M4 motorway (Hungary)

From Wikipedia, the free encyclopedia
M4 motorway shield
M4 motorway
M4-es autópálya
Route information
Part of E60 / E79
Length101 km (63 mi)
223 km (139 mi) planned
Major junctions
From M0 in Budapest
Major intersections M8 near Szolnok
M35 near Berettyóújfalu
To A3 at Nagykereki
Location
CountiesPest, Jász-Nagykun-Szolnok, Hajdú-Bihar
Major citiesBudapest, Szolnok, Püspökladány
Highway system
  • Roads in Hungary

The M4 motorway is a Hungarian motorway, which will, upon completion, connect Budapest to Oradea and further Romanian cities. The route will travel in Hungary through Cegléd, Szolnok, Karcag, Püspökladány, Berettyóújfalu, and Nagykereki before reaching the Romanian border.

History, plans and ongoing construction[]

The road's origins can be traced much further back in time - as far back as 1974, when the first section of the future motorway was opened. This section, from Albertirsa to Cegléd, served to bypass the older, congested Route 40, that passed through these towns. This was extended in 2005 to bypass Abony and Szolnok. The same year, the Törökszentmiklós bypass opened. On 6 July 2011, a bypass also opened at Kisújszállás. Most of these sections are only 1 lane per direction.

This route soon became congested, and the section going south of Szolnok was found to be unsuitable to upgrade to motorway status, so on 16 September 2013, a contract was signed regarding the new route of the motorway. This route would go northwards of Szolnok, crossing the Tisza rivers, and shortening the route of the motorway. Work will be done by Strabag, and the contract cost 10 billion Hungarian Forints. Since the motorway passes through an environmental area, protective fencing is to be installed on the new sections from Üllő towards Törökszentmiklós. Whilst this section was supposed to open by 2016, construction work was stopped on 30 June 2015, to investigate the companies who were building the road. Apparently, the project was submitted to the EU to be supported in 2013, but it never received approval. There was also the huge cost of the route - 4 Billion HUF per kilometer. The work on this section has restarted with a planned completion date of early 2022.

The M0-M4 interchange seen from the air, 20 June 2006. Notice the then-under construction section of the M0.

Preparatory work has started for the Törökszentmiklós-Kisújszállás-Karcag-Püspökladány-Berettyóújfalu section. This section envisaged an interchange with the M8 motorway, but the procurement procedure was abolished on 26 February 2014, leaving work halted on this section.

Sections finished or to be completed in 2020[]

The 10 km long Vecsés-Üllő bypass opened in 2004, completed up to motorway standards. This also helped to ease access into the Liszt Ferenc International Airport. However, this has left a gap between Albertirsa and Üllő, and the old road going through Monor soon became a bottleneck. This 29 kilometer long section of M4 was completed on February 7, 2020. In 2019, a section near Cegléd section was upgraded to a dual carriageway but so far it lacks the motorway status. An upgrade to that status is planned when the section between Cegléd and Abony is completed in the summer of 2020.

A 4-kilometer stretch of M4, near Berettyóújfalu, was inaugurated on December 20, 2018. This section serves to link the M35 motorway to Route 47.[1]

The M4 as seen heading towards the Romanian border, near Derecske, 27 December 2018

Works also started in 2016 on the Berettyóújfalu-Nagykereki section, which will connect to the Romanian A3 motorway, towards Oradea, Cluj, Târgu Mureș and Bucharest. However, just like the work on the A3 motorway in Romania, they were stopped due to funding issues. In 2018, Hungary received up to 265 million Euros from the EU Cohesion Funds specifically to complete this section of the M4 expressway. It was opened on September 4, 2020.

Junctions, exits and rest area[]

Distance from the Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.

  • Hungary road sign E-018.svg The section between Budapest and Berettyóújfalu is expressway. The maximum speed limit is 110 km/h, with 2 active lanes no emergency.svg (2x2 lanes).
  • Hungary road sign E-016.svg The section between Berettyóújfalu and Nagykereki is motorway. The maximum speed limit is 130 km/h, with 2 active lanes and 1 emergency.svg (2x2 lanes and stop lane).
km Destinations Route Notes
18 Exit Budapest Connection to Budapest
Introductory path of M4
19 Exit Vecsés-nyugat 4 Western connection to Vecsés
21 Exit Budapest International Airport
24 Exit Vecsés-kelet, Ecser Eastern connection to Vecsés
Interchange M4-M0 interchange
(Budapest bypass)
M0 / E60 Connection to Pfeil oben.svg Győr, Székesfehérvár, Pécs, Szeged and Pfeil unten.svg Nyíregyháza, Vác.
The western terminus of European route E60
30 Exit Üllő, Gyömrő
35 Exit Monor-nyugat, Péteri Western connection to Monor
41 Exit Monor-kelet, Gomba Eastern connection to Monor
49 Exit Pilis, Monorierdő, Káva
52 Rest area Gerje rest area Hungary road sign F-014.svg
56 Exit Albertirsa, Dabas Also serves as a connecting road to M5 / E75
63 Exit Ceglédbercel
66 Exit Cegléd-Öregszőlő Connection to the Aquapark of Cegléd
69 Rest area Ceglédi rest area Hungary road sign F-016.svg MOL / MOL + Hungary road sign F-005.svg Hungary road sign F-006.svg Hungary road sign F-002.svg
Exit Cegléd, Tápiószentmárton
70 Exit Cegléd, Tápiószele
77 Exit Abony-nyugat Western connection to Abony
85 Rest area Abonyi rest area Hungary road sign F-014.svg
89 Exit Abony-észak, Újszász Northern connection to Abony
93 Exit Abony-kelet, Szolnok-nyugat Eastern connection to Abony
Western connection to Szolnok
Interchange M4-M8 interchange M8 Connection to the M8 motorway, towards Kecskemét.
99 Exit Szolnok-észak, Jászberény Northern connection to Szolnok
101 Bridge Zagyva (Bridge)
106 Exit Szolnok-kelet, Besenyszög Eastern connection to Szolnok
112 Bridge Tisza (Bridge)
115 Rest area Rest area
117 Exit Törökszentmiklós-nyugat, Szajol 4 Western connection to Törökszentmiklós
125 Exit Törökszentmiklós-kelet 4 Eastern connection to Törökszentmiklós
133 Exit Fegyvernek,
145 Exit Kisújszállás-nyugat, Kenderes 4 Western connection to Kisújszállás
154 Exit Kisújszállás-kelet 4 Eastern connection to Kisújszállás
160 Rest area Rest area
165 Exit Karcag, Füzesgyarmat
180 Exit
Rest area
Püspökladány, Báránd
Püspökladányi rest area
42 Hungary road sign F-016.svg
190 Exit Kaba
197 Rest area Rest area
202 Exit Hajdúszovát, Földes
208 Rest area Rest area
210 Interchange M4-M35 interchange M35 / E79 Connection to the M35 motorway, towards Debrecen.
The western terminus of European route E79 and of the motorway section.
The eastern terminus of the expressway section.
215 Exit Berettyóújfalu, Derecske
220 Rest area Körtvélyes rest area
226 Exit Gáborján, Váncsod
230 Rest area Kengyeles rest area
237 Exit Nagykereki, Pocsaj, Biharkeresztes
242 Border control Nagykereki (H) – Borș II (RO) border crossing
A3 / E60 / E79 → to Oradea, Romania Romania
  •   Under construction
  •   Planned section