Mândra Solar Park

From Wikipedia, the free encyclopedia
Mândra Solar Park
CountryRomania
LocationMândra
Coordinates45°49′20″N 25°02′48″E / 45.82222°N 25.04667°E / 45.82222; 25.04667Coordinates: 45°49′20″N 25°02′48″E / 45.82222°N 25.04667°E / 45.82222; 25.04667
StatusUnder construction
Commission date2014 (expected)
Construction cost€50 million
Solar farm
TypeFlat-panel PV
Power generation
Units operational160,000
Nameplate capacity38 MW
Annual net output50 GWh

Mândra Solar Park is a large thin-film photovoltaic (PV) power system, currently under construction on an 84 hectares (210 acres) plot of land near the Mândra commune, Braşov County in Romania. The solar park will be a 38-megawatt solar power system using 160,000 state-of-the-art thin film solar panels, and should be finished by the end of 2014.[1] The solar park is expected to supply 50 GWh of electricity per year.[1]

The investment cost for the Mândra solar park amounts to some €50 million.[1]

See also[]

References[]

  1. ^ a b c "50 mil. euro investiți în energie verde" (in Romanian). transilvaniabusiness.ro. 2014-01-08. Retrieved 2014-01-15.
Retrieved from ""