Merseyrail

From Wikipedia, the free encyclopedia

Merseyrail
Merseyrail logo.svg
Merseyrail Class 507s, Liverpool Central railway station (geograph 3787001).jpg
Northern Line trains at Liverpool Central.
Overview
OwnerMerseytravel, Network Rail
Area servedLiverpool City Region
LocaleMerseyside
Cheshire
Lancashire
Transit typeCommuter rail
Rapid transit
Number of lines2 (plus main line commuter services)
Number of stations68 on the 3rd rail network
Daily ridership110,000
Annual ridership34,000,000
Chief executiveAndy Heath
HeadquartersRail House, Liverpool
Websitewww.merseyrail.org
Operation
Began operation1977; 44 years ago (1977)
Operator(s)Serco-Abellio, Network Rail
CharacterCommuter Rail, National Rail Franchise
Number of vehicles57
Train length3 cars, 6 cars during peak times
Headway15 minutes (general), 5 minutes (central sections), 30 minutes (Ellesmere Port branch, general in evenings and on Sundays)
Technical
Track gaugeStandard gauge
Electrification750 volt DC third rail
hideSystem map

Unofficial map depicting the Merseyrail network and surrounding lines

Merseyrail is an urban rail network serving Liverpool, England, the surrounding Liverpool City Region, the Wirral Peninsula, and the adjacent areas of Cheshire and Lancashire, including a number of underground stations. The core of the network is formed by two dedicated electrified lines known as the Northern Line and the Wirral Line, which run underground in the centres of Liverpool and Birkenhead. Separate from the third rail electrified network is the City Line, which is a term used by the governing body Merseytravel referring to local Northern Trains services it sponsors serving in its area operating on the Liverpool to Manchester Lines and Liverpool to Wigan Line. Many of the City Line stations are branded Merseyrail using Merseyrail ticketing.[1]

The Merseyrail third rail network has 68 stations and 75 miles of route, of which 6.5 miles are underground. Carrying approximately 110,000 passengers each weekday, or 34 million passengers per year, it forms the most heavily used urban railway network in the UK outside London.[2][3][4][5]

The first part of the large comprehensive urban network was initially opened in 1977 by merging separate rail lines by constructing new tunnels under Liverpool city centre and Birkenhead.[1] Although financial constraints have prevented some of the 1970s plans for the network being realised, the network has been extended on its peripheries, with additional extensions proposed. The extensions were created by electrifying existing lines and then transferring the elecrified sections into Merseyrail.

The network is operated by a joint venture between franchise holder Serco and Abellio, who superseded Arriva Trains Merseyside in 2003. The contract is for 25 years expiring in 2028.[6][7] Serco-Abellio operate a fleet of 59 trains and as of 2015, employ 1,200 people.[8]

Point-to-point or return tickets are purchased from staffed offices or ticket machines, but the system is tightly integrated with Merseytravel's City Region-wide pass system, which also encompasses the Mersey Ferries and city and regional bus networks. Merseytravel's smart ticketing is via the local MetroCard smartcard system, including Merseyrail travel.[9]

Current network[]

Geographic map of the Merseyrail network, City Line, and minor routes.
  Wirral line
  Primary route
  Secondary route
  Rural route
  Goods line
  Disused line

The network is operated by the Merseyrail train operating company. Two lines known as the Northern Line and the Wirral Line with each line having substantial branches compose the electric third-rail part of the network. The lines are electrified throughout using the third-rail 750 V DC system. The power supply to the third rail is monitored and controlled by the Electric Control Room at Sandhills. The City Line (marked red on the map) is operated primarily by Northern with funding from Merseytravel. The line is mainly electrified with one branch, the Liverpool to Manchester line via Warrington, operated by diesel trains.[10][11]

Trains on the Northern Line and Wirral Line cover the Liverpool City Region. Their total track length is 75 miles (121 km), with 68 stations. The lines connect Liverpool city centre with cities and towns on the outer reaches of the city region, such as Southport, Chester and Ormskirk. Frequent intermediate stops serve other sections of the urban area. Trains run at an off-peak interval of fifteen minutes on most branches, with lines converging to provide a frequency of up to every five minutes within central Liverpool and under the River Mersey to Birkenhead. The network has high frequency in the central underground sections with operation as a self-contained network making it comparable to European S-train systems.

A station sign with a large yellow 'M' logo and the name 'Old Roan' underneath. Icons mark rail and bus services.
A typical suburban Merseyrail totem at Old Roan station, marking an interchange with local bus services.

The three lines interchange as follows:

  • Northern and City Line services interchange at Liverpool South Parkway and Hunts Cross in the south of the city.
  • Wirral and City Lines interchange at Lime Street in the city centre.
  • Northern and Wirral lines interchange at Liverpool Central and Moorfields in the city centre

Northern Line[]

Merseyrail Northern Line Signage Logo.svg

The Northern Line is shown in blue on the Merseyrail map and denoted by the above wordmark on underground stations. Services operate on three main routes: from Hunts Cross in the south of Liverpool to Southport via the Link tunnel from Brunswick station through central Liverpool, from Liverpool Central to Ormskirk, and from Liverpool Central to Kirkby. Each route operates a train every 15 minutes from Monday to Saturday, giving a frequent interval between trains on the central section. Some additional trains run at peak hours on the Southport line.

Connections are available at Southport to Wigan Wallgate and Manchester Airport; at Liverpool South Parkway for services operated by London Northwestern Railway, East Midlands Railway, TransPennine Express and Northern serving Birmingham New Street, Manchester Oxford Road, Blackpool North and various destinations within Yorkshire and the West Midlands; at Hunts Cross to Warrington Central and Manchester Oxford Road; at Ormskirk to Preston; and at Kirkby to Wigan Wallgate and Manchester Victoria.[12]

On matchdays at Everton F.C.'s Goodison Park and Liverpool F.C.'s Anfield, Northern Line services connect with the SoccerBus service at Sandhills station to transport fans to the stadia. Bus departure is at frequent intervals from Sandhills station with ticketing to combine both modes of travel. Kirkdale station is within walking distance of Goodison Park.

Wirral Line[]

Merseyrail Wirral Line Signage Logo.svg

The Wirral Line is shown in green on the Merseyrail map and denoted by the above wordmark on underground stations. Services operate from the four Wirral terminus stations of: Chester, Ellesmere Port, New Brighton and West Kirby. Each line from the terminus stations runs through Hamilton Square underground station in Birkenhead then through the Mersey Railway Tunnel, continuing around the single track underground loop tunnel under Liverpool's city centre. Trains head back into the Mersey Railway Tunnel to return to one of the Wirral terminus stations.

Monday-Saturday services are every 15 minutes from Liverpool to Chester, New Brighton and West Kirby, and every 30 minutes to Ellesmere Port (Monday - Sunday). These combine to give a service at least every five minutes from Birkenhead Hamilton Square and around the loop under Liverpool's city centre.[12]

Connections are provided at Bidston on the West Kirby branch for the Borderlands Line to Wrexham, operated by Transport for Wales, and at Chester to Crewe and London Euston, Wrexham and Shrewsbury, the North Wales Coast line to Llandudno and Holyhead, and to Manchester either via Warrington or via Northwich and Knutsford. At Ellesmere Port there is a minimal service to and from Warrington.[12]

City Line[]

Merseyrail City Line Signage Logo.svg

Thatto Heath station on the now electrified Liverpool to Wigan City Line. The station is branded Merseyrail with trains operated by Northern.

The City Line is shown in red on the Merseyrail map and denoted by the above wordmark on maps. Essentially the City Line is shared train services. When a commuter train, not operated by Merseytravel, enters the Merseytravel area it becomes a Merseyrail service. The stopping services running through the Liverpool City Region are sponsored by Merseytravel with stations given Merseyrail's yellow branding, signage and ticketing.

The line is the suburban/regional services which depart from the mainline surface platforms at Liverpool Lime Street on the Liverpool–Wigan line, the two routes of the Liverpool–Manchester lines, the Liverpool-Crewe Line, Liverpool-Chester line via Runcorn and the Liverpool-Blackpool line.[13][14][15] Merseyrail does not operate the trains or stations; however, the trains stop at two stations operated by Merseyrail. Services are less frequent than those on the Northern Line and Wirral Line, generally half-hourly on weekdays.

Two services are not electrified, the Manchester via Warrington Central and Chester via Runcorn. Services are provided by the Northern and London Northwestern Railway train operating companies.

In 2015, Class 319 electric multiple units were transferred from the Thameslink route. Following a refurbishment, a repaint and the removal of the third rail collector shoes, they are operating on the newly electrified lines between Liverpool, Wigan and Manchester, which incorporates the City Line.[11]

Services[]

Due to the COVID-19 Pandemic Merseyrail is currently running a reduced service.

Typical weekday off-peak service on the Merseyrail-run Northern and Wirral lines as of 14 March 2021 is as follows:[16][17]

Northern Line
Route tph Calling at
Hunts Cross to Southport 3 Liverpool South Parkway, Cressington, Aigburth, St Michaels, Brunswick, Liverpool Central, Moorfields, Sandhills, Bank Hall, Bootle Oriel Road, Bootle New Strand, Seaforth & Litherland, Waterloo, Blundellsands & Crosby, Hall Road, Hightown, Formby, Freshfield, Ainsdale, Hillside and Birkdale
Liverpool Central to Ormskirk 3 Moorfields, Sandhills, Kirkdale, Walton, Orrell Park, Aintree, Old Roan, Maghull, Maghull North, Town Green and Aughton Park
Liverpool Central to Kirkby 3 Moorfields, Sandhills, Kirkdale, Rice Lane and Fazakerley
Wirral Line
Route tph Calling at
Liverpool Lime Street to New Brighton 3 Liverpool Central (from Lime Street only) / Moorfields (to Lime Street only), Liverpool James Street, Birkenhead Hamilton Square, Conway Park, Birkenhead Park, Birkenhead North, Wallasey Village and Wallasey Grove Road
Liverpool Lime Street to West Kirby 3 Liverpool Central (from Lime Street only) / Moorfields (to Lime Street only), James Street, Hamilton Square, Conway Park, Birkenhead Park, Birkenhead North, Bidston, Leasowe, Moreton, Meols, Manor Road and Hoylake
Liverpool Lime Street to Chester 3 Liverpool Central (from Lime Street only) / Moorfields (to Lime Street only), James Street, Hamilton Square, Birkenhead Central, Green Lane, Rock Ferry, Bebington, Port Sunlight, Spital, Bromborough Rake, Bromborough, Eastham Rake, Hooton, Capenhurst and Bache
Liverpool Lime Street to Ellesmere Port 2 Liverpool Central (from Lime Street only) / Moorfields (to Lime Street only), James Street, Hamilton Square, Birkenhead Central, Green Lane, Rock Ferry, Bebington, Port Sunlight, Spital, Bromborough Rake, Bromborough, Eastham Rake, Hooton, Little Sutton and Overpool

City Line services are not operated by Merseyrail, but have timetables produced by Merseytravel and are included here for completeness. Typical off-peak weekday service is as follows:[18]

City Line
Route tph Calling at Operator
Liverpool Lime Street to Wigan North Western 2 Edge Hill, Wavertree Technology Park, Broad Green, Roby, Huyton, Prescot, Eccleston Park, Thatto Heath, St Helens Central, Garswood and Bryn Northern Trains
Liverpool Lime Street to Blackpool North 1 Huyton, St Helens Central, Wigan North Western, Euxton Balshaw Lane, Leyland, Preston, Kirkham & Wesham and Poulton-le-Fylde
Liverpool Lime Street to Warrington Bank Quay 1 Edge Hill, Wavertree Technology Park, Broad Green, Roby, Huyton, Whiston, Rainhill, Lea Green, St Helens Junction and Earlestown
Liverpool Lime Street to Manchester Airport 1 Edge Hill, Wavertree Technology Park, Broad Green, Roby, Huyton, Whiston, Rainhill, Lea Green, St Helens Junction, Earlestown, Newton-le-Willows, Patricroft, Eccles, Manchester Oxford Road, Manchester Piccadilly, Mauldeth Road, Burnage, East Didsbury, Gatley and Heald Green; trains continue to Crewe
Liverpool Lime Street to Manchester Victoria 1 Lea Green; trains continue to Scarborough TransPennine Express
1 Newton-le-Willows; trains continue to Edinburgh via York and Newcastle
Liverpool Lime Street to Manchester Oxford Road 1 Edge Hill, Mossley Hill, West Allerton, Liverpool South Parkway, Hunts Cross, Halewood, Hough Green, Widnes, Warrington West, Warrington Central, Birchwood, Irlam, Urmston and Deansgate Northern Trains
0.5 Mossley Hill, West Allerton, Liverpool South Parkway, Hough Green, Widnes, Warrington Central, Padgate, Birchwood, Glazebrook, Irlam, Flixton, Chassen Road, Urmston and Deansgate
0.5 Mossley Hill, West Allerton, Liverpool South Parkway, Hough Green, Widnes, Warrington Central, Padgate, Birchwood, Irlam, Flixton, Urmston, Humphrey Park, Trafford Park and Deansgate
Liverpool Lime Street to Manchester Airport 1 Liverpool South Parkway, Warrington West, Warrington Central, Birchwood, Manchester Oxford Road, Manchester Piccadilly, Mauldeth Road and East Didsbury
Liverpool Lime Street to Manchester Piccadilly 1 Liverpool South Parkway, Widnes, Warrington Central and Manchester Oxford Road; trains continue to Nottingham and Norwich East Midlands Railway
Liverpool Lime Street to Crewe 2 Liverpool South Parkway, Runcorn, Acton Bridge (limited), Hartford and Winsford (1tph); trains continue to Birmingham London Northwestern Railway
1 Runcorn; trains continue to London Avanti West Coast

Fleet[]

Services on the electrified Merseyrail network are operated by British Rail Class 507 and Class 508 electric multiple unit trains (EMUs). These replaced pre-war Class 502 (originally constructed by the LMS) and similar Class 503 EMUs. There are 57 trains in service on the network. This is down from an initial 76: twelve 508s were transferred to Connex South Eastern in 1996, and a further three were transferred to Silverlink to supplement its fleet of Class 313 EMUs in North London. These train sets had been stored on Merseyside as surplus from the 1990s.

Two sets have been written off and scrapped. These are unit 507022 in 1991, after a collision, and unit 508118, which had been gutted by fire in an arson attack in Birkenhead in 2001.

The fleet was refurbished between 2002 and 2005 by Alstom at a cost of £32 million, involving trainsets being transported to and from Eastleigh works behind Class 67 locomotives. Improvements to the trains included new high-backed seating, interior panel replacement, new lighting, the installation of a Passenger Information System and a new external livery.[19]

All trains of the current fleet will begin to be phased out in favour of the Class 777 trains (estimated to begin in 2021).

Current fleet[]

Class Image Type Top speed Carriages Number Routes operated Built In service
 mph   km/h 
507 Merseyrail Class 507, 507010, Birkenhead North railway station (geograph 4016684).jpg EMU 75 120 3 32
  • All Northern Line services
  • All Wirral Line services
1978–1980 1978–present
Class 507 Merseyrail New Diagram.png
508/1 Merseyrail Class 508, 508115, Birkenhead North railway station (geograph 4016726).jpg EMU 75 120 3 25
  • All Northern Line services
  • All Wirral Line services
1979–1980 1979–present
Class 507 Merseyrail New Diagram.png

Past fleet[]

Past: A British Rail Class 503 train on the Liverpool Loop and Link underground system. This train was one of the original batch built by the LMS in 1938 being replaced by the 507/508 fleet introduced in the 1980s.

The original service on the Merseyrail lines was provided by Class 502s on the Northern Line and Class 503s on the Wirral Line. The former was withdrawn by 1980 and the latter by 1985. Although the withdrawal of the Class 503s began in June 1980,[20] the majority of the Class 503s were progressively withdrawn from June 1984, with the final service train running on 29 March 1985.[21]

Merseyrail formerly had four Class 73 electro-diesel locomotives for shunting, sandite trains, engineering works and other departmental duties. These locomotives were sold to a preservation company in 2002.[citation needed]

Future fleet[]

Future: Stadler METRO (Class 777) Merseyrail train, to be introduced from 2020, tailor-made for the Merseyrail network.

On 28 January 2020 Swiss rolling-stock manufacturer Stadler Rail provided the first of a new fleet of 53 new train sets, designated Class 777, being built at Stadler's factory in Bussnang, Switzerland. The final units are due to enter service in 2021.[22] The trains are based on the METRO platform, Stadler's product family for underground trains also used on the Berlin U-Bahn and the Minsk Metro. The new trains are a custom-built, bespoke design specifically for the Merseyrail network with driver only and guard capability.[23] This differs to the current fleet, which was built to a standard British Rail design for commuter services.

The new trains will be of an articulated four-car design, as opposed to the three-car units currently in service, with a significantly increased overall capacity and faster acceleration and deceleration, which gives reduced journey times. A combination of reduced weight of 99 tonnes, representing a 5.5 tonne weight reduction, and more efficient electrical systems will give a 20% reduction in energy use.

The trains are flexible being capable of operating on a combination of any of: 750 V DC third rail, 25 kV 50 Hz overhead wires or full battery operation using a five-ton battery, provided they have the correct equipment installed. As of April 2021, all trains are only fitted with 750 V DC third rail operation, along with a smaller battery for depot shunting.[24]

The National Union of Rail, Maritime and Transport Workers opposed driver-only operation on the new fleet, which they said would put passenger safety and security at risk.[25] Following a period of strike action, an agreement was reached to guarantee a guard on every train.[26]

Merseytravel has an option for a further 60 Class 777 units as part of the contract, which if exercised would see a total of 113 trains built if services are extended to new destinations such as Helsby, Skelmersdale or Wrexham.[22] The deal also involves the transfer of 155 of Merseyrail's maintenance workers and the operation of its maintenance depot at Kirkdale to Stadler Rail Service.[27] The transfer of Kirkdale depot and Merseyrail engineering personnel took place in October 2017, as construction work to modernise the depot, which is the planned maintenance hub for the Class 777s, commenced.[28]

Class Image Type Top speed Carriages Number Planned routes Built In service
 mph   km/h 
777 METRO Merseyrail Class 777.png EMU
BEMU
75 120 4 53
  • All Northern Line services
  • All Wirral Line services
2018–2021 2021–2022
Merseyrail Class 777 w-pantograph.png

Battery trains[]

The Class 777s are capable of being propelled via onboard battery sets. The battery set per car can be up to five tons in weight. The batteries can be charged via a rail terminal charger and while operating on electrified tracks.[22] When the Headbolt Lane extension was unveiled to the public, it was also announced that the original order of 52 units was increased to 53 to allow for some units to undergo battery trials.[29]

Following on from the trial, it was announced in July 2021 that the units tested had been able to travel up to 20 miles without the need for recharging. The Liverpool City Region Combined Authority stated that the battery-powered trains will run to the new Headbolt Lane station at Kirkby which is due to open in 2023.[30] The technology opens up the possibility of the trains being able to serve on routes to destinations such as Wrexham, Preston, Wigan and Warrington.

Dual-voltage trains[]

The Class 777s are being built to take power from the third rail electric network. The design gives the capability of dual-voltage operation by adding a pantograph for use with overhead wires, giving operation beyond the current network.[31]

Depots[]

A blue and grey maintenance vehicle stands at James Street underground station
Modern departmental MPV at James Street - Unlike the London Underground and Tyne and Wear Metro, Merseyrail's track maintenance is the responsibility of Network Rail.

The electric fleet is maintained and stabled at Stadler's maintenance depot and UK headquarters at Kirkdale and Birkenhead North TMD.[32] Minor repair work and train cleaning is undertaken at Kirkdale, while overhauls are completed at Birkenhead. The roles will be reversed once the Class 777 trains fully replace the existing fleet.[33] Other depots at Hall Road and Birkenhead Central were closed in 1997, and the former was demolished in April 2009.[34] The Birkenhead Central depot is proposed for reopening.[35]

There are also two depots near Southport station: Southport Wall Sidings and Southport Carriage Holding Sidings.

Franchise and concession history[]

As a result of the privatisation of British Rail, the Northern Line and Wirral Line were brought together as the Mersey Rail Electrics passenger franchise, being sold on 19 January 1997. Although franchises are awarded and administered on a national level (initially through various independent bodies, and later the Department of Transport directly), under the original privatisation legislation of 1993, Passenger Transport Executives (PTEs) were co-signatories of franchise agreements covering their areas - this role being later modified by the Railways Act 2005.[36]

The first train operating company awarded the Mersey Rail Electrics franchise contract was MTL. MTL was originally the operating arm of Merseytravel but had been privatised in 1985. The brand name Merseyrail Electrics was adopted by MTL.

The Merseyrail name became the official brand for the network in the days of British Rail, surviving several franchise holders, although the name was not used by Arriva when holding the franchise. Despite this, Merseytravel continued the Merseyrail branding at stations, allowing the name to be adopted colloquially. With acquisition by Arriva, the train operating company was rebranded Arriva Trains Merseyside from 27 April 2001. Merseyrail is referred to as "Merseyrail Electrics" by National Rail Enquiries, and as "Serco/Abellio Merseyrail" by Merseytravel.

The City Line was also privatised under the 1993 Act, but as part of a different, much larger North West Regional Railways (NWRR) franchise. Upon sale on 2 March 1997, the first train operating company awarded the NWRR franchise contract was North Western Trains (owned by Great Western Holdings). The train operating company was later bought by FirstGroup and rebranded First North Western.

The third rail electric Northern and Wirral lines were largely isolated from the rest of the National Rail network with no through passenger services to or from outside the third rail Merseyrail network. A decision was to transfer the network into exclusive Merseytravel control, being removed from the national franchising system. The Secretary of State exempted the two lines from being designated as a national railway franchise under the 1993 Act.[37]

When the Mersey Rail Electrics franchise was due for renewal, coming into force on 20 July 2003, Merseytravel contracted the operation of the two lines with a concession extending for up to 25 years. The first successful bidder was Merseyrail Electrics (2002) Ltd, a joint venture between Serco and NedRailways (renamed Abellio in 2009).[36]

The City Line which was largely diesel operated at the time, was not included in 2003 franchise, continuing as a part of the nationally administered rail franchise system. From 11 December 2004, the NWRR franchise was merged into a new Northern franchise. The first train operating company awarded this franchise contract was Northern Rail, also owned by a Serco-NedRail (Abellio) joint venture. This franchise passed to Arriva Rail North on 1 April 2016 and then to Northern Trains on 1 March 2020.

Due to the isolation of the Northern and Wirral lines, Merseyrail Electrics (2002) Ltd are keen to adopt vertical integration – taking responsibility for maintenance of the track from Network Rail. The current managing director of Merseyrail is Andy Heath.[38]

Performance[]

Operating as a self-contained network means there are relatively few problems because there is little conflict with other train operating companies. Merseyrail has publicly committed to aiming to be the best train operating company in the UK.[39][40] The latest figures released by NR (Network Rail) (as of period 12 of 2012/2013) report that Merseyrail's Public Performance Measure (PPM) was 96.2% and the moving annual average (MAA) stood at 95.5%.[41]

In February 2010, Merseyrail was named the most reliable operator of trains in the UK, with a reliability average of 96.33% during 2009–2010, the highest ever achieved by any UK train operator.[42]

Financial performance[]

Figures shown are attributable to Merseyrail Electrics 2002 Ltd, (who operate the Northern and Wirral Line sections of the "Merseyrail" branded network).

Year ending Turnover (£m) Gross profit (£m) Trading profit (£m) Pre-Tax profit (£m) Retained profit (£m)
January 2010[43] 124.5 12.1 12.5
January 2009[44] 127 11.4 6.5
January 2008[45] 116 9.2

Enforcement of by-laws[]

Merseyrail employs a team of officers who enforce railway by-laws relating to placing feet on seats, travelling without tickets, and other aspects of anti-social behaviour. The enforcement of the 'feet on seat' by-law by Merseyrail was judged to be "draconian" in September 2007.[46] However, Merseyrail stated that it did not want to take offenders to court, but was not allowed to fine offenders otherwise (unlike people who smoke on trains or station platforms).[47] Merseyrail is the only UK train operator to take such a vigorous approach, a stand which Merseyrail claims has proved very popular with commuters and has reduced anti-social behaviour on the system.[48]

History[]

Collection of separate railways[]

The Illustrated London News featuring the opening of the Mersey Railway Tunnel

The present Merseyrail system was merged from the lines of five former pre-Grouping rail systems:

  • The Mersey Railway (Liverpool Central to Rock Ferry, Birkenhead Park)
  • The Cheshire Lines Committee railway (Liverpool Central to Hunts Cross section).
  • The Lancashire and Yorkshire Railway (Liverpool Exchange to Kirkby, Ormskirk and Southport sections).
  • The Wirral Railway (Birkenhead Park to New Brighton and West Kirby)[49]
  • The Birkenhead Joint Railway (Rock Ferry to Hooton and Chester section and the Ellesmere Port branch).

The nucleus of the system was the Mersey Railway, which opened from Liverpool James Street to Green Lane, Birkenhead running through the Mersey Railway Tunnel, one of the world's first underwater railway tunnels in 1886.[12] The tunnelled route was extended to Liverpool Central in 1890. A tunnelled branch to Birkenhead Park was added in 1888 to connect with the Wirral Railway and the original line was extended to Rock Ferry to connect with the Birkenhead Woodside to Chester line in 1891.[50]

The Mersey Railway was electrified in 1903 being the world's first full electrification of a steam railway.[12] This was followed by the separate Lancashire and Yorkshire Railway line from Liverpool Exchange to Southport, which was electrified in 1906. The electrification of the former Wirral Railway lines to New Brighton and West Kirby took place in 1937 and allowed through running into Liverpool via the Mersey Railway tunnel.

Creation of Merseyrail[]

The programme of route closures in the early 1960s, known as the Beeching Axe, included the closure of two of Liverpool's mainline terminal stations, Liverpool Exchange and Liverpool Central (High Level), and one on the Wirral, Birkenhead's Woodside Station, leaving only one mainline station serving all of Merseyside at Liverpool Lime Street. Riverside terminal station at the Pier Head was the fourth terminal station to close. This was not a part of the Beeching cuts, however the demise of the trans-Atlantic liner trade forced its closure in 1971. The Beeching Report also recommended that the suburban and outer-suburban commuter rail services into both Exchange and Central High-level stations from the north and south of the city be terminated. Most of these lines were modern electrified lines. Long and medium-distance routes would be concentrated on one mainline terminal station at Lime Street station serving the populations of Liverpool, the Wirral and beyond. The closure of urban lines would create difficulty for large sections of the Merseyside population to access the one remaining mainline station at Liverpool Lime Street.

Liverpool City Council took a different view to Beeching proposing the retention of the suburban services and integrating them into a regional electrified rapid-transit network by linking all lines via new tunnels under the centres of Liverpool and Birkenhead. Apart from giving ease of transport around most of Merseyside, the rapid-transit network would give all the areas on the urban lines ease of access to the one remaining mainline station at Liverpool Lime Street, compensating for the loss of three mainline terminal stations. This would have the added benefit of diverting all local urban routes from the mainline terminus station at Lime Street to underground rail in Liverpool's centre. The result would be platforms released from urban use leaving the mainline station to focus on mid to long haul routes. This approach was backed up by the Merseyside Area Land Use and Transportation Study (the MALTS report).[51] Merseyrail was born when Liverpool City Council's proposal was adopted.[52]

Unfortunately a small section adjoining the Liverpool to Southport line was not saved from the Beeching Axe. The electrified commuter line from Liverpool Exchange reached Crossens on the Southport to Preston line in the north of Southport. The Southport to Preston line was to be axed, and rather than keeping the electrified section between Southport and Crossens, the whole Southport to Preston line was axed in 1964.[53]

The Merseyside Passenger Transport Authority, later named Merseytravel, was formed in 1969 with representatives from all Merseyside local authorities, taking responsibility for the local rail lines identified to be incorporated into the new network, henceforth known as 'Merseyrail'. At that time, the lines out of Liverpool Exchange, Liverpool Central Low Level, Liverpool Central High Level and Liverpool Lime Street stations were completely separate. The existing electric and diesel hauled lines identified to become the new Merseyrail lines were given the names of 'Northern Line', 'Wirral Line' and 'City Line' respectively. The lines out of Lime Street station would become the City Line, lines out of Exchange and Central High Level the Northern Line and the line out of Central Low Level the Wirral Line. Identifying and naming of the lines was the first stage of Merseyrail's creation.

The Strategic Plan for the North West (SPNW) in 1973 envisaged that the Outer Loop, the Edge Hill Spur connecting the east of the city to the central underground sections, and the lines to St. Helens, Wigan and Warrington would be electrified and all integrated into Merseyrail by 1991.[54]

To create the comprehensive rapid-transit network, four construction projects needed completion:

  1. The construction of the Loop Line; a tunnel extending the Wirral lines in a loop around Liverpool's city centre, creating the Wirral Line.
  2. The construction of the Link Line; a tunnel linking the lines north and south radiating out of Liverpool city centre into one. Called the Northern Line, under Liverpool's city centre, it created a north–south crossrail.
  3. The construction of the Edge Hill Spur; by reusing an 1830 tunnel, the Wapping Tunnel, recently closed in 1972, from Edge Hill junction in the east of the city centre to Central Station in the centre, enabling lines to the east of the city to access the city centre underground section.
  4. The creation of the Outer Rail Loop; effectively a rail loop around the outer suburbs of the city using existing lines that would also run through the city centre. The Northern Line would form the western section through the city centre. The loop would also be split into two loops, one north and one south of Liverpool's city centre, heading for the city centre's Central Station from Broad Green in the east via the Edge Hill Junction. A part of the scheme would be the construction of a six platform underground station at Broad Green where the two loops and the St.Helens/Wigan line met.[55]

Only the first two projects were constructed creating the fully electrified third rail Northern and Wirral Lines. The last two were cancelled late in the project after some works had actually proceeded. This isolated the City Line preventing integration into the full network with local services still entering the mainline Lime Street station, occupying platforms that could have been used for long haul routes. In the decades following the commissioning of the resulting cut-down rapid-transit network, political moves were made to complete the full project, to fully incorporate the City Line into the network, however to no avail.[56] Until the 2015 electrification of the Lime Street to Manchester and Wigan lines, the City Line remained 100% diesel hauled with the Lime Street to Warrington line still retaining diesel traction. In preparation for the full integration of the City Line into the network, the name was maintained with Merseytravel sponsoring the stations that are inside Merseyside, complete with Merseyrail branding.[55]

The Loop and Link Project[]

The loop line (Wirral Line) and link line (Northern Line) built under Liverpool in 1977

The major engineering works required to integrate the Northern and Wirral lines became known as the 'Loop' and 'Link' Project, consisting of two tunnels. The 'Loop' was the Wirral Line tunnel and the 'Link' the Northern Line tunnel, both under Liverpool's city centre. The main works were undertaken between 1972 and 1977. A further project, known as the Edge Hill Spur, would have integrated the City Lines into the city centre underground network. This would have meshed the eastern section of the city into the core underground city centre section of the electric network, releasing platforms at mainline Lime Street station for mid to long haul routes. The Edge Hill Spur was not completed due to budget cuts.

The Loop Line (Wirral Line)[]

The Loop Line is a single-track loop tunnel under Liverpool's city centre serving the Wirral Line branches. It was built to allow both greater capacity and a wider choice of destinations for Wirral Line users, which included the business and shopping districts of Liverpool city centre and mainline Lime Street station. The loop extension offered direct mainline station access to Wirral residents after the decommissioning of the mainline Woodside terminal station in Birkenhead.

Trains from Wirral arriving via the original Mersey Railway tunnel enter the loop beneath Mann Island in Liverpool continuing in a clockwise direction through James Street, Moorfields, Lime Street and Central, returning to the Wirral via James Street station. The loop tunnel gave interchanges for passengers of the Wirral Line to the Northern line at Moorfields and Central stations.[57]

The Link Line (Northern Line)[]

The original Mersey Railway tunnel from James Street to Central station, in red, still exists. The Link line, is shown in blue with the Loop line in green.

The purpose of the Link Tunnel was to link the separate urban lines north and south of the city creating a continuous north–south crossrail, called the Northern Line. A substantial section of the Northern Line had an additional function in completing the western section of a planned double-track electrified suburban orbital line, circling the city's outer suburbs, known as the 'Outer Rail Loop'. However, the eastern section of the Outer Rail Loop was never built due to budget cuts.[55]

The Link Line tunnel is a double-track tunnel that links two lines. One line running south from the city centre to Hunts Cross with the second line running north from the city centre to Southport, and the branches off this line to Ormskirk and Kirkby. One continuous line would be created, the Northern Line. The line provides direct access from the north and south of Liverpool to the shopping and business districts in the city centre via two underground stations, Liverpool Central and Moorfields, both of which also interchange with the Loop Line, which is an extension of the Wirral Line. The Northern Line effectively creates a north–south crossrail enabling passengers to travel from the south to the north of the city, and vice versa, via Liverpool city centre.

The present Northern Line underground station at Liverpool Central was originally the Mersey Railway terminus at Liverpool Central Low Level. A section of the original 1880s tunnel between James Street and Central stations was used to form the Link Tunnel. The remainder, between Paradise Street Junction and Derby Square Junction, was retained for use as a rolling stock interchange line between the Northern and Wirral lines and also for a reversing siding for Wirral Line trains terminating at James Street when the Loop Tunnel is inoperative. The rolling stock interchange section of the tunnel is not used for passenger traffic.[58]

The Hamilton Square Burrowing Junction[]

A burrowing junction was constructed at Birkenhead Hamilton Square station, to increase traffic capacity on the Wirral Line by eliminating the flat junction to the west of the station. This included a new station tunnel at Hamilton Square to serve the lines to New Brighton and West Kirby.

Liverpool Central South Junction[]

To the south of Liverpool Central Low Level Station, a new track layout was constructed as part of the Link Line project. This layout permitted the former Mersey Railway route to be connected to the former Cheshire Lines Committee route from the closed Central High Level Station and so allow the Northern Line to be extended in a southerly direction to Garston and, later, Hunts Cross. It was accomplished by excavating the trackbed of the high-level tunnel to connect the two routes by means of a gradient. As it was still necessary to accommodate a reversing siding to serve Central Low Level, and as the width of the high-level tunnel did not permit a three-track alignment, a new section of single-track tunnel was built for the Central to Garston line. This tunnel starts to the south of the station and rises to join the high-level tunnel.

At the time of construction, the opportunity was taken to construct two short header tunnels for the proposed Edge Hill Spur project (see below). Should the project go ahead, the connecting tunnels could be constructed without the need to obstruct rail services on the existing route. The junction arrangement would be a burrowing junction, as at Hamilton Square (see above), with the grade separation of tracks increasing capacity. [55]

Expanding the Network (1977 – present)[]

Electrification since 1977

The Loop and Link project was followed by a programme of expansion, electrification and new stations, which built on the greater integration and capacity provided by the new infrastructure.

Walton to Kirkby[]

On 30 April 1977, Liverpool Exchange terminus station was closed as a part of the Link tunnel project to create the electrified Merseyrail north-south crossrail line named the Northern Line. Liverpool Exchange was the terminus of the northern Liverpool to Manchester route to Manchester Victoria via Wigan Wallgate station.

A tunnel under Liverpool's city centre, the Link tunnel, created the through crossrail Northern Line. The nearby Moorfields underground through station located on the new Line Link tunnel, serving the Northern and Wirral Lines, replaced Liverpool Exchange terminus station. Since diesel trains could not operate in the underground stations and tunnels for safety reasons, trains that had terminated at Liverpool Exchange terminus from Wigan Wallgate were terminated at Sandhills station as a temporary measure, which is the last surface station before the tunnel.

A year later in 1978, the short line electrification from Walton to Kirkby extended the Merseyrail network, creating a Northern Line branch terminus and interchange station at Kirkby. The line was electrified using the standard 750 V DC third-rail Merseyrail system. The northern Liverpool to Manchester route was cut into two with differing modes of traction, electric and diesel. The diesel Wigan service terminating at Sandhills station was cut back to Kirkby. The Merseyrail electric and the Northern Rail diesel services use opposite ends of the same platform at Kirkby. Merseyrail and Northern Rail trains are generally timed to meet for ease of interchange.

Liverpool Central to Garston[]

In 1978 the Northern Line extending south from Liverpool Central Station to Garston was made possible by inclining the tunnel into Central High Level from Garston to run down into the lower level tunnel entering Central Low Level from the opposite end of the station forming one continuous tunnel. The linking of the two tunnels had been envisaged when the Mersey Railway was extended to Central from James Street in the 1890s, with the Mersey Railway ensuring the two tunnels were on the same alignment.

The diesel hauled line from Liverpool Central High Level to Gateacre in the south of the city was abandoned in 1972. On reopening under the Merseyrail brand, the electrified line never reached Gateacre as it once did, terminating three stations towards the city centre at Garston. The line was a part of the Northern Line from Garston to terminal stations at Southport, Ormskirk and Kirkby. The complete Northern Line was electrified using the Merseyrail 750 V DC third-rail system.

Garston to Hunts Cross[]

This short extension of electrified Merseyrail line at the southern end of the Northern Line opened in 1983. It facilitated passenger interchanging between the Merseyrail Northern Line services with the Merseyrail City Line and main line services from Lime Street. The reopened line passed under the West Coast Main Line Liverpool branch at Allerton but needed to cross the southern Manchester line via Warrington on the flat, which affected capacity.

Rock Ferry to Hooton, Chester and Ellesmere Port[]

Rock Ferry railway station had been a terminus for Wirral Line services since the Mersey Railway was extended there from Green Lane in 1891. Passengers for the lines to Chester and Helsby would change trains at this station from the electric service on to mainline services, operated by steam and diesel. Rock Ferry became one of the terminals for the Merseyrail Wirral Line. In 1985 the line from Rock Ferry to Hooton was electrified and incorporated in the Wirral Line of Merseyrail, Hooton thus becoming a new terminus.

Hooton is a junction station where the line to Helsby via Ellesmere Port branches off the main Chester line. The line from Hooton to Chester was electrified in 1993, Chester thus becoming a terminus station of the Wirral Line. The line from Hooton to Ellesmere Port was electrified in 1994 and incorporated into the Wirral Line, Ellesmere Port thus also becoming a terminus and interchange station.

New stations[]

A programme of new stations on the Merseyrail network expanded the coverage of the system. They are as follows:

  • Bache: On the Hooton to Chester line, opened in 1983 to replace the former Upton-by-Chester (Halt).
  • Bromborough Rake: On the Rock Ferry to Hooton line, opened in 1985 with the completion of electrification to Hooton.
  • Overpool: On the Hooton to Ellesmere Port line, opened in 1988.
    (Bache and Overpool are outside the PTE boundary and were funded by Cheshire County Council with some support from Merseytravel).
  • Eastham Rake: On the Rock Ferry to Hooton line, opened in 1995.
  • Brunswick: On the Liverpool Central to Hunts Cross line, opened in 1998. This station serves the South Docks regeneration area and also the Grafton Street area of Dingle high above the station via a staircase and footbridge.
  • Conway Park: On the Hamilton Square to Birkenhead Park underground line, opened in 1998. This station was originally intended to be built as 'cut and cover' with an office building on top. More onerous fire protection requirements arising from the Fennel report into the Kings Cross fire of 1987 made this prohibitively expensive and so the station was constructed in an open cut with lift access to the platforms. It serves the Europa Boulevard area of Birkenhead, a regeneration area.
  • Wavertree Technology Park: Opened in 2000 on the City Line route from Edge Hill to Huyton to serve the expanding Technology Park.
The former Holly Park Football ground, where Liverpool South Parkway Station now stands
  • Liverpool South Parkway: Opened in 2006 on the site of Holly Park football ground of South Liverpool F.C. in South Liverpool. It is an interchange station between the Merseyrail Northern Line from Liverpool Central to Hunts Cross and the City Line from Liverpool Lime Street to Runcorn and Warrington Central and also mainline services. The station also includes a bus terminal and large car park and has frequent bus services to Liverpool John Lennon Airport. The station was formed from an amalgamation of the four-track Allerton station and the relocation of the Merseyrail Garston Station. Garston station was closed on the opening of the new facility, the first station closure on the Merseyrail network since Liverpool Exchange station in 1977.[55]
  • Maghull North: Construction of this station began in August 2017, with the station opened on 18 June 2018.[59]

Future[]

A 1909 map showing some of the extensive rail lines around Liverpool

There have been various suggestions for ways to enlarge the Merseyrail network.[60] In August 2014 Merseytravel gave details of a 30-year plan for the network to be presented to the leaders of the city region.[61] the full plan is available at Liverpool City Region Long Term Rail Strategy

Some proposals would extend beyond the current Liverpool City Region area, while others would use former existing lines or track beds inside the area. In November 2016 the details of the next phase of the Merseyrail fleet were announced: if trains capable of use beyond the third-rail DC network are selected as replacements, various expansions can be achieved without electrification of the entire new route. The newly acquired Class 777 trains are capable of operating on unelectrified track, drawing this aspiration closer.[62] In July 2021, the metro-mayor of the Liverpool City Region announced that bi-modal battery electric Class 777 trains will operate on Merseyrail, extending the network. "This capability means they could eventually provide a direct service from as far as Preston and Wrexham". [63]

The Rail Strategy published in 2020, on page 22 states: "Other options that could be further developed by funders or stakeholders (to meet connectivity based conditional outputs) following this Study could be:

  • Extending the Merseyrail network to Shotton (and possibly on to Wrexham);
  • Extending the Merseyrail network to Skelmersdale (and possibly on to Wigan Wallgate); and
  • Extending the Merseyrail network to Burscough Junction (and possibly on to Preston)".[64]

Proposed future stations[]

St.James station[]

Liverpool City Region Combined Authority announced in August 2019 that it was planning to use part of a £172m funding package to reopen St James Station in Liverpool City Centre and a build a new station at Headbolt Lane, Kirkby.[65]

The currently disused St James railway station is located on the corner of St.James' Place and Parliament Street in the Baltic Triangle district being with closure in 1917. The station is in a deep cutting on the operational crossrail Northern Line tunnel section between Liverpool Central Station and Brunswick Station.

In 2020 a series of investments and land purchases advanced the case for a station at the site of St James in the Baltic Triangle.[66][67][68] Part of the Spatial Regeneration Framework for the area includes a new Baltic Triangle railway station.[69][70]

Headbolt Lane station[]

A new station at Headbolt Lane northeast of Kirkby was first proposed in the 1970s, however, a later proposed plan in 2013 failed to receive funding.[71]

In August 2019, Liverpool City Region Combined Authority announced that funding is available for the construction of a three platform station. The station will be the terminal of a Northern Line branch, and also an interchange on a Headbolt Lane to Manchester line via Wigan. The platforms will be designed to accommodate any future Merseyrail extension to Skelmersdale.[72][65][73][74] The station will accommodate a 300 space car park and bus interchange.[73] In August 2021 network rail formaly applied to Knowsley Borough Council for planning permission for a station.[75]

The Liverpool City Region Combined Authority announced in July 2021 that Class 777 battery-electric trains will serve the new station on opening.[76] The Merseyrail extension from Kirkby to Headbolt Lane will not be electrified.

Vauxhall station[]

In its 30-year plan of 2014 Merseytravel mentions the possibility of a new station between Moorfields and Sandhills in the Vauxhall area on the Northern Line.[77] A station at this location would serve the under construction Everton F.C. stadium at Bramley-Moore Dock, which is near to the Northern Line.

Tram-trains[]

In August 2009, it was reported that a new tram-train link to Liverpool John Lennon Airport and a link to Kings Dock from the east of the city had been proposed.[78]

  • John Lennon Airport: the existing Northern Line and the City Line from Liverpool Lime Street to Liverpool South Parkway are being assessed. From South Parkway the tram-trains would transfer to a new tramway. Merseytravel commissioned a feasibility study into increasing rail links with the airport in 1995 but no further work has been undertaken.[79]
  • Kings Dock to Edge Hill: a link from Edge Hill in the east of the city to the Arena at Kings Dock in the city centre was also being considered.[78]

Battery train trials[]

The Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, stated that trials of new Merseyrail battery trains would be undertaken in 2020. The aim was to extend the electric network network onto unelectrified track. A number of lines were targeted for electric 3rd rail/battery train trials, for network extension. Merseyrail Class 777 electric trains have the capability to operate on unelectrified track, which otherwise would not be considered for track electrification on cost grounds.[80] The lines chosen for the trials are:

  • Ellesmere Port to Helsby: On page 37 of the Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, stated that a trial of new Merseyrail battery trains will be undertaken in view to incorporate the 5.2 miles (8.4 km) stretch of track from Ellesmere Port to Helsby interchange station onto the Merseyrail network. A successful outcome may make Helsby one of the terminals of the Wirral Line replacing Ellesmere Port, with Stanlow and Thornton and Ince and Elton stations brought into the network.[80]
  • Ormskirk to Preston: Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, page 37, stated and undertaking to review new Merseyrail battery trains to incorporate Preston onto the Merseyrail network by extending the Merseyrail Northern Line over 15 miles (24 km) from Ormskirk to Preston interchange station. The aim was to have Preston one of the terminals of the Northern Line, with Burscough Junction, Rufford and Croston stations brought onto the Merseyrail network. The document stated, "The potential use of battery powered Merseyrail units may improve the business case".[80]

The Liverpool City Region Combined Authority announced in July 2021 that the trial had been successful. The new units were able to travel up to 20 miles on the fitted batteries. This opens up the possibilities of the trains being used to serve other destinations such as Skelmersdale, Wrexham, Warrington and Runcorn.[30]

Extending the network via battery/electrification[]

Many proposals to electrify lines adding them to the existing Merseyrail network have been proposed over past decades. However, in 2017 the Department for Transport announced that electrification of lines in Britain will only be where necessary with many planned projects cancelled. Bi-modal trains with combinations of battery electric, hydrogen fuel cell and diesel engines are the preferred options.[81]

Merseytravel purchased Class 777 trains incorporating battery electric technology, having conducted trials on sections of unelectrified track with a view to incorporate into Merseyrail. The successful trials will curtail future full electrification of track. To meet the ambitions of the Liverpool City Region’s Long Term Rail Strategy, Merseytravel have clear aspirations to extend the network beyond the current Merseyrail boundaries. Locations such as Skelmersdale, Wrexham and Warrington have been targetted.[82] Many of the lines that were proposed over the decades to be electrified are under consideration for battery electric operation.

Kirkby to Wigan[]

Wigan Wallgate station

In 1977, the Liverpool to Kirkby section of the Liverpool-to-Bolton route was electrified being merged into Merseyrail. Kirkby became the terminus of the Northern Line Kirkby branch. The former through service to Bolton was split into two, with passengers making through journeys having to change at Kirkby from the Merseyrail electric network to the Northern Rail diesel network onwards to Wigan and Bolton.

Electrifying track from Kirkby, extending the Northern Line to Wigan Wallgate, was a long-term aspiration of Merseytravel in 2014. The extension was identified by Network Rail as a route where electrification would enable new patterns of passenger services to operate.[61][83][84] The aspiration was accelerated in March 2015 with the Electrification Task force placing electrification of the line from Kirkby to Salford Crescent in a Tier 1 priority category.[85][86]

The line from Kirkby to the proposed Headbolt Lane staion, will be operated by Class 777 battery trains.[87] The proposed Merseyrail link to Skelmersdale remains under development[88]

These two developments may accelerate the introduction of battery trains on this line.[87]

Ormskirk to Preston[]

Preston station

Electrification from Ormskirk to the interchange atation at Preston has been considered in conjunction with the Burscough Curves reopening, detailed below. It would re-establish the most direct Liverpool-Preston route being one of Merseytravel's long-term aspirations.[83] However, in 2008 Network Rail said the benefit-to-cost ratio of the scheme was insufficient to justify this scheme in the near future[89] though the scheme continued to be mentioned by Network Rail.[84] Third rail battery electric train trials were undertaken in 2020 by Merseyrail on this section of track to provide a Liverpool to Preston service.[80]

Bidston to Wrexham[]

The Bidston interchange terminal of the northern extreme of Borderlands Line and through station for the Wirral Line to West Kirby.
Wrexham Central the southern terminal of the Borderlands Line.

The north–south aligned Borderlands Line from Bidston south to Wrexham Central is operated by Transport for Wales using diesel trains on unelectrified track. There have been various proposals to electrify some or all of the line over the years. The most recent study, conducted by Network Rail in 2008, investigated the costs of extending the Merseyrail network third-rail electrification to Wrexham. However, when the cost was estimated at £207 million,[90] Merseytravel announced that cheaper overhead line electrification would be considered instead. This would require dual-voltage trains with third-rail and overhead-wire capability.[91] The Welsh government is pushing for improved rail connections between North Wales and Liverpool which may accelerate the electrification of the line,[92] and the scheme continues to be mentioned by Network Rail[84] and Merseytravel.[61] Merseytravel believe that increasing the frequency of the trains will increase the levels of passengers creating a stronger case for electrification.[93]

In March 2015, the introduction of battery powered trains was proposed for the Borderlands line by Network Rail.[94] The Network Rail document proposes using battery powered rolling stock precluding full electrification of the line, also providing a cheaper method of increasing connectivity into the electrified Birkenhead and Liverpool sections of the Wirral line. From the document:

"In the longer term, potential deployment of rolling stock with the ability to operate on battery power for part of their journey may provide the ability in an affordable manner to improve the service offering between the Wrexham – Bidston route and Liverpool."[94]

KeolisAmey Wales, the operators of the Wales and Borders franchise Transport for Wales, are to use refurbished Class 230 metro trains using electric motor traction supplied with power by on-board batteries.[95] An on-board diesel generator charges the batteries, with regenerative braking extending the battery's charge. The Vivarail built trains will serve the line between Wrexham and Bidston.[96][97] These new trains have put the full electrification of the line on hold. Welsh Economy Secretary, Ken Skates, stated that the Welsh government were in an advanced stage of talks with Merseytravel about running a direct service from Wrexham to Liverpool.[98]

Hunts Cross to Warrington[]

Warrington Central.

The Strategic Plan for the North West, the SPNW, in 1973 envisaged that the Liverpool to Warrington line would be electrified and integrated into Merseyrail by 1991 as a part of the Northern Line making Warrington central a terminus.[54] In March 2015 the Electrification Task force placed electrifying the line from Liverpool to Manchester via Warrington Central in the Tier 1 priority category.[85] The Liverpool City Region’s Long Term Rail Strategy has clear aspirations to extend the network to Warrington, using the introduction of the Class 777 trains as an enabler.[82]

Southport to Wigan[]

Southport to Wigan has been identified by Network Rail as a route where electrification in conjunction with extension of electrification from Ormskirk to Preston and reinstatement of the Burscough Curves would enable new patterns of passenger service to operate.[84] In March 2015 the Electrification Task force placed the electrifying of the line from Southport to Salford Crescent via Wigan in the Tier 1 priority category.[85][86]

Ellesmere Port to Helsby[]

Helsby interchange station. The line to the right is to Ellesmere Port, the line to the left is to Chester.

Helsby is an interchange station on the Chester to Warrington Bank Quay and Ellesmere Port to Helsby lines. West Coast Main Line services stop at Warrington. Merging the line from Ellesmere Port to Helsby into Merseyrail would create a Liverpool to Helsby service, giving a smooth interchange from Merseyrail to all stations on the Chester to Warrington line. The Ellesmere Port to Helsby route is included in Merseytravel's rail strategy as a "long-term aspiration".[61][83] Third rail battery electric train trials were undertaken in 2020 by Merseyrail on this section of track using the new Class 777 trains. The results may indicate that the network can be expanded to Helsby without further electrification.[80]

Other battery electric extensions[]

Runcorn East station.

Liverpool City Region metro-mayor Steve Rotheram, stated that the City Region is planning to extend the network "so it reaches communities right across our city region and beyond". The Liverpool City Region map displays desired extensions of Merseyrail includes a Chester to Runcorn East line. This line would operate on a section of the Chester to Warrington Bank Quay line, incorporating the Helsby interchange station.[99]

Reopening[]

Burscough Curves[]

The Burscough Curves were short chords linking the Ormskirk to Preston Line with the Manchester to Southport Line. The curves allowed northbound trains from Ormskirk to run directly to Southport to the west, and southbound trains from Preston to run west to Southport. The last regular passenger trains ran over the curves in 1962; the tracks were subsequently lifted. The reinstatement of the Burscough Curves would allow direct Preston-Southport & Ormskirk-Southport services providing an option of an alternative Liverpool-Southport route via Ormskirk. Network Rail has recommended that a strategy for the Burscough Curves be developed further.[84][89]

In a parliamentary debate on 27 April 2011, the Burscough Curves were a prime point of the debate. The transport minister wished to meet former Southport MP John Pugh regarding the reinstatement of the curves.[100] The latest refresh of Merseytravel's Long Term Strategy puts the opening of the curves in Network Rail's CP7 period.[101]

The new Class 777 Merseyrail trains have been tested for battery electric operation, with the prospect of using them on the Burscough Curves open to review.[102] Battery train introduction on the Merseyrail network may improve the business case to reopen the Burscough Curves, allowing Northern Line trains to travel from Ormskirk to Southport, giving two routes from Liverpool to Southport. If realised Burscough Junction, Burscough Bridge, New Lane, Bescar Lane and Meols Cop stations may be incorporated into Merseyrail.[80]

Edge Hill to Bootle[]

Liverpool2 Container terminal extension, which is served by the Bootle Branch line.

Known as either the Canada Dock Branch line or the Bootle Branch line[103] is an unelectrified line running from Edge Hill Junction in the east of the city in a long curve to the container terminal to the north of the city. The line's last passenger trains were withdrawn in 1977. Being the only line currently into Liverpool docks, freight to Seaforth Container Terminal ensures constant use.[104] The line has been mooted on many occasions for electrifying and reopening to passengers, giving scope to reopen stations along its length: Spellow, Walton & Anfield, Breck Road, Tuebrook, Stanley and Edge Lane.[61]

Network Rail investigated options for the Canada Dock Branch in its March 2009 Route Utilisation Strategy for Merseyside[105] and concluded that the expected benefits did not justify the investment in new infrastructure.

The Department for Transport's Rail electrification document of July 2009 stated that the route to Liverpool Docks would be electrified via overhead wires. The Canada Dock Branch Line is the only line into the docks.[104] From the document:

70. Electrification of this route will offer electric haulage options for freight.
There will be an alternative route to Liverpool docks for electrically-operated freight trains, and better opportunities of electrified access to the proposed freight terminal at Parkside near Newton-le-Willows.

The document states "route to Liverpool docks for electrically-operated freight trains", which is the Bootle Branch line being the only line into Liverpool docks. However, the initial phases of electrification scheduled until 2016 do not list this line.[106] This delay may impede the efficiency of Liverpool docks container terminal which is being extended to accommodate the largest post-Panamax container ships increasing container throughput of the terminal by 25%, entailing increased usage of the line. Local residents are campaigning to have the majority of containers to be transported by rail easing road congestion and pollution, which may increase rail traffic even further.[107] This delay in electrification may delay any proposed passenger use for the line.

The Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, page 37, states:

A long term proposal which will need to be considered alongside the developing freight strategy for the region and the expansion of the Port of Liverpool. The proposal envisages the introduction of passenger services which will operate from the Bootle Branch into Lime Street. An initial study is required to understand fully the freight requirements for the line and what the realistic potential for operating passenger services over the line is.[80]

It was announced in December 2019 that Liverpool City Council had commissioned a feasibility study to see about reopening the Canada Dock Branch to passenger traffic.[108]

North Mersey Branch[]

The North Mersey Branch from Bootle to Aintree is currently used only by engineering trains to gain access to Merseyrail tracks; however, Merseytravel has long-term goals to reopen and electrify the line.[61][83] The line was considered in the Merseyside Route Utilisation Strategy document, concluding that reopening could not yet be recommended. However, the Route Utilisation Strategy document went on to state:

The possibility of running passenger trains along the North Mersey and Bootle branches was examined by the RUS and cannot yet be recommended. However, future development and regeneration could lead to increased demand for such services. Any such passenger services would need to be implemented in a way that ensures current and future freight demand can be accommodated. There is also a possibility in the longer term of using other infrastructure, including the disused Wapping and Waterloo tunnels, to provide new journey opportunities.[105]

Skelmersdale Branch[]

The original now demolished Skelmersdale staion. The track was lifted in 1963.

A number of proposals over the years have been put forward to connect Skelmersdale to the Merseyrail network.

In June 2009, the Association of Train Operating Companies, in its Connecting Communities: Expanding Access to the Rail Network report, called for funding for the reopening of the line from Ormskirk to Skelmersdale as part of a £500m scheme to open 33 stations on 14 lines closed in the Beeching Axe, including seven new parkway stations.[109][110] The report proposes extending the line from Ormskirk railway station by laying 3 miles of new single track along the previous route towards Rainford Junction, at a cost estimated to be in the region of £31m. The route is largely intact, however, a slight deviation north of Westhead where houses have been built on the old trackbed would be required. The proposed station would be on the north-west corner of the town near the Skelmersdale Ring Road, next to where the old station once stood.[110][111]

In December 2012 Merseytravel commissioned Network Rail to study route options and costs of connecting to Skelmersdale with Merseytravel contributing £50,000 and West Lancashire Council contributing £100,000.[112] The range of options considered including a simple park and ride on the existing Northern Line Kirkby branch, an extension of the Northern Line Kirkby branch to a new terminus in Skelmersdale and finally a connection from the Northern Line Ormskirk branch, possibly extended to create a loop via Skelmersdale between Kirkby and Ormskirk. Merseytravel were represented on a board led by Lancashire County Council who developed a flowchart detailing how the scheme may be delivered.[113]

In 2014 the reopening of a section of the Skelmersdale Branch from Upholland to Skelmersdale town centre was proposed.[61] The line was completely closed in 1963. This would give Skelmersdale, the second largest town in North West England without a railway service, direct access to Liverpool city centre. Network Rail recommended a further feasibility study be carried out.[105][114]

In January 2017 Lancashire County Council announced that the preferred site for the railway terminal station was the former Glenburn Sports College and Skelmersdale College's West Bank Campus. Whilst the council owns the land that Glenburn Sports College occupies, the currently unused West Bank Campus site is owned by Newcastle College and the council have started the process of acquiring this land. A partnership formed between the council, Merseytravel and West Lancashire Borough Council hope to deliver a service of two trains an hour to Liverpool from Skelmersdale.[115] Network Rail expect the construction of the project to start in 2021 with the station being ready in 2023.[116] An October 2014 plan envisaged the station also providing services to Wigan.[117]

On page 36 of the Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, it stated that Merseytravel was working with Lancashire County Council and Network Rail to develop a plan to extend the Merseyrail network from Kirkby through to Skelmersdale, with work due for completion in 2019. They considering 3rd rail electrification and other alternatives incorporating a new station at Headbolt Lane to serve the Northwood area of Kirkby.[80]

The government in April 2020 gave assurances that the Skelemersdale link would be constructed.[118]

Outer Rail Loop[]

West Derby station on the North Liverpool Extension Line which was to be a part of Merseyrail's Outer Loop.

The Orbital Outer Rail Loop was a part of the initial Merseyrail plans of the 1970s. The route circled the outer fringes of the city of Liverpool using primarily existing rail lines merged to create the loop. Liverpool city has a semi-circular footprint with the city centre at the western fringe against the River Mersey. The western section of the loop would parallel the river running through the city centre. The scheme was started along with the creation of Merseyrail however postponed due to cost cutting, with only the western section of the loop completed being a part of the current Northern Line.

The concept of using the former Cheshire Lines Committee's North Liverpool Extension Line[119] route through the eastern suburbs of Liverpool as the eastern section of a rapid-transit orbital route circling the outskirts of the city first emerged before the Second World War. The proposal was for a 'belt' line using the now demolished Liverpool Overhead Railway, which ran along the river front, as its western section. In the 1960s during the planning for Merseyrail, this was developed into the Outer Rail Loop scheme - an electric rapid-transit passenger line circling the outer districts of the city by using a combination of newly electrified existing lines and a new link tunnel under the city centre merging lines to the north and south of the city centre completing the loop.

A feature was that passengers on the mainline radial routes into Lime Street from the east and south could transfer onto the Outer Loop at two parkway interchange stations completing their journey to Liverpool suburbs avoiding the need to travel into the city centre, which would also relieve pressure on Lime Street station. Liverpool South Parkway was one of these stations opening thirty years after the initial proposal. The Outer Loop would have connected the eastern suburbs of the city: Gateacre, Childwall, Broad Green, Knotty Ash, West Derby, Clubmoor and Walton with the city centre.[55]

As finally developed, the Outer Loop consisted of two sub-loops - a loop serving the northern suburbs and one the southern suburbs with both running through to the city centre from the east. The sub-loops allowed more direct journeys into the city centre from the eastern suburbs giving the overall scheme greater viability.

The eastern section of the Outer Rail Loop project was cancelled in the late 1970s because of delays and cost overruns on the Loop (Wirral Line) and Link (Northern Line) projects and local political opposition. Only the western section of the loop was built. The project was abandoned as a working proposal by Merseytravel in the 1980s. Much expense was incurred in constructing a large bridge taking the M62 over the eastern section and the construction of header tunnels south of Liverpool Central station. The route is still largely intact, complete with bridges, although now the eastern section mainly forms the Liverpool Loop Country Park - a walking and cycling trail through the suburbs.

The key components of the Loop were as follows:

The West Section - The existing Merseyrail Electrics Northern Line from Sandhills in the north (later Aintree on the Ormskirk branch) to Hunts Cross. This section includes the most expensive part of the Outer Rail Loop - the Link Line tunnel under Liverpool city centre - and the reopened and electrified line from Liverpool Central to Hunts Cross.

The East Section - The former Cheshire Lines Committee North Liverpool Extension Line initially from Hunts Cross to Walton however amended to Aintree. This is now the Country Park.

The North Section - Originally the Cheshire Lines Committee line from Walton to Kirkdale via the Breeze Hill tunnel. In later versions of the scheme the North Mersey Branch from Aintree to Bootle was substituted. The latter is still intact although only used by maintenance trains whilst the former is now partially built over.

The Central Section - The central section from Central station to Broad Green in the east of the city, was a later addition to the plan effectively dividing the loop into two sub-loops, one north, one south. City centre access for the towns east of the Liverpool City Region was provided. This included the unrealised Edge Hill Spur scheme from Liverpool Central underground station to Edge Hill using the Waterloo Tunnel and a section of the City Line from Edge Hill to Broad Green. A major junction was to have been formed with the eastern section of the Outer Loop with a six platform underground station to be named Rocket under the car park of the Rocket pub near the M62/Queens Drive road junction.

The Outer Rail Loop would have been double track throughout, using the electrified 750 V DC third-rail system of the Merseyrail Electrics network.

Although no official proposals have been made to revive the scheme in recent years, the route is effectively safeguarded with periodic calls being made by local politicians for the revival of the complete project or just the short stretch of route from Hunts Cross to Gateacre. The Gateacre service was the last to operate out of the former Liverpool Central High Level Station prior to its closure in 1972.

Since the postponement of the project, a number of Route Utilisation Strategy documents have mentioned reopening the North Mersey Branch line, the northern section of the loop, to form a passenger link between Bootle and Aintree with stations to serve Ford and Girobank.[55][120]

Edge Hill Spur (reusing tunnels)[]

Victoria/Waterloo Tunnel portal at Edge Hill Station. The tunnel is an option for the Edge Hill Spur scheme.

In the 1960s/early 1970s the Edge Hill Spur scheme was proposed, to link the east of the city with the central underground section. It would have extended the Merseyrail underground network from Liverpool Central Station to Edge Hill Station using existing freight tunnels. Although part of the original Merseyrail plan with construction started, the scheme was dropped. A junction and two headers tunnels to facilitate future construction of the Spur, were built south of Central station during the construction of the Northern Line tunnel, which is a Liverpool north-south crossrail line.[121]

The construction of the Spur would have connected the City Line branches to the east of Liverpool into the electrified Merseyrail network and importantly the underground section in Liverpool's city centre. An increase in integration and connectivity of the network would have been achieved. The Spur would have also formed the central section of the proposed Outer Rail Loop splitting the loop into two smaller loops (see Outer Loop section). An additional and substantial benefit was diverting local urban trains entering the city from the east underground in the city centre. This would release platform space at Lime Street mainline terminus station for the use of only mid and long-haul mainline routes.

The initial and cheaper proposal was to re-use the 1829 Wapping freight tunnel, by means of two new single-track tunnels branched off the Northern Line tunnel at a new junction named Liverpool Central South Junction, south of Central Station. The Wapping Tunnel would have given access to Edge Hill via the historic Cavendish cutting, built for the 1830 Liverpool and Manchester Railway. Access to the City Line would have been obtained via a flyover to the east of Edge Hill Station over the main lines from Lime Street. This flyover has since been demolished.

In the early 1970s, Liverpool City Council planners proposed an alternative scheme, which was subsequently adopted. This revised route would permit a new underground station to be constructed to serve Liverpool University, behind the Student's Union building in Mount Pleasant. It would extend the two connecting tunnels from Central Station in a large radius curve to the north, passing beneath the mainline Lime Street station approach cutting accessing Edge Hill via a section of the Waterloo/Victoria Tunnel. On emerging from this tunnel at the existing Edge Hill Station, the route would be on the north side of the main lines thereby removing the need for a flyover.[55]

Although powers were obtained to build this line under the 1975 Merseyside Metropolitan Railway Act, construction was postponed due to the financial cutbacks and political opposition that also halted the Outer Rail Loop project. The east of Liverpool has suffered in many aspects ever since. An attempt was made to revive the project in the mid-1980s but it was found to be not financially viable.

Following the collapse of the Merseytram scheme in 2006, proposals were considered to revive the project, with the route of the tunnels currently safeguarded.[122] Further references are made to the scheme, as a future option, in MerseyTravel's 30-year plan.[61]

A further proposal to resurrect the Edge Hill spur scheme with a new station at Paddington Village was revealed in 2016 by the then Liverpool mayor Joe Anderson, as part of a scheme to extend Liverpool's Knowledge Quarter onto the site of the former Archbishop Blanche School.[123] A feasibility study to reopen the Wapping Tunnel was commissioned and delivered in May 2016. The report found that the Wapping Tunnel was in good condition though suffered from flooding in places and would require some remedial work, but that the concept of reopening the tunnel was viable.[56]

See also[]

References[]

  1. ^ Jump up to: a b "Merseyrail A brief history" (PDF). Merseytravel. Retrieved 27 November 2015.
  2. ^ "Merseytravel Facts and Figures". Merseytravel. Archived from the original on 6 January 2021. Retrieved 5 July 2016.
  3. ^ "Merseyrail performance" (PDF). Merseyrail. Retrieved 12 October 2015.
  4. ^ "Merseyrail at Serco". Serco. Retrieved 21 July 2009.
  5. ^ "Passenger-rail-usage-2015-16-q4 | Office of Rail and Road" (PDF). Archived (PDF) from the original on 15 December 2016. Retrieved 18 May 2018.
  6. ^ "Merseyrail". Merseytravel. Archived from the original on 9 June 2019. Retrieved 26 March 2018.
  7. ^ "Abellio Group Head Office" Group corporate website, Abellio, Utrecht, Netherlands, Undate Archived 15 October 2019 at the Wayback Machine. Retrieved 19 June 2015.
  8. ^ "Merseyrail corporate information | Merseyrail Electrics | Serco | Abellio". Merseyrail. 20 July 2003. Retrieved 5 February 2015.
  9. ^ "MetroCard and Walrus".
  10. ^ "Northern Rail Electric". Northern Rail. Archived from the original on 10 June 2015. Retrieved 10 June 2015.
  11. ^ Jump up to: a b "Electrifying Liverpool-Manchester". The Rail Engineer. Ashby-de-la-Zouch. 28 November 2012.
  12. ^ Jump up to: a b c d e "Merseyrail Trains History". Merseyrail. Archived from the original on 8 September 2008. Retrieved 20 July 2009.
  13. ^ "Archived copy" (PDF). Archived (PDF) from the original on 6 January 2021. Retrieved 6 February 2020.CS1 maint: archived copy as title (link)
  14. ^ "Archived copy" (PDF). Archived (PDF) from the original on 6 January 2021. Retrieved 6 February 2020.CS1 maint: archived copy as title (link)
  15. ^ "Archived copy" (PDF). Archived (PDF) from the original on 6 January 2021. Retrieved 6 February 2020.CS1 maint: archived copy as title (link)
  16. ^ "Merseyrail Northern Line". Merseyrail. Archived from the original on 6 January 2021. Retrieved 28 August 2018.
  17. ^ "Merseyrail Wirral Line". Merseyrail. Archived from the original on 6 January 2021. Retrieved 28 August 2018.
  18. ^ "Merseyrail City Line". Merseyrail. Archived from the original on 6 January 2021. Retrieved 28 August 2018.
  19. ^ DVV Media Group GmbH. "Merseyrail train refurbishment". Railway Gazette. Retrieved 5 February 2015.
  20. ^ "Class 503, a brief history". Andrew Phillips. Archived from the original on 5 February 2016. Retrieved 8 June 2015.
  21. ^ Maund 2009, p. 214
  22. ^ Jump up to: a b c "Merseyrail Class 777 arrives in Liverpool". Archived from the original on 6 January 2021. Retrieved 4 February 2020.
  23. ^ O'Dowd, Emily. "Stadler signs £700 million deal to replace the UK's oldest fleet on Liverpool's Merseytravel line". smartrailworld.com. Archived from the original on 6 January 2021. Retrieved 4 November 2018.
  24. ^ "Battery trial planned for new EMU fleet". Archived from the original on 6 January 2021. Retrieved 4 February 2020.
  25. ^ "'Why I am striking': Train guards write open letter to all passengers". Liverpool Echo. 4 October 2017. Archived from the original on 6 January 2021. Retrieved 28 January 2020.
  26. ^ "All Merseyrail strikes suspended as union hails 'major breakthrough' that could finally end dispute". Liverpool Echo. Archived from the original on 6 January 2021. Retrieved 28 January 2020.
  27. ^ "Merseytravel and Stadler sign new fleet deal, but legal challenge remains". Rail Technology Magazine. 16 February 2017. Archived from the original on 6 January 2021. Retrieved 16 February 2017.
  28. ^ "Construction begins on Kirkdale depot to maintain new Merseyrail fleet". Rail Technology Magazine. 28 September 2017. Archived from the original on 6 January 2021. Retrieved 25 December 2017.
  29. ^ "Initial tests of battery-powered Stadler IPEMU for Merseyrail complete". International Railway Journal. 17 June 2021. Retrieved 7 July 2021.
  30. ^ Jump up to: a b McDonough, Tony (15 July 2021). "Battery breakthrough will see Merseyrail network extended". Liverpool Business News. Retrieved 15 July 2021.
  31. ^ "Stadler signs contract to build and maintain 52 METRO trains for Liverpool City Region". Stadler Rail. 16 February 2017. Retrieved 15 January 2019.
  32. ^ "Archived copy". Archived from the original on 6 January 2021. Retrieved 6 July 2020.CS1 maint: archived copy as title (link)
  33. ^ "Route O - Merseyside" (PDF). Network Rail. 30 March 2010. p. 10. Retrieved 30 May 2011.
  34. ^ "Network Rail 2009 Strategic Business Plan - Merseyrail Route 21" (PDF). Network Rail. 2009. Retrieved 25 July 2009.
  35. ^ https://web.archive.org/web/20171107021632/http://moderngov.merseytravel.uk.net/documents/s21686/Enc.%201%20for%20Updated%20Long%20term%20Rail%20Strategy.pdf
  36. ^ Jump up to: a b House of Common Briefing Paper SN6521 Railways: franchising policy, 30 September 2015, Louise Butcher
  37. ^ http://www.legislation.gov.uk/uksi/2002/1946/article/4/made Merseyrail Electrics Network Order 2002
  38. ^ "Andy Heath appointed new managing director of Merseyrail". Merseyrail. Merseyrail. Archived from the original on 6 January 2021. Retrieved 11 August 2018.
  39. ^ Hodgson, Neil (4 December 2007). "We have taken the 'misery' out of Merseyrail". Liverpool Echo.
  40. ^ Hodgson, Neil (14 December 2007). "Merseyrail trains in first place". Liverpool Echo.
  41. ^ "Performance by train operator". Network Rail. Archived from the original on 8 December 2015. Retrieved 26 December 2012.
  42. ^ Weston, Alan (11 February 2010). "Merseyrail trains are most reliable in the UK". Liverpool Echo. Retrieved 22 March 2010.
  43. ^ Turner, Alex (27 October 2010). "Merseyrail profits gather speed to reach record levels". Liverpool Daily Post. Retrieved 26 December 2010.
  44. ^ Turnbull, Barry (27 April 2009). "Merseyrail in record profits surge". Liverpool Daily Post. Retrieved 21 July 2009.
  45. ^ "Culture year is a boon for Merseyrail". Liverpool Daily Post. 10 September 2008. Retrieved 21 July 2009.
  46. ^ Neild, Larry (5 September 2007). "Merseyrail takes 840 to court over feet on seats". Liverpool Daily Post. Archived from the original on 6 March 2012.
  47. ^ Neild, Larry (11 September 2007). "Is Merseyrail's feet on seats policy too harsh?". Liverpool Daily Post.
  48. ^ "Merseyrail - train times & timetables, journey planner & service updates". merseyrail.org.
  49. ^ "Liverpool Merseyrail". UrbanRail. Archived from the original on 6 August 2020. Retrieved 21 July 2009.
  50. ^ "Birkenhead Monks Ferry". Disused Station. Retrieved 21 July 2009.
  51. ^ "Merseyside Area land use Transportation study (MALTS) project report. | The National Archives". Discovery.nationalarchives.gov.uk. Archived from the original on 6 January 2021. Retrieved 23 July 2016.
  52. ^ "Liverpool City Centre Plan - City Centre Planning Group, 1965"
  53. ^ "Disused Stations: Meols Cop Triangle & Electric Car Sheds".
  54. ^ Jump up to: a b Couch, Chris (2003). City of change and challenge: urban planning and regeneration in Liverpool. Aldershot: Ashgate. ISBN 978-1-84014-857-2
  55. ^ Jump up to: a b c d e f g h Maund, T.B. (2001). Merseyrail electrics: the inside story. Sheffield: NBC Books. OCLC 655126526.
  56. ^ Jump up to: a b "Archived copy" (PDF). Archived from the original (PDF) on 3 March 2018. Retrieved 3 March 2018.CS1 maint: archived copy as title (link)
  57. ^ "OPSI Statutory Instrument 2003 No. 1696". OPSI. Retrieved 21 July 2009.
  58. ^ "Liverpool Central High Level". Disused Station. Retrieved 21 July 2009.
  59. ^ "Planning approval granted for new Maghull North station scheme". Merseytravel. Archived from the original on 6 January 2021. Retrieved 19 February 2017.
  60. ^ "Liverpool City Region Long Term Rail Strategy" (PDF). Merseytravel. Archived from the original (PDF) on 7 September 2014. Retrieved 7 September 2014.
  61. ^ Jump up to: a b c d e f g h Shennan, Paddy (28 August 2014). "Merseytravel plan to open or reopen host of new stations". Liverpool Echo. Retrieved 30 August 2014.
  62. ^ Network Rail Strategic Development Plan for Merseyrail 2009-2014.
  63. ^ "Battery-powered trains part of Merseyrail expansion plan". BBC News. 15 July 2021.
  64. ^ https://www.networkrail.co.uk/wp-content/uploads/2020/10/Liverpool-City-Region-Strategic-Rail-Study-2020.pdf
  65. ^ Jump up to: a b Tyrrell, Nick (30 August 2019). "Merseyside set to get two new train stations and replacement ferries". Liverpool Echo. Retrieved 31 August 2019.
  66. ^ Boost for Liverpool’s Baltic Triangle area as a further £1.5m invested by Combined Authority in new railway station scheme Liverpool City Region
  67. ^ New Merseyrail train station plans for Liverpool city centre given huge boost Archived 6 January 2021 at the Wayback Machine Liverpool Echo
  68. ^ New Baltic Triangle station moves closer to reality Archived 6 January 2021 at the Wayback Machine Liverpool Business News Daily
  69. ^ City approves Baltic masterplan including new station Liverpool Business News Daily
  70. ^ Baltic Triangle’s Masterplan gets city council approval Archived 6 January 2021 at the Wayback Machine Liverpool Baltic Triangle
  71. ^ Final Prioritised Major Funding Applications Archived 2 April 2015 at the Wayback Machine Merseytravel
  72. ^ Cite error: The named reference Echo - plans approved was invoked but never defined (see the help page).
  73. ^ Jump up to: a b Houghton, Alistair (16 December 2016). "Merseytravel reveals new £460m train fleet plans - with no train guards". Liverpool Echo. Archived from the original on 14 March 2017. Retrieved 27 December 2020.
  74. ^ "Kirkby Headbolt Lane station scheme moves a step closer with £3.3m funding secured and CGI images are unveiled | Liverpool City Region Combined Authority - News". 16 July 2020.
  75. ^ https://planapp.knowsley.gov.uk/online-applications/applicationDetails.do?keyVal=QVTOMEIX0MW00&activeTab=summary
  76. ^ "Battery breakthrough will see Merseyrail network extended". 21 July 2021.
  77. ^ http://www.merseytravel.gov.uk/Site%20Documents/LCR%20LTRS_Strategy%20Summary_01_08_14_Final%20Issue%20(6)_MTravel.pdf
  78. ^ Jump up to: a b Schofield, Ben (3 August 2009). "Tram link bid for Liverpool airport". Liverpool Daily Post. Archived from the original on 6 April 2012. Retrieved 20 August 2009.
  79. ^ "Liverpool Airport Rail Links Feasibility Study" (PDF). Merseytravel. Archived from the original (PDF) on 4 March 2018. Retrieved 4 March 2018.
  80. ^ Jump up to: a b c d e f g h "Archived copy" (PDF). Archived from the original (PDF) on 7 November 2017. Retrieved 17 May 2018.CS1 maint: archived copy as title (link)
  81. ^ "Archived copy". Archived from the original on 6 January 2021. Retrieved 15 January 2019.CS1 maint: archived copy as title (link)
  82. ^ Jump up to: a b "New Trains". www.merseyrail.org.
  83. ^ Jump up to: a b c d "Welcome to the TravelWise Merseyside website" (PDF). transportmerseyside.org.[permanent dead link]
  84. ^ Jump up to: a b c d e "Network RUS Electrification" (PDF). October 2009. Archived from the original (PDF) on 12 October 2014. Retrieved 20 October 2013.
  85. ^ Jump up to: a b c Rudgard, Olivia (5 March 2015). "Two Merseyside lines prioritised for electrification". Liverpool Echo. Retrieved 27 November 2015.
  86. ^ Jump up to: a b "Place North West - Priority electrification routes sent to Government". 6 March 2015. Archived from the original on 6 January 2021. Retrieved 12 January 2017.
  87. ^ Jump up to: a b "Battery breakthrough will see Merseyrail network extended". 15 July 2021.
  88. ^ Lopez, Jamie (8 December 2020). "Government expects to receive Skelmersdale plan in 2021 | InYourArea". InYourArea. Retrieved 8 March 2021.
  89. ^ Jump up to: a b Lancashire and Cumbria Route Utilisation Strategy Archived 7 June 2011 at the Wayback Machine, Network Rail.
  90. ^ "Merseytravel fury over £207m price tag for Bidston-Wrexham rail link". Wirral News. Liverpool. 5 November 2008. Archived from the original on 8 January 2009.
  91. ^ "The Wrexham to Bidston railway (The Borderlands line): Electrification plans". Penfmorfa. Archived from the original on 6 January 2021. Retrieved 17 February 2007.
  92. ^ Hughes, Ian (25 October 2012). "Progress on Liverpool-North Wales rail link". North Wales Weekly News. Conwy.
  93. ^ "Loop line renewal is 'short-term pain worth long-term gain of rail boost' writes MerseyTravel chief". Wirral Globe. Archived from the original on 6 January 2021. Retrieved 1 December 2016.
  94. ^ Jump up to: a b "Long-term planning – Network Rail". www.networkrail.co.uk. Archived from the original on 4 November 2018. Retrieved 4 November 2018.
  95. ^ "Transport for Wales announces Wales and Borders preferred bidder". www.keolisamey.cymru. Archived from the original on 6 January 2021. Retrieved 11 June 2018.
  96. ^ "Vivarail to supply hybrid D-Train fleet in first train deal for new Wales franchise". www.railtechnologymagazine.com. Archived from the original on 6 January 2021. Retrieved 11 June 2018.
  97. ^ "Archived copy". Archived from the original on 6 January 2021. Retrieved 15 January 2019.CS1 maint: archived copy as title (link)
  98. ^ Hughes, Owen (10 June 2018). "This is what the new rail franchise will mean for North Wales train passengers". northwales. Archived from the original on 6 January 2021. Retrieved 11 June 2018.
  99. ^ "Battery-powered trains part of Merseyrail expansion plan". 15 July 2021 – via www.bbc.co.uk.
  100. ^ Transport debate in Parliament 27 April 2011[permanent dead link], House of Commons.
  101. ^ "Merseytravel Committee Rail Development And Delivery" (PDF). Merseytravel. Archived from the original (PDF) on 20 December 2016. Retrieved 6 December 2016.
  102. ^ "Liverpool City Region Combined Authority, Long Term Rail Strategy" (PDF). October 2017. p. 40. Archived from the original (PDF) on 22 December 2018. Retrieved 21 December 2018.
  103. ^ "Disused Stations: Canada Dock Station". subbrit.org.uk. Archived from the original on 6 January 2021. Retrieved 23 September 2005.
  104. ^ Jump up to: a b Rail Electrification Document, Department for Transport.
  105. ^ Jump up to: a b c Merseyside Route Utilisation Strategy Archived 7 April 2009 at the Wayback Machine. Network Rail.
  106. ^ "Balfour Beatty wins second phase electrification contract in UK". Railway Technology. Retrieved 5 February 2015.
  107. ^ Johnson, Mark (15 November 2011). "Liverpool £210m River Mersey terminal to go ahead after dredging permission given". Liverpool Daily Post. Archived from the original on 26 February 2012. Retrieved 1 January 2019.
  108. ^ Tyrrell, Nick (17 December 2019). "Work starts to figure out if Anfield train station could be built". Liverpool Echo. Archived from the original on 6 January 2021. Retrieved 22 December 2019.
  109. ^ "Operators call for new rail lines". BBC News. 15 June 2009. Archived from the original on 16 June 2009. Retrieved 15 June 2009.
  110. ^ Jump up to: a b "Connecting Communities – Expanding Access to the Rail Network" (PDF). London: Association of Train Operating Companies. June 2009. Retrieved 7 September 2018.
  111. ^ "Skelmersdale Station". Disused Stations. Archived from the original on 6 January 2021. Retrieved 5 February 2015.
  112. ^ "Skelmersdale Rail Link" (PDF). Merseytravel. Archived from the original (PDF) on 8 December 2015. Retrieved 27 November 2015.
  113. ^ "Agenda item - Rail Schemes Development and Delivery". Merseytravel. 3 November 2016. Archived from the original on 2 December 2016. Retrieved 1 December 2016.
  114. ^ "The Railway". Skemheritage.org.uk. Retrieved 5 February 2015.
  115. ^ "Preferred site for Skelmersdale's first railway station revealed". BBC News. 2 February 2017. Retrieved 2 February 2017.
  116. ^ "Skelmersdale link moves towards GRIP3". www.railmagazine.com. Archived from the original on 6 January 2021. Retrieved 3 February 2017.
  117. ^ "Archived copy" (PDF). Archived (PDF) from the original on 6 January 2021. Retrieved 3 February 2017.CS1 maint: archived copy as title (link)
  118. ^ Lopez, Jamie (10 April 2020). "Government boost to reopen Skelmersdale rail link". LancsLive.
  119. ^ Cheshire Lines Committee Lines: North Liverpool Extension Line, Southport and Cheshire Lines Extension Railway, Garston and Liverpool Railway (ISBN 1158356277)
  120. ^ [1][dead link]
  121. ^ "Eighth wonder". www.railengineer.uk. 21 October 2016. Retrieved 4 November 2018.
  122. ^ Coligan, Nick (17 July 2006). "The trams are dead, long live the train". Liverpool Echo. Archived from the original on 6 January 2021. Retrieved 10 September 2008.
  123. ^ Neild, Larry (13 June 2016). "REVEALED: Liverpool set to get its own Paddington station". Liverpool Confidential. Archived from the original on 6 January 2021. Retrieved 23 July 2016.

Sources[]

  • Maund, T.B. (2009). The Wirral Railway and its Predecessors. Gloucestershire: Lightmoor Press. ISBN 978-1-899-88938-9. OCLC 604772937.

Further reading[]

  • Hilbert, Martyn (2016). Merseyrail Electric. Fonthill Media. ISBN 9781781555132.
  • Maund, T.B. (2001). Merseyrail Electrics: The Inside Story. NBC Books. ASIN B0047EA3HU. OCLC 655126526.
  • Merseyside Passenger Transport Executive (1978). The Story of Merseyrail. Merseyside Passenger Transport Executive. ASIN B000MAYEK0. OCLC 8740619.
  • Rapson, David (August 1983). "The Mersey beat". Rail Enthusiast. EMAP National Publications. pp. 26–31. ISSN 0262-561X. OCLC 49957965.

External links[]

Media related to Merseyrail at Wikimedia Commons

Preceded by
Arriva Trains Merseyside
Operator of Merseyrail franchise
2003–2028
Incumbent
Retrieved from ""