Line S1 (Taizhou Rail Transit)
Line S1 | |
---|---|
S1 | |
Overview | |
Locale | Taizhou, Zhejiang, China |
Termini | |
Stations | 15 |
Service | |
Type | Rapid transit |
System | Taizhou Rail Transit |
Operator(s) | Taizhou MTR corporation |
History | |
Opened | June 2022 |
Technical | |
Line length | 41.8 km (25.97 mi) |
Number of tracks | 2 |
Character | Underground and Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines, AC 25 kV 50 Hz |
Operating speed | 160 km/h (maximum speed) |
Line S1 of the Taizhou Rail Transit is a suburban rapid transit line currently under construction in Taizhou that will be running from Taizhou Railway Station to Chengnan. It is expected to open in June 2022. The full line will be 41.8 kilometres long.
Stations[]
Station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
杭台高铁台州站 | ||||||
开发大道站 | ||||||
银泰城站 | ||||||
洪家站 | ||||||
商海北街站 | ||||||
腾达路站 | ||||||
客运南站 | ||||||
泽国站 | ||||||
温岭火车站站 | ||||||
横峰站 | ||||||
中心大道站 | ||||||
城西站 | ||||||
万昌路站 | ||||||
温岭体育场路站 | ||||||
城南站 | ||||||
References[]
Categories:
- Taizhou Rail Transit
- People's Republic of China rapid transit stubs