Sydney Metro Alstom Metropolis TS set

From Wikipedia, the free encyclopedia

Alstom Metropolis TS set
0402 Chatswood, 2019 (01).jpg
04 at Chatswood station
Sydney Metro interior DSC02382.jpg
In service2019–present
ManufacturerAlstom
Built atSri City
Family nameMetropolis
Constructed2016–
Entered service26 May 2019 (2019-05-26)
Number under construction23 sets
Number built22 sets
Number in service22 sets
Formation6 car sets
TC-MPC-MC-MC-MPC-TC[1]
Fleet numbersTS-01 - TS-22
Operator(s)Metro Trains Sydney
Depot(s)Tallawong
Line(s) servedNorth West
Specifications
Car body constructionStainless steel
Train length121.5 m (398 ft 7+12 in)
Car length20.25 m (66 ft 5+14 in)
Width3,035 mm (9 ft 11+12 in)
Doors3 per side
Maximum speed100 km/h (62 mph) (design)
90 km/h (56 mph) (service)
Weight240 t (240 long tons; 260 short tons)[2]
Traction systemIGBT-VVVF (Alstom OPTONIX)[1]
Traction motors3-phase AC induction motor (Alstom OPTONIX)[1]
Electric system(s)1,500 V DC (nominal) from overhead catenary
Current collection methodPantograph
Safety system(s)Alstom Urbalis 400 moving block ATC (CBTC) under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI[1]
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Sydney Metro Alstom Metropolis TS sets are a class of electric multiple units that operate on the Sydney Metro network. It is the first fully automated passenger train stock in Australia as well as the first single-deck set to operate in Sydney since the withdrawal of single deck trains on the suburban rail network in the 1990s. A total of 176 carriages, making up 22 6-car sets, entered service in 2019 with the opening of the Metro North West Line. 23 more sets will be rolled out for the City & Southwest extension, commencing service in 2024, which will expand the Metropolis fleet to 45 sets.

History[]

Prior to the introduction of services, a full-scale model of the new train was built for public display, including at the annual Sydney Royal Easter Show.[3][4] It consisted of the front carriage, and was approximately 75% of the length of the final design, having two doors instead of three.[5]

The sets were manufactured at Alstom's rolling stock facility in India,[6][7] with the first train arriving on 26 September 2017.[8]

In February 2018, dynamic testing on the first of the trainsets began.[9] Testing was done on brakes, passenger information displays, lighting and door operation.[10]

In November 2019, MTS was awarded a 10-year contract to operate the rolling stock on the metro network. To commemorate the new contract, 23 additional Metropolis sets were ordered, bringing the total fleet to 45 sets (with extensions to 8 cars likely to happen if sufficient demand warrants it) by the time the City & Southwest extension is scheduled to open in 2024.[11]

The rolling stock officially entered service on 26 May 2019 on the Metro North West Line.

Design[]

Digital displays

Each single-deck train features two dedicated areas for prams, luggage and bicycles. There are three doorways per side per carriage and no internal gangway doors between the carriages.[12] In a 6-car configuration the trains have a seating capacity of 378 people, with a total capacity of 1,100.[13] The trains utilise Alstom's trademark Urbalis 400 Grade-of-Automation signalling system that ensures trains are capable of driving and operating automatically at all times without onboard staff, including door closing, obstacle detection and dealing with emergency situations.

The trains feature longitudinal 'bench-style' seating per carriage (similar to most metro rapid-transit/subway trains), with distinctly coloured seats for priority and disabled passengers.[14] Seats in wheelchair spaces can fold up in order to fit prams and wheelchairs. A doorway-status light is installed above each doorway, which illuminates white when the doors are fully closed, green when the doors are fully open, and flashes in red when the doors are opening or closing.

Features of the Metropolis sets include CCTV cameras, internal passenger information display (PID) screens and digital voice announcements. The PID screens display the name of the next station, along with icons for available transport mode interchanges. The sets are also fitted with air conditioning and emergency help points. There are also USB charging ports inside the carriages.[15][16]

The Metropolis sets are operated via a control centre based at Rouse Hill. In the event the system is otherwise unable to operate the train, an engineer can manually take over the train's functions.

Service formation[]

The ends of the train, as viewed from the interior

The 270 Alstom Metropolis carriages will form 45 six-car sets. Individual vehicles are numbered as follows:

Tallawong Chatswood
01
:
22
0101
:
2201
0103
:
2203
0105
:
2205
0106
:
2206
0104
:
2204
0102
:
2202
23
:
45
2301
:
4501
2303
:
4503
2305
:
4505
2306
:
4506
2304
:
4504
2302
:
4502
  • Cars 01 & 02 are control trailer cars.
  • Cars 03 & 04 are non-control motor cars with pantographs.
  • Cars 05 & 06 are non-control motor cars.

The trains are uni-directional, which means car 01 will always be facing a northern end, and car 02 will always be facing a southern end.

In the event that extensions to 8 cars happens if sufficient demand warrants the contract, two infill carriages will be added between cars 05 and 06.

References[]

  1. ^ Jump up to: a b c d David Jehan; Andrew Honan (January 2016). Sydney Metro - Australia's first fully-automated rolling stock (PDF). Melbourne: Railway Technical Society of Australasia. ISBN 9781922107800.CS1 maint: multiple names: authors list (link)
  2. ^ Douglas, Neil; Thornton, Peter (2019). "Passenger Benefits of Sydney Metro" (PDF). Australasian Transport Research Forum.
  3. ^ "Check out the Sydney Metro train". Retrieved 29 July 2017.
  4. ^ "Transport for NSW Sydney Metro Marquee at the Sydney Royal Easter Show 2016 - Proj-X Design". www.proj-x.com.au. Retrieved 29 July 2017.
  5. ^ "First glimpse of new Metro train | Sydney Metro". www.sydneymetro.info. Retrieved 30 July 2017.
  6. ^ "Sydney Metro Receives First Indian Built Alstom Train". The Metro Rail Guy. 28 September 2017. Retrieved 30 March 2020.
  7. ^ "First metro trains arrive for new $8.3 billion line to Sydney's north west". Sydney Morning Herald. 26 September 2017. Retrieved 20 January 2018.
  8. ^ "First Sydney Metro train arrives". NSW Government. 26 September 2017. Retrieved 27 September 2017.
  9. ^ UK, DVV Media. "Sydney metro train on test". Metro Report. Retrieved 11 February 2018.
  10. ^ "First Metro Train Testing | Sydney Metro". www.sydneymetro.info. Retrieved 11 February 2018.
  11. ^ "Operations and fleet contract awarded for Sydney Metro extension". International Railway Journal. 23 November 2019. Retrieved 2 June 2020.
  12. ^ "Case study: North West Rail Link, Sydney, Australia". Alstom. Archived from the original on 4 March 2016. Retrieved 14 October 2015.
  13. ^ O'Rourke, Jim (5 November 2015). "Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage". The Daily Telegraph. Retrieved 7 November 2015.
  14. ^ "Alstom's first 'Make in India' Metro inaugurated in Kochi". raillynews.com. 19 June 2017. Retrieved 21 January 2018.
  15. ^ "Alstom Metropolis Trains". Railway Technology. Retrieved 2 June 2020.
  16. ^ "Sydney Metro Trains Features & Design | Sydney Metro". www.sydneymetro.info. Retrieved 2 June 2020.

External links[]

Specifications

Retrieved from ""