Highfield station
Highfield | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
CTrain station | |||||||||||
Coordinates | 51°01′12″N 114°01′57″W / 51.019890°N 114.032604°WCoordinates: 51°01′12″N 114°01′57″W / 51.019890°N 114.032604°W | ||||||||||
Owned by | Calgary Transit | ||||||||||
Platforms | Island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Parking | None | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Fare zone | Fare paid | ||||||||||
History | |||||||||||
Opening | 2027 | ||||||||||
Electrified | Overhead catenary | ||||||||||
Services | |||||||||||
|
Highfield is a planned and approved CTrain light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one.[1] The station is located in Calgary's oldest industrial area.
The station will be at-grade, parallel to the existing freight railway tracks, and will have a bus loop. The station is expected to stimulate growth of the industrial park, because of increased transit connections for workers. The area has been identified by the City of Calgary to potentially become a generator for new commercial and high tech incubator development.[2]
References[]
- ^ Communications, Customer Service &. "Green Line - Segment 1:: Green Line Stage One". Engage. Retrieved 2020-07-21.
{{cite web}}
: CS1 maint: url-status (link) - ^ Transportation. "Highfield Green Line Station". www.calgary.ca. Retrieved 2020-07-23.
Categories:
- CTrain stations
- Railway stations scheduled to open in 2027
- Canadian railway station stubs
- Alberta building and structure stubs
- Alberta transport stubs