Line S1 (Wenzhou Rail Transit)

From Wikipedia, the free encyclopedia
Line S1
 S1 
WZMTR S1 Train with CRH380B.jpg
Overview
LocaleWenzhou, Zhejiang, China
Termini
Stations18
Service
TypeRapid transit
SystemWenzhou Rail Transit
Operator(s)Wenzhou MTR corporation
Rolling stock4-car Type D[1]
History
Opened23 January 2019; 3 years ago (2019-01-23)
Technical
Line length53.5 km (33.24 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, AC 25 kV 50 Hz
Operating speed120 km/h (maximum speed)
Line S1
Simplified Chinese温州轨道交通S1线
Traditional Chinese溫州軌道交通S1線

Line S1 of the Wenzhou Rail Transit (Chinese: 温州轨道交通S1线; pinyin: Wēnzhōu Guǐdào Jiāotōng S-Yī Xiàn)[2] is a suburban rapid transit line in Wenzhou running from to . The west section (Tongling - Olympic Center) has 12 stations[a] and is 34.38 km. The west section was opened on January 23, 2019.[2] The east section of the line (19.127 km[3] with 6 stations) was opened on September 28, 2019.

The full line is 53.5 kilometres (33.2 mi) long.[4]

Opening timeline[]

Segment Commencement Length Station(s) Name
Tongling — Olympic Center 23 January 2019 34.38 km (21.36 mi)[2] 12 Western section of Phase 1
Olympic Center — Shuang'ou Avenue 28 September 2019 19.127 km (11.9 mi)[3] 6 Eastern section of Phase 1

Stations[]

station name Transfer Distance
km
Location
English Chinese
桐岭 Ouhai
潘桥
South Railway Station 动车南 VRH  M3  (planned)
(reserved station) 秀屿  M3  (planned)
新桥
德政 Lucheng
龙霞路 Ouhai
(reserved station) 温州火车站 Wenzhou railway station    (planned)    (planned) Lucheng
惠民路
三垟湿地 Ouhai
(reserved station) 文昌 Ouhai / Lucheng
龙腾路 Longwan
科技城    (planned)
瑶溪
奥体中心
永中
机场 Wenzhou Longwan International Airport WNZ  S2  (under construction)
灵昆  S2  (under construction) Dongtou
瓯江口
瓯华
双瓯大道

Notes[]

  1. ^ Excluding 3 reserved stations: Xiuyu, Wenzhou Railway Station, and Wenchang.

References[]

  1. ^ "温州市域铁路建设与城市发展同呼吸 轨道交通"城"长记". 2020-12-30.
  2. ^ a b c "刚刚!温州首条轨道交通S1线正式开通试运营". 2019-01-23.
  3. ^ a b "S1线东段通过项目工程质量验收,计划月底通车". 2019-09-01.
  4. ^ "温州首条轨道交通S1线正式开通试运营". 2019-01-24.
Retrieved from ""