^ "Tempe Streetcar" (PDF). Valley Metro. December 2014. Retrieved May 9, 2015.
  59. ^ "Valley Metro – Tempe Streetcar". Valley Metro. Retrieved March 20, 2016.
  60. ^ "South Bank – Mixed Use Urban Community Development – Tempe Town Lake, Tempe, AZ". Southbanktempe.com. Retrieved October 17, 2013.
  61. ^ "Downtown Tempe – Hayden Ferry Lakeside". Haydenferry.com. Archived from the original on October 17, 2013. Retrieved October 17, 2013.
  62. ^ "South Central (Fact Sheet, Q2 2017)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
  63. ^ "Light Rail Hub Coming to Downtown Phoenix". City of Phoenix. September 27, 2017. Retrieved October 5, 2017.
  64. ^ "South Central Light Rail Expansion Environmental Assessment" (PDF). Valley Metro. Federal Transit Administration. Retrieved July 30, 2020.
  65. ^ "South Central Extension Step Closer to Reality". Valley Metro. January 12, 2017. Retrieved October 5, 2017.
  66. ^ "Northwest Extension Phase II Fact Sheet" (PDF). Third Quarter 2020. Retrieved July 18, 2020.
  67. ^ "Valley Metro Rail Board Packet (September 2017)" (PDF). Valley Metro Rail. p. 85. Retrieved October 5, 2017.
  68. ^ "Northwest Phase II (Fact Sheet, Q2 2017)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
  69. ^ "Valley Metro awards Northwest Extension Phase II construction contract to Kiewit-McCarthy JV". Mass Transit Magazine. July 17, 2020. Retrieved July 18, 2020.
  70. ^ "Loop 202 South Mountain Freeway Project". Arizona DOT. Retrieved October 5, 2017.
  71. ^ "Capitol/I-10 West Fact Sheet" (PDF). Valley Metro. Retrieved September 25, 2020.
  72. ^ Goodman, Jessica (May 27, 2020). "City of Phoenix, Valley Metro want your input on Capitol and I-10 West Light Rail Extension". AZFamily. Retrieved September 23, 2020.
  73. ^ Giblin, Paul (February 11, 2016). "Valley Metro picks preferred light-rail route through west Phoenix into downtown Glendale". The Arizona Republic. Retrieved March 20, 2016.
  74. ^ Vandell, Perry (October 23, 2017). "Glendale City Council kills plans for downtown light rail". azcentral. Retrieved August 5, 2019.
  75. ^ "West Phoenix Transit Corridor Study | Valley Metro". www.valleymetro.org. Retrieved August 5, 2019.
  76. ^ "Northeast | Valley Metro". www.valleymetro.org. Retrieved August 5, 2019.
  77. ^ "Arizona Avenue Alternatives Analysis | Valley Metro". www.valleymetro.org. May 9, 2018. Retrieved August 5, 2019.
  78. ^ "Fiesta District Alternatives Analysis | Valley Metro". www.valleymetro.org. January 6, 2018. Retrieved August 5, 2019.
  79. ^ "Tempe/Mesa Streetcar Feasibility Study | Valley Metro". www.valleymetro.org. January 13, 2018. Retrieved August 5, 2019.
  80. ^ https://www.valleymetro.org/images/uploads/lightrail_publications/LRT2252_Future_Transit_Corridor_Brochure_Update_2013_print_file.pdf

External links[]

Route map:

KML is from Wikidata
Retrieved from ""