Batang–Semarang Toll Road

From Wikipedia, the free encyclopedia
Rambu petunjuk 4a.svg
Batang-Semarang Toll Road
Trans-Java Toll road en.svg
Route information
Part of AH2
Maintained by PT Jasamarga Semarang Batang
(PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya))
Length75 km (47 mi)
Major junctions
FromBatang
Major intersectionsPemalang-Batang Toll Road
Semarang Toll Road
ToSemarang
Location
Major citiesPekalongan, Semarang, Kendal
Highway system

Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]

Sections[]

Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:

  • Section I, beginning of project - East Batang (3.2 km)
  • Section II, East Batang - Weleri (36.35 km)
  • Section III, Weleri - Kendal (11.05 km)
  • Section IV, Kendal - Kaliwungu (13.5 km)
  • Section V, Kaliwungu - Krapyak (10.9 km)

References[]

  1. ^ Inilah Pemenang Lelang Jalan Tol Batang-Semarang
  2. ^ "Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018". Retrieved 23 December 2017.
  3. ^ "Jalan Tol Batang - Semarang Selesai Akhir 2018". Archived from the original on 17 April 2018. Retrieved 23 December 2017.
  4. ^ "Batang and Balikpapan toll road projects accelerated". Archived from the original on 23 December 2017. Retrieved 23 December 2017.
Retrieved from ""