Line 19 (São Paulo Metro)

From Wikipedia, the free encyclopedia
São Paulo Metro Line 19 (Sky Blue)
São Paulo Metro logo
Overview
StatusProposed
OwnerBandeira do estado de São Paulo.svg Government of the State of São Paulo
LocaleSão Paulo, Brazil
Guarulhos, Brazil
TerminiAnhangabaú (First phase)
Bosque Maia
Connecting lines
Stations15 (First phase)
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s)Metrô-SP icon.svg Companhia do Metropolitano de São Paulo
Depot(s)Vila Medeiros railyard[1]
Rolling stock31 6-car trains[1]
Daily ridership500,000 (projected, first phase)[2]
Ridership621,000/business day (projected, first phase)[1]
History
Planned opening2028 (estimated)[3]
Technical
Line length17.6 km (10.9 mi) (First phase)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
SignallingCBTC
Route map

Legend
ViaMobilidade SP (cropped).png L17 C.png
ViaMobilidade SP (cropped).png Spmetro 5.svg
Campo Belo
Spmetro 5.svg L17 C.png
Jesuíno Maciel
Alvorada
Hélio Peregrino
 20 
Itaim Bibi
Parque Ibirapuera
Jardim Paulista
 16 
Brigadeiro
Spmetro 2.svg
Bela Vista
L06 C.png
Up arrow
Second phase
Down arrow
First phase
Bixiga train park
Anhangabaú
Spmetro 3.svg
São Bento
Spmetro 1.svg
Cptmsymbol.svg Cptm 7.svg
Cptmsymbol.svg Cptm 11.svg
Pari
Cptmsymbol.svg Cptm 11.svg
Silva Teles
Catumbi train park
Catumbi
Vila Maria
Curuçá
Jardim Japão
Jardim Brasil
Jardim Julieta
Vila Medeiros rail yard
Itapegica
Dutra
Spmetro 2.svg
Vila Augusta
Guarulhos
Bosque Maia train park
Bosque Maia

Line 19 (Sky Blue) (Portuguese: Linha 19–Celeste) is a planned line of the São Paulo Metro.[4][5][6]

At 17.6 kilometres (10.9 mi) in length at its first phase, the line will be the first subway line to serve the municipality of Guarulhos, with Line 13-Jade of the commuter rail system already serving the city since 2018. Construction is expected to begin in 2021.[2]

Background[]

Guarulhos is the second-largest city in the state of São Paulo, yet was not served by rail transport until the opening of the CPTM commuter rail's Line 13-Jade in 2018. Thus, planning for Line 19 began to link Guarulhos to the São Paulo Metro, along with Vila Medeiros and Vila Maria.[2] It will be underground for its entire length.

Planning[]

São Paulo Metro originally planned to begin tendering for the construction of Line 19 in April 2020, but this was delayed to May.[7]

Stations[]

Code Station Integration City Platform[8] Status
TBA Bosque Maia Guarulhos Side platforms Planning (first phase)
Guarulhos
Vila Augusta
Dutra Metrô-SP icon.svg Spmetro 2.svg
Itapegica
Jardim Julieta São Paulo
Jardim Brasil
Jardim Japão
Curuçá
Vila Maria
Catumbi
Silva Teles
Pari Cptmsymbol.svg Cptm 11.svg
São Bento Metrô-SP icon.svg Spmetro 1.svg
Anhangabaú Metrô-SP icon.svg Spmetro 3.svg
Bela Vista Linha 6 - Linha Universidade.png L06 C.png Planning (second phase)
Brigadeiro Metrô-SP icon.svg Spmetro 2.svg
Jardim Paulista Metrô-SP icon.svg  16 
Parque Ibirapuera
Itaim Bibi
Hélio Peregrino Metrô-SP icon.svg  20 
Alvorada
Jesuíno Maciel
Campo Belo ViaMobilidade SP (cropped).png Spmetro 5.svg L17 C.png


References[]

  1. ^ a b c Meier, Ricardo (14 April 2021). "Cinco consórcios participam da licitação de projeto básico da Linha 19-Celeste do Metrô". Metrô CPTM (in Portuguese). Retrieved 14 April 2021.
  2. ^ a b c "São Paulo Metro begins studies to build Line 19". 6 August 2019. Retrieved 6 August 2019.
  3. ^ Meier, Ricardo (12 February 2021). "Governo Doria prevê entregar Linha 19-Celeste em duas etapas entre 2028 e 2029". Metrô CPTM (in Portuguese). Retrieved 14 February 2021.
  4. ^ "PDUI-STM-RedeAltaMediaCapacidade-11-05-2016.pdf" (PDF). Retrieved 16 January 2019.
  5. ^ http://www.domboscoitaquera.org.br/downloads/secretaria_estadual_de_transportes.pdf Seminário sobre infraestrutura e sistema viário para a copa 2014 e o desenvolvimento da zona leste, Jurandir Fernandes, Secretário dos Transportes Metropolitanos, 25/08/2011
  6. ^ "Metrô contrata estudos para três linhas an zona norte de SP".
  7. ^ "Contractual wrangles delay São Paulo metro schemes". Railway Gazette International. 1 April 2020. Retrieved 20 June 2020.
  8. ^ "Licitação do projeto básico da Linha 19-Celeste do Metrô é anulada pelo TCE". Metrô CPTM (in Brazilian Portuguese). 2020-09-10. Retrieved 2020-09-11.
Retrieved from ""