Limebank station
Coordinates | 45°16′35″N 75°40′06″W / 45.27639°N 75.66833°WCoordinates: 45°16′35″N 75°40′06″W / 45.27639°N 75.66833°W | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Owned by | OC Transpo | ||||||||||
Platforms | Side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2023 | ||||||||||
Future services | |||||||||||
|
Limebank is an under construction terminal station on the Trillium Line in Ottawa, Ontario. When constructed, it will be the southern terminus of the Stage 2 O-Train expansion and is scheduled for completion in 2023. The station will be elevated with two side platforms and is located west of Limebank Road, south of Earl Armstrong Road and east of Main Street.[1][2]
References[]
- ^ Porter, Kate (December 3, 2019). "Stage 2 LRT work means chopping trees, moving roads". CBC News. Retrieved May 5, 2020.
The latest design for Limebank Station in Riverside South will see the train run above the road
- ^ "Trillium Line South Extension". ottawa.ca. November 19, 2019. Retrieved May 2, 2020.
Categories:
- Trillium Line stations
- Railway stations scheduled to open in 2023