Llandudno Junction railway station

From Wikipedia, the free encyclopedia

Llandudno Junction

Welsh: Cyffordd Llandudno
National Rail
Llandudno Junction railway station March 2018 03.jpg
Llandudno Junction railway station (March 2018)
LocationLlandudno Junction, Conwy County Borough
Wales
Coordinates53°17′02″N 3°48′32″W / 53.284°N 3.809°W / 53.284; -3.809Coordinates: 53°17′02″N 3°48′32″W / 53.284°N 3.809°W / 53.284; -3.809
Grid referenceSH794778
Managed byTransport for Wales Rail Limited
Platforms4
Other information
Station codeLLJ
ClassificationDfT category C2
History
Original companyChester and Holyhead Railway
Pre-groupingLondon and North Western Railway
Post-groupingLondon Midland and Scottish Railway
Key dates
1 October 1858 (1858-10-01)First station opened
16 June 1863Conwy Valley Line opened
1 October 1897Present station opened
Passengers
2016/17Decrease 0.320 million
 Interchange Decrease 72,643
2017/18Decrease 0.317 million
 Interchange Increase 95,023
2018/19Increase 0.322 million
 Interchange Decrease 83,058
2019/20Decrease 0.301 million
 Interchange  Increase 117,672
2020/21Decrease 75,342
 Interchange Decrease 20,962
Notes
Passenger statistics from the Office of Rail and Road

Llandudno Junction railway station (Welsh: Cyffordd Llandudno) is a station serving the village of Llandudno Junction on the Crewe to Holyhead North Wales Coast Line. The station is managed by Transport for Wales Rail Limited, although Avanti West Coast also serves it.

It is a junction for trains to Llandudno and the Conwy Valley Line, and is one of the busiest stations in North Wales, surpassed only in passenger numbers by Bangor.

History[]

The original station (located to the west of the current station) was opened on 1 October 1858[1] and served the branch line to Llandudno. Built by the St. George's Harbour and Railway Company in 1858, this branch line heads north through Deganwy before terminating in the village. Before the completion of the junction station, the branch line trains from Llandudno ran through to Conwy.

This was followed by the opening of a second branch line in 1863 – the Conwy Valley Line – which headed south and was built by the Conway and Llanrwst Railway, and became part of the LNWR in 1867. It follows the valley of the River Conwy to Llanrwst (where it originally terminated) and Betws-y-Coed (a later terminus in 1869), then follows the Lledr Valley and a two mile long tunnel to terminate at Blaenau Ffestiniog, where passengers can join the Ffestiniog Railway.

Initially the Conwy Valley line ran into a separate platform on the south side of the station, and a refreshment room was built in 1864. But more space was needed to cope with both main line and branch-line traffic, and on 1 October 1897 the present station was opened[1] on a much larger site, the two island platforms offering six through lines with two bays at each end (a total of four through platforms and four bay platforms). The opening of the new station allowed the demolition of the former station, but also entailed a diverting of the Conwy Valley branch, which now joined the main line some half a mile further east. The old formation was used to store locomotives.

Three of the platforms on the southern side (both bays and the down loop) were taken out of use in 1968 when the easternmost of the two signal boxes was closed and the track layout altered. In 1983 the branch junction was again moved slightly eastwards to allow a new freight terminal (now disused) to be built to replace the original goods yard and another at nearby Colwyn Bay that had been closed before the start of the A55 road widening scheme the previous year.

The 1985-built Llandudno Junction signal box

The station was also remodelled once more and resignalled at this time, and in 1985 a new power signal box was commissioned at the western end,[2] which now controls the station area and junctions along with the main line between Colwyn Bay and Conwy and the northern end of the Conwy Valley branch (using the electric token system). The token machine for the branch is located at the station rather than in the signal box for operational convenience, allowing drivers to collect or return their token (with the cooperation of the signaller) whilst station work is undertaken, rather than having to make an additional stop at the box to make the exchange.

The station was also formerly the site of a motive power depot (which closed in 1966). It was given the code 7A by the London, Midland and Scottish Railway, which was altered to 6G by British Railways in March 1952.[3] This had been located just south east of the station, and its site, together with the former adjoining goods yard, now have been redeveloped, but the new flyover road across the site bears the name 6G.

Layout[]

Llandudno Junction and branches
Legend
North Wales Coast Line
to Chester
Conwy Valley line
to Blaenau Ffestiniog
Llandudno Junction
Branch
to Deganwy and Llandudno
North Wales Coast Line
to Holyhead
Station entrance and car park

The station currently has four operational platforms:

  • Platform 1 is used by eastbound trains to Chester, Crewe, Birmingham New Street, Cardiff Central, London Euston and Blaenau Ffestiniog. It is also signalled for use by trains to Llandudno.
  • Platform 2 is a bay platform used by the hourly shuttle service to Llandudno. It is also used for stabling trains overnight.
  • Platform 3 is a bidirectional platform which can be used by all services. It is mainly used for westbound trains, but at busy periods can be used for eastbound trains as well.
  • Platform 4 is used by services to Bangor, Holyhead and Llandudno. It is also signalled for trains to Blaenau Ffestiniog (the first branch train of the day often leaves from here).

A bus shelter in the station car park is numbered as platform 5, and is used for local bus services as well as rail replacement services when the railway is closed for engineering work.

Facilities[]

The station is staffed throughout the day, with the ticket office on platforms 1 and 3. Self-service ticket machines are also available and for collecting pre-paid/advance purchase tickets. Other facilities on offer (all on platforms 1–3) include a waiting room, toilets, a cafe and public telephone. Platform 4 has a canopy and customer help point only. Train running information is provided by poster boards, digital information screens and automated announcements. Step-free access is available from the station entrance to all platforms via lifts integrated into the main footbridge that links them.[4]

Services[]

A Virgin Trains Class 221 Super Voyager at platform 3, bound for Holyhead.
A Class 175 on a North Wales Coast Line service passes A Class 150 operating a Conwy Valley Line service, both headed to Llandudno.
  • Transport for Wales Rail Limited provides an hourly service from either Birmingham International or Cardiff Central to Holyhead via Wrexham General, Shrewsbury, Chester and Bangor.[5] Some morning and late evening trains run to/from Crewe.
  • Transport for Wales Rail provide an hourly service from Manchester Piccadilly to Llandudno. Since the May 2016 timetable change, several of these now run through to/from Manchester Airport. A few shuttle services between here and Llandudno also operate at certain times of day.
  • Transport for Wales Rail operate six trains per day each way on the Conwy Valley Line to Blaenau Ffestiniog.[6]
  • Transport for Wales Rail operate one daily limited-stop Premier Service between Holyhead and Cardiff Central.
  • Avanti West Coast operate two services each way per day from London Euston to Holyhead (One on Saturdays). They also operate five trains each way per day on weekdays between Crewe and Holyhead, with three services on Saturdays.[7] There is also one train on Saturdays from Holyhead to Birmingham New Street (one way only).[8]

On Sundays services run hourly to Holyhead and Crewe (limited service to Cardiff Central and Birmingham International) on the main line, along with a half-hourly shuttle to Llandudno. There are two trains each way to Crewe and one train each way to London. There are also four trains each way on the Blaenau Ffestiniog branch (these run all year since the winter 2019 timetable change).

During the 2020-21 COVID-19 pandemic, a reduced timetable has been in operation on the Coast line, with some services suspended and others reduced in frequency.

Preceding station   National Rail National Rail   Following station
Transport for Wales
Conwy Valley Line
Colwyn Bay
Transport for Wales
Bangor
Colwyn Bay
Transport for Wales
North Wales Coast Line
Avanti West Coast
London Euston-Holyhead
Bangor

References[]

  1. ^ a b Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 145. ISBN 1-85260-508-1. R508.
  2. ^ Signalling Around The Junction www.6g.nwrail.org.uk; Retrieved 2010-06-09
  3. ^ Walford, John (2012). A Detailed History of British Railways Standard Steam Locomotives - Volume Five: The End of an Era. Maidenhead: RCTS. p. 17. ISBN 978-0901115-973.
  4. ^ Llandudno Junction station facilities National Rail Enquiries; Retrieved 13 January 2017
  5. ^ GB eNRT December 2019 Edition, Table 81 (Network Rail)
  6. ^ GB eNRT December 2019 Edition, Table 102 (Network Rail)
  7. ^ Table 65 National Rail timetable, December 2019 (Network Rail)
  8. ^ "Avanti West Coast 12 September - 11 December 2021 Timetable" (PDF). Avanti West Coast.

Further reading[]

  • Mitchell, Vic; Smith, Keith (2010). Bala to Llandudno. West Sussex: Middleton Press. figs. 101-109. ISBN 9781906008871. OCLC 668198724.
  • Mitchell, Vic; Smith, Keith (2012). Rhyl to Bangor. West Sussex: Middleton Press. figs. 41-57. ISBN 9781908174154. OCLC 859594415.
  • Rear, W.G. (1991). The Conwy Valley Line. Foxline Publishing.

External links[]

Retrieved from ""