Orange Line (Namma Metro)

From Wikipedia, the free encyclopedia

Orange Line
Overview
StatusPlanned
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
TerminiJP Nagar IV Phase (JD Mall)
Kempapura
Stations22 (Corridor-I) + 11 (Corridor-II)
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)TBD
History
Planned opening2028 (2028)
Technical
Line length42 km (26 mi)
Number of tracks2
CharacterTBD
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail

The ORR-West Line (provisionally Orange Line) is a proposed line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3 of Namma Metro consists of two lines that are planned to be opened sometime in 2028-29.[1][2] Both lines will have a common depot at Sumanahalli where the new lines will intersect.

Stations[]

ORR-West Line (Orange Line)[]

The ORR-West Line is planned to have 22 stations.[1]

ORR-West Line (Orange Line)
# Station Name Connections
English Kannada
1 JP Nagara Phase 4 ಜೆ.ಪಿ. ನಗರ ೪ನೆ ಫೆಸ್ Subway interchange   Pink Line
2 JP Nagara Phase 5 ಜೆಪಿನಗರ ೫ನೇ ಹಂತ
3 JP Nagara ಜೆ.ಪಿ. ನಗರ Subway interchange   Green Line
4 Kadirenahalli Cross ಕದಿರೇನಹಳ್ಳಿ ಕ್ರಾಸ್
5 Kamakya bus Depot ಕಾಮಾಕ್ಯ ಬಸ್‌ ನಿಲ್ದಾಣ Bus interchange Kamakya Bus Station
6 Hosakerahalli Cross ಹೊಸಕೆರೆಹಳ್ಳಿ ಕ್ರಾಸ್
7 PES Institute of Technology ಪಿ.ಇ.ಎಸ್ ಕಾಲೇಜು
8 Mysuru Road ಮೈಸೂರು ರಸ್ತೆ Subway interchange   Purple Line
9 Nagarbhavi Circle ನಾಗರಬಾವಿ ವೃತ್ತ
10 Vinayaka Layout ವಿನಾಯಕ ಲೇಔಟ್‌
11 Ambedkar Institute of Engineering ಅಂಬೇಡ್ಕರ್‌ ಇನ್‌ಸ್ಟಿಟ್ಯೂಟ್‌ ಆಫ್‌ ಎಂಜಿನಿಯರಿಂಗ್‌
12 BDA Complex ಬಿ.ಡಿ.ಎ ಕಾಂಪ್ಲೆಕ್ಸ್‌
13 Sumanahalli Cross ಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್‌ Subway interchange Hoshalli-Kadabagere Line
14 Chowdeshwari Nagara ಚೌಡೇಶ್ವರಿನಗರ
15 Freedom Fighters Cross ಫ್ರೀಡಂ ಫೈಟರ್‌ಕ್ರಾಸ್‌
16 Kanteerava Studio ಕಂಠೀರವ ಸ್ಟೇಡಿಯಂ
17 Peenya ಪೀಣ್ಯ Subway interchange   Green Line
18 Bahubhali Nagara ಬಾಹುಬಲಿ ನಗರ
19 BEL Circle ಬಿ.ಇ.ಎಲ್‌ ವೃತ್ತ
20 Patelappa Layout ಪಟೇಲಪ್ಪ ಲೇಔಟ್‌
21 Hebbala ಹೆಬ್ಬಾಳ Mainline rail interchange Hebbal Suburban Railway
Bus interchange BMTC Bus Depot
22 Kempapura ಕೆಂಪಾಪುರ Subway interchange   Blue Line

Hosahalli-Kadabagere Line[]

This line is planned to have 9 stations.[1] The line color (or name) is yet to be announced.

Hosahalli-Kadabagere Line
# Station Name Connections
English Kannada
1 Hosahalli ಹೊಸಹಳ್ಳಿ Subway interchange   Purple Line
2 KHB Colony ಕೆ.ಎಚ್.ಬಿ ಕಾಲೊನಿ
3 Vinayaka Nagara ವಿನಾಯಕ ನಗರ
4 Sumanahalli Cross ಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್ Subway interchange   ORR-West Line
5 Sunkadakatte ಸುಂಕದಕಟ್ಟೆ
6 Herohalli ಹಿರೋಹಳ್ಳಿ
7 Byadarahalli ಬ್ಯಡರಹಳ್ಳಿ
8 Forest Gate ಫಾರೆಸ್ಟ್ ಗೇಟ್
9 Kadabagere ಕಡಬಗೆರೆ

See also[]

References[]

  1. ^ a b c "Bangalore Metro Phase 3 to cover 42 km, have 31 stations". New indian Express. 27 October 2021.
  2. ^ "42 KMs Bangalore Metro Phase-3 Project will start its operation by 2027-28". Metro Rail News. 27 October 2021.
Retrieved from ""