Avanti West Coast
![]() | |||
![]() An Avanti West Coast Class 390 Pendolino at Stafford in January 2022. | |||
Overview | |||
---|---|---|---|
Franchise(s) | West Coast Partnership 8 Dec 2019 – 31 March 2026 | ||
Main region(s) | |||
Fleet size | |||
Stations called at | 46 | ||
Stations operated | 16 | ||
Parent company | FirstGroup (70%) Trenitalia (30%) | ||
Reporting mark | VT | ||
Predecessor | Virgin Trains | ||
Other | |||
Website | www![]() | ||
|
Avanti West Coast is a train operating company in the United Kingdom owned by FirstGroup (70%) and Trenitalia (30%) that began operating the West Coast Partnership franchise on 8 December 2019. It replaced Virgin Trains, which had operated the InterCity West Coast franchise between 1997 and 2019. The franchise was initially scheduled to run until March 2030, operating High Speed 2 services from 2026.[1] However, in December 2020, it was announced that it will be terminated on 31 March 2026 as part of the abolition of the franchise system.[2]
The franchise covers long-distance passenger services on the West Coast Main Line between London, the West Midlands, North West England, North Wales and Scotland, connecting six of the UK's largest cities: London, Birmingham, Liverpool, Manchester, Glasgow and Edinburgh, which have a combined metropolitan population of over 18 million.
History[]
In November 2016, the Department for Transport (DfT) announced that the InterCity West Coast franchise would be superseded by the West Coast Partnership (WCP), which would include operating High Speed 2 (HS2) services from 2026.[3]
The DfT required that bidders have experience in high-speed trains and infrastructure, hence all partnered with an existing high-speed operator.[4][5] In June 2017, the DfT announced that three consortia had been shortlisted to bid for the franchise:[6][7]
- FirstGroup (70%) / Trenitalia (30%)
- MTR Corporation (75%) / Guangshen Railway Company (25%)
- Stagecoach (50%) / SNCF (30%) / Virgin Group (20%)
In December 2018 Renfe Operadora joined the MTR-led bid.[8] In April 2019, the Stagecoach-led bid was disqualified after it proposed significant changes to the commercial terms.[9]
In August 2019 the DfT awarded the franchise to the First Trenitalia consortium with Avanti West Coast to commence operations on 8 December 2019.[10][11] The Competition and Markets Authority launched a merger inquiry into the award of the franchise following a referral from the European Commission.[12][13]
Services[]
Avanti West Coast currently operates the same services as Virgin Trains did on the West Coast Main Line.
Over the course of the franchise several timetable changes are expected to be made.[14]
Unlike London North Western Railway and London Overground, Oyster or Contactless payment card are not valid on Avanti West Coast services between London Euston and Watford Junction.
As of September 2021, the intercity routes are shown below:
London - West Midlands | |||
---|---|---|---|
Route | tph | Calling at | Stock |
London Euston to Birmingham New Street[a] | 1 |
|
|
London Euston to Shrewsbury | - |
|
221 |
London - Manchester | |||
Route | tph | Calling at | Stock |
London Euston to Manchester Piccadilly via Stoke-on-Trent | 1 |
|
390 |
London Euston to Manchester Piccadilly via Crewe | 1 |
| |
London - Chester and North Wales | |||
Route | tph | Calling at | Stock |
Crewe to Holyhead | - |
|
221 |
London - Liverpool | |||
Route | tph | Calling at | Stock |
London Euston to Liverpool Lime Street | 1 |
|
390 |
London - North West and Scotland | |||
Route | tph | Calling at | Stock |
London Euston to Glasgow Central | 1 |
|
390 |
London Euston to Blackpool North /Edinburgh Waverley/Glasgow Central via Birmingham New Street | 1 |
|
|
London - Crewe | |||
Route | tpd | Calling at | Stock |
London Euston to Crewe via Trent Valley Line | 1 |
|
390 |
London Euston to Crewe via Birmingham New Street | 2 |
|
Future services[]
![]() | This section needs to be updated. The reason given is: Some of these 2021 future dates are now in the past.(January 2022) |
Future services include:
- a daily service will be introduced between London Euston and Walsall from May 2021, with an additional northbound service from 2022
- additional calls will be made at Motherwell from May 2021
- an additional service will be introduced to Shrewsbury from December 2022
- a direct service will be introduced between London Euston and Llandudno during the summer months from May 2021
- subject to approval by the Office of Rail and Road, an additional hourly service will be introduced between London Euston and Liverpool Lime Street with a stop at Liverpool South Parkway from December 2022
- additional direct journeys at Milton Keynes Central to and from London Euston from December 2022
- extension of the daily service from London Euston to Wrexham General to Gobowen from December 2022
- earlier first trains and later last trains from London Euston to Llandudno Junction on weekends from December 2022
- earlier first trains and later last trains from London Euston to Chester on weekends by December 2022
Named trains[]
Avanti West Coast operates a named passenger train:
Name | Origin | Destination | Other details |
---|---|---|---|
Royal Scot | Glasgow Central | London Euston |
Rolling stock[]
Avanti West Coast commenced operations having inherited the existing Super Voyager and Pendolino fleets from Virgin Trains.
Current fleet[]
Class | Image | Type | Top speed | Carriages | Number | Built | Notes | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
150 Sprinter | ![]() |
DMU | 75 | 121 | 2 | 1 | 1986-1987 | 150264 shared between Avanti West Coast and Transport for Wales - Used on 1D25 Wrexham General to Crewe |
221 Super Voyager | ![]() |
DEMU | 125 | 200 | 5 | 20 | 2001–2002 | Set numbers 221101-118 & 221142-143 Refurbished and overhauled. They are scheduled to be replaced from 2022 by the new AT300 units.[17][18] |
390/0 & 390/1 Pendolino | ![]() ![]() |
EMU | 140 | 225 | 9 | 21 | 2001–2004 | Pendolino (from the Italian word Pendolo) refers to tilting trains. To be retained long-term and refurbished throughout.[19] |
![]() | ||||||||
140 | 225 | 11 | 31 | 2001-2004 | Pendolino (from the Italian word Pendolo) refers to tilting trains. To be retained long-term and refurbished throughout.[19] | |||
4 | 2010-2012 | |||||||
![]() |
Future fleet[]
All 20 of the Class 221 Super Voyager units will be replaced by 23 new trains from the Hitachi A-train family with maintenance taking place at Alstom's Oxley TRSMD depot in Wolverhampton.[20][21] These trains are to be divided into thirteen Class 805 bi-mode multiple units and ten Class 807 electric multiple units.[22] Although the units will have the same top speed, they will not tilt like the Class 390 Pendolinos nor the Class 221 "Super Voyager" units they will replace. The Class 805 units are to be used for services to Shrewsbury, Chester, Gobowen and North Wales and the Class 807 units are to be used for services to Birmingham New Street, Blackpool North and Liverpool Lime Street (alongside the Pendolinos).[19][23]
Avanti West Coast plans to operate at least 54 new trains for High Speed 2 services, these trains will be built by Hitachi Rail and Alstom in the UK and are expected to enter service between 2029-2033.[24]
Family | Class | Image | Type | Top speed | Number | Carriages | Routes operated | Entering service | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Hitachi AT300 | 805 | ![]() |
Bi-mode multiple unit | 125 | 200 | 13 | 5 |
|
2022 |
![]() | |||||||||
807 | Electric multiple unit | 125 | 200 | 10 | 7 |
| |||
![]() | |||||||||
Alstom/Hitachi | TBA | Electric multiple unit | 225 | 360 | 54[25] | 8 |
|
2029-2033 |
Notes[]
- ^ The London-Scotland via Birmingham service means a total of 2tph between London Euston and Birmingham New Street
References[]
- ^ "Avanti West Coast prepares for launch on December 8". International Railway Journal. 28 November 2019. Retrieved 19 December 2020.
- ^ "Two franchises abolished for good, as First and DfT agree terms | Railnews | Today's news for Tomorrow's railway". www.railnews.co.uk. Retrieved 19 December 2020.
- ^ "New West Coast rail franchise to run HS2 services". BBC News. Retrieved 8 November 2016.
- ^ Lea, Robert. "Wanted: Superfast mover to partner Virgin and Stagecoach for HS2". The Times. Retrieved 4 March 2017.
- ^ "RENFE poised to join Virgin's HS2 franchise bid". Railway Gazette International. DVV Media Group. Retrieved 12 March 2017.
- ^ West Coast Partnership and South Eastern rail franchise bidders Department for Transport 22 June 2017
- ^ "Three shortlisted for West Coast Partnership franchise". Railway Gazette International. DVV Media Group. Retrieved 22 June 2017.
- ^ "RENFE joins MTR's West Coast Partnership bid team". Railway Gazette International 20 December 2018
- ^ Stagecoach disqualified from three franchises in pension dispute Railway Gazette 10 April 2019
- ^ FirstGroup and Trenitalia welcome West Coast Partnership Award FirstGroup 14 August 2019
- ^ "West Coast marks new partnership model for rail" (Press release). Department for Transport. 14 August 2019.
- ^ "First Rail Holdings & Trenitalia UK / West Coast Partnership Rail Franchise". GOV.UK. Retrieved 27 October 2019.
- ^ Topham, Gwyn (27 November 2019). "West coast train services to be rebranded with Avanti logo". The Guardian. London. Retrieved 28 November 2019.
- ^ West Coast Partnership franchise improvements map Department for Transport 14 August 2019
- ^ "Avanti West Coast 12 September - 11 December 2021 Timetable" (PDF). Avanti West Coast.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Avanti West Coast Sunday 12 September to Saturday 11 December 2021 Timetable" (PDF). Avanti West Coast.
{{cite web}}
: CS1 maint: url-status (link) - ^ Holden, Michael (31 December 2020). "Avanti West Coast and Bombardier completes £8 million refurb of Voyager trains". Rail Advent.
{{cite web}}
: CS1 maint: url-status (link) - ^ Holden, Michael (29 January 2021). "Avanti West Coast unveils new Class 221 Voyager livery". Rail Advent.
{{cite web}}
: CS1 maint: url-status (link) - ^ a b c First Trenitalia awarded West Coast Partnership Railway Gazette International 14 August 2019
- ^ "Hitachi Rail chosen to build new InterCity trains for Avanti West Coast". Global Railway Review. Retrieved 13 July 2020.
- ^ Nowell, David (6 December 2019). "Inter-city rail operator's £350m new trains fleet to be built in UK". Lancashire Post. Preston. Retrieved 13 July 2020.
- ^ Clinnick, Richard (9 June 2020). "Avanti confirms class numbers for Hitachi train order". Rail. Peterborough. Retrieved 13 July 2020.
- ^ "Avanti West Coast launched", Railways Illustrated, February 2020, page 6
- ^ "HS2: New £2bn 225mph trains to be designed and built in the UK by Hitachi and Alstom". RailAdvent. 9 December 2021. Retrieved 9 December 2021.
- ^ "Alstom-Hitachi joint venture wins £2bn HS2 fleet contract". International Railway Journal. 9 December 2021. Retrieved 11 December 2021.
External links[]
![]() |
Wikimedia Commons has media related to Avanti West Coast. |
- Ferrovie dello Stato Italiane
- FirstGroup
- High Speed 2
- Railway companies established in 2019
- Train operating companies in the United Kingdom
- 2019 establishments in the United Kingdom