Shepard station

From Wikipedia, the free encyclopedia
Shepard
CTrain station
Coordinates50°56′10″N 113°57′59″W / 50.936026°N 113.966285°W / 50.936026; -113.966285 (Shepard)Coordinates: 50°56′10″N 113°57′59″W / 50.936026°N 113.966285°W / 50.936026; -113.966285 (Shepard)
Owned byCalgary Transit
PlatformsSide platforms
Tracks2
Connections302 Southeast BRT / Seton
Construction
Structure typeAt grade
Parking600
Disabled accessYes
History
Opening2027 (2027)
ElectrifiedOverhead catenary
Services
Preceding station CTrain Following station
Douglas Glen Green Line Terminus

Shepard is a planned and approved CTrain suburban light rail station in Calgary, Alberta, Canada part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one. The station is located at the South Trail Crossing shopping centre and will serve as the southern terminus station for stage one of construction. It is expected to be one of the busiest stations on opening day.[1]

This station is surrounded by a commercial and retail area and does not currently have a pedestrian-friendly environment. As part of station construction, the area will be upgraded with improved sidewalks and multi-use pathways that will increase walkability in the area. The improved pathway system will feature a pedestrian connection to Douglasdale/Douglasglen. The Green Line light-rail storage and maintenance facility will be immediately north of the station. Additionally, it will feature a large park and ride, and a one-million square foot office development has been planned adjacent to the station.[2]

References[]

  1. ^ "Green Line - Segment 1: Green Line Stage One". Engage. Retrieved 2020-07-21.{{cite web}}: CS1 maint: url-status (link)
  2. ^ Transportation. "Shepard Green Line Station". www.calgary.ca. Retrieved 2020-07-23.
Retrieved from ""