Grey Nuns stop
Grey Nuns | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Edmonton LRT stop | |||||||||||
Coordinates | 53°27′46″N 113°26′4″W / 53.46278°N 113.43444°WCoordinates: 53°27′46″N 113°26′4″W / 53.46278°N 113.43444°W | ||||||||||
Owned by | City of Edmonton | ||||||||||
Platforms | Side-loading platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2022 | ||||||||||
Future services | |||||||||||
| |||||||||||
|
Grey Nuns stop is a tram stop under construction in the Edmonton Light Rail Transit network in Edmonton, Alberta, Canada. It will serve the Valley Line, and is located on the east side of 66 Street, north of 31 Avenue NW, between Kameyosek and Tawa.[1] The stop is scheduled to open in 2022.[2]
Around the station[]
References[]
- ^ "Valley Line LRT Maps". City of Edmonton. Retrieved July 9, 2017.
- ^ "Valley Line LRT" (PDF). City of Edmonton. September 2016. Retrieved July 21, 2017.
External links[]
Categories:
- Edmonton Light Rail Transit stations
- Railway stations under construction in Canada
- Railway stations scheduled to open in 2022
- Valley Line (Edmonton)