Bowesville station
Coordinates | 45°17′33.8″N 75°37′56.7″W / 45.292722°N 75.632417°WCoordinates: 45°17′33.8″N 75°37′56.7″W / 45.292722°N 75.632417°W | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Owned by | OC Transpo | ||||||||||
Platforms | Side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Parking | 800 spaces | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2023 | ||||||||||
Future services | |||||||||||
|
Bowesville is an under construction station on the Trillium Line in Ottawa, Ontario. It is being constructed as part of the Stage 2 O-Train expansion and is scheduled for completion in 2023. The station will consist of two side platforms and is located southeast of the intersection of Bowesville and Earl Armstrong roads.[1]
References[]
- ^ "Trillium Line South Extension". ottawa.ca. November 19, 2019. Retrieved May 2, 2020.
Categories:
- Trillium Line stations
- Railway stations scheduled to open in 2023