G3013 Turpan–Erkeshtam Expressway

From Wikipedia, the free encyclopedia
  (Redirected from )
alt=Turpan–Erkeshtam Expressway shield
Turpan–Erkeshtam Expressway
قەشقەر-ئەرکەشتام چىڭسىخوزا-غۇلجا
Tuyi Expressway
吐伊高速公路
The Erkeshtam border checkpoint
The Turpan–Erkeshtam Expressway connects the city of Turpan with the Erkeshtam border checkpoint, pictured above.
Route information
Auxiliary route of G30
Part of AH61 AH65
Length213.9 km[1] (132.9 mi)
ExistedOctober 2013–present
Major junctions
East end G30 Xiaocaohu JCT in Toksun, Turpan
West end Kyrgyzstan, E60 in Irkeshtam
Highway system
G3012 G3014

The Turpan–Erkeshtam Expressway (Chinese: 吐鲁番—伊尔克什坦高速公路, Uighur: قەشقەر-ئەركەشتام يۇقىرى سۈرئەتلىك تاشيولى), commonly referred to as the Tuyi Expressway (Chinese: 吐伊高速公路) and designated G3013, is a 213.9-kilometre-long roadway (132.9 mi) in the Chinese autonomous region of Xinjiang.[1] It connects the Toksun County of Turpan, Hoxud, Yanqi counties and Korla city of Bayingolin, Tiemenguan, Luntai County of Bayingolin, Kuqa, Xinhe, Onsu counties, Aksu City and Kalpin County of Aksu, Maralbexi, Payzawat counties of Kashgar Prefecture, Artux city and Ulugqat County of Kizilsu. It's a spur route of G30.

Route[]

The former Kashgar–Erkeshtam Expressway (喀伊高速公路) begins in the east at the Takuti Bridge of the G3012 Turpan–Hotan Expressway, in the county-level city of Artux.[2] It traverses westward through Ulugqat County, through the village of Ulugqat (also known as Wuqia), which serves as the Chinese immigration checkpoint,[3] before terminating at the border with Kyrgyzstan at Erkeshtam.

The highway is not built to expressway standards for its entire length. Its length is 213.9 km (132.9 mi), but only 77.4 km (48.1 mi) of that is expressway-grade and the rest is second-grade highway, consisting of 19.5 km (12.1 mi) of newly built roadway and 117 km (73 mi) of upgraded roadway.[1]

Under the modification of national standard GB/T 917-2017, the Kashgar-Erkeshtam Expressway has renamed to Turpan–Erkeshtam Expressway, but the route number G3013 is retained.

See also[]

References[]

  1. ^ a b c Kayi Highway will soon be opened to traffic. 23 September 2013. Retrieved 31 December 2013. (in Chinese)
  2. ^ Construction of Kayi Expressway is projected to be completed by October 2013 (喀伊高速公路项目预计将在2013年10月竣工) 30 March 2013. Retrieved 31 December 2013. (in Chinese)
  3. ^ Irkeshtam Pass. Retrieved 31 December 2013.
Retrieved from ""