Line 1 (Nanchang Metro)

From Wikipedia, the free encyclopedia
Line 1
 1 
Nanchang Metro Line 1 Train.jpg
Overview
Native name南昌地铁1号线
StatusOperational
LocaleNanchang, Jiangxi, China
Termini
Stations24 (Phase 1)
Service
TypeRail Transit
SystemNanchang Metro
Depot(s)Jiaoqiao Train Shed
Yaohu MPD[1][2]
Rolling stock6-car Type B
History
Opened26 December 2015; 5 years ago (2015-12-26)
Technical
Line length28.737 km (17.856 mi)
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary,DC 1500 V
Operating speed80 km/h (50 mph)
Route map
Legend
Connection to Line 2
 2 
 3 
 2 
Beijing–Kowloon Railway
  
  

Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and (Chinese: 麻丘) to the east.

Introduction[]

Nanchang Metro Line 1 shapes like the letter 'L', its Phase 1 is 28.737 km in length and includes 24 stations.[3][4] The average distance between stations is 1,251 m.[5] The construction has begun in 2009 and was finished by 2015.[6]

Opening timeline[]

Segment Commencement Length Station(s) Name
Shuanggang — Yaohu Lake West 26 December 2015 28.737 km (17.86 mi) 24 Phase 1

Route and stations[]

The Phase 1 of Metro Line 1 is 28.737 km in length and includes 24 stations; further extension has been planned in Phase II.

Map of Nanchang Metro Line 1.svg
station name Connections Distance
km
Location
English Chinese
双港 0.00 0.00 Qingshanhu
孔目湖 1.20 1.20
长江路 3.07 4.27
珠江路 1.18 5.45
庐山南大道 1.48 6.93
绿茵路 0.77 7.70
卫东 1.18 8.88
地铁大厦  2  1.00 9.88 Qingshanhu/Donghu/Xinjian
秋水广场 0.82 10.70 Donghu
滕王阁 1.95 12.65 Donghu/Xihu
万寿宫 0.98 13.63
八一馆  3  0.56 14.19
八一广场  2  1.12 15.31
丁公路北 1.00 16.31
师大南路 1.04 17.35
彭家桥    0.85 18.20 Qingshanhu
谢家村 0.82 19.02
青山湖大道 0.75 19.77
高新大道    1.13 20.90
艾溪湖西 1.33 22.23
艾溪湖东 1.88 24.11 Nanchang Co.
太子殿 1.73 25.84
奥体中心 1.30 27.14
瑶湖西 1.33 28.47

Rolling stock[]

The line is operated with Type B rolling stock at a maximum speed of 80 km/h. 27 trains of 6-car set, 162 cars in total will be operated at the first stage.[7] These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction, and minimum service interval of 2 minutes.[8]

Future development[]

In the initial plan of 2008, Line 1 spanned from (Chinese: 瑶湖) in the east to Lehua (Chinese: 乐化) in the northwest, and is 35 km in length in the long-term plan,[9] which was confirmed in June 2013 again.[10]

  • East extension: Phase 2 extends Line 1 from on the west bank of Yao Lake to Maqiu on the east bank. This extension is planned to be 4 km in length, underground, and have 2 stations.
  • North extension: Phase 2 extends Line 1 to Changbei Airport via Lehua.

References[]

  1. ^ 南昌地铁1号线停车场设在蛟桥镇 建设项目面向全国招标
  2. ^ http://ww3.sinaimg.cn/large/9f5bd91dgw1drtbou74ecj.jpg
  3. ^ 南昌地铁一号线起点站双港大道站 邻近华东交大 Archived 2013-04-25 at archive.today
  4. ^ 南昌地铁1号线两标段招标
  5. ^ 南昌市轨道交通1号线一期工程系统设计06、08、09、11合同段资格预审招标公告 Archived 2015-04-18 at the Wayback Machine
  6. ^ 南昌地铁1号线推迟至2015年底通车 明确11个建设节点
  7. ^ 南昌地铁1号线24个车站确定 将拆除中山桥
  8. ^ 南昌地铁拟采用B型车 单向每小时载乘客5.5万人次
  9. ^ "南昌地铁远景规划征询民意(图)". Archived from the original on 2017-08-31. Retrieved 2013-08-11.
  10. ^ 南昌地铁三四号线拟建19.7公里高架 1号线北延至昌北机场
Retrieved from ""