Mill Woods stop
Mill Woods | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Edmonton LRT stop | |||||||||||
Coordinates | 53°27′30″N 113°25′50″W / 53.45833°N 113.43056°WCoordinates: 53°27′30″N 113°25′50″W / 53.45833°N 113.43056°W | ||||||||||
Owned by | City of Edmonton | ||||||||||
Platforms | Centre | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2022 | ||||||||||
Future services | |||||||||||
| |||||||||||
|
Mill Woods stop is a tram stop under construction in the Edmonton Light Rail Transit network in Edmonton, Alberta, Canada. It will serve as the south terminus of the Valley Line. It is located on the south side of 28 Avenue NW, west of Hewes Way, between Tawa and Mill Woods Town Centre.[1] The stop is scheduled to open in 2022, with the Mill Woods Transit Centre relocated to allow easy connections between bus and train.[2]
Around the station[]
Mill Woods Transit Centre[]
Mill Woods Transit Centre | |
---|---|
Platforms | 17 bus bays[3] |
Construction | |
Parking | No |
Bicycle facilities | Yes |
Disabled access | Yes |
Other information | |
Website | Mill Woods Transit Centre |
The Mill Woods Transit Centre is located on Hewes Way and 25 Avenue.
As a part of the Mill Woods Town Centre redevelopment plan, the transit centre was moved from its original location to a new location approximately 100 metres (330 ft) from the new LRT station site.[4] Instead of a concrete island, typical of transit centres in Edmonton, the transit centre was planned to include a promenade with shops next to the bus stops.[5] Construction of the new transit centre began in fall 2019, and it opened April 15, 2021.[6][7]
The following bus routes serve the transit centre:[8]
To/From | Routes |
---|---|
Bonnie Doon | 510X |
Century Park Transit Centre | 56, 518, 519, 521 |
Charlesworth | 518 |
Clareview Transit Centre | 53 |
Coliseum Transit Centre | 53 |
Downtown | 510X, 523 |
East Knottwood | 513 |
Ellerslie Crossing | 518 |
Kenilworth Industrial | 53 |
Knottwood | 509, 513 |
Lakewood Transit Centre | 509, 512, 513 |
Laurel | 516 |
Leger Transit Centre | 56 |
Meadows Transit Centre | 515, 516 |
Millgate Transit Centre | 510X |
The Orchards | 521 |
Roper Industrial | 53 |
Silver Berry | 515 |
South Edmonton Common | 512 |
Southwood | 509, 517 |
Strathcona / Whyte Ave | 523 |
Summerside | 519 |
Walker | 519, 521 |
West Edmonton Mall Transit Centre | 56 |
West Knottwood | 513 |
References[]
- ^ "Valley Line LRT Maps". City of Edmonton. Retrieved July 9, 2017.
- ^ "Valley Line LRT" (PDF). City of Edmonton. September 2016. Retrieved July 21, 2017.
- ^ "Mill Woods Transit Centre Map" (PDF). City of Edmonton. Retrieved 1 July 2018.
- ^ Stolte, Elise (16 March 2017). "Mill Woods redevelopment to include first European-style bus terminal". Edmonton Journal. Retrieved 18 March 2018.
- ^ Stolte, Elise (5 December 2018). "Elise Stolte: Edmonton's transit stations are dead, empty, soulless places. An extra security guard won't change that". Edmonton Journal. Retrieved 7 December 2018.
- ^ "Report for Bylaw 18108 - Amendment to the Mill Woods Station Area Redevelopment Plan". City of Edmonton. 10 July 2017. Retrieved 18 March 2018.
- ^ Herring, Jason (20 August 2019). "City gives sneak peek of Mill Woods Transit Centre as construction nears". Edmonton Journal. Retrieved 9 November 2019.
- ^ "Brochures in PDF". City of Edmonton. Retrieved 7 November 2019.
External links[]
Wikimedia Commons has media related to Mill Woods station. |
- Edmonton Light Rail Transit stations
- Railway stations under construction in Canada
- Edmonton Transit Service transit centres
- Railway stations scheduled to open in 2022
- Valley Line (Edmonton)