102 Street stop

From Wikipedia, the free encyclopedia
102 Street
Edmonton LRT stop
Coordinates53°32′35″N 113°29′41″W / 53.54306°N 113.49472°W / 53.54306; -113.49472Coordinates: 53°32′35″N 113°29′41″W / 53.54306°N 113.49472°W / 53.54306; -113.49472
Owned byCity of Edmonton
PlatformsSide-loading platforms
Tracks2
Construction
Structure typeSurface
Disabled accessYes
History
Opening2022
Future services
Preceding station Edmonton LRT Following station
Terminus Valley Line Churchill
toward Mill Woods

102 Street stop is a tram stop under construction in the Edmonton Light Rail Transit network in Edmonton, Alberta, Canada. It will serve the Valley Line and will be the terminus station until the line is extended west. It is located on the north side of 102 Avenue between 101 and 102 Streets, in Downtown Edmonton.[1] The stop is scheduled to open in 2022.[2]

Around the station[]

References[]

  1. ^ "Valley Line LRT Maps". City of Edmonton. Retrieved July 9, 2017.
  2. ^ "Valley Line LRT" (PDF). City of Edmonton. September 2016. Retrieved July 21, 2017.

External links[]

Retrieved from ""