Thiruvananthapuram–Kasargode semi high speed rail corridor

From Wikipedia, the free encyclopedia
  (Redirected from )

Thiruvananthapuram–Kasaragod Semi High Speed Rail Corridor
Thiruvananthapuram–Kasaragod Semi High Speed Rail Corridor
Overview
Native nameതിരുവനന്തപുരം-കാസർഗോഡ് അർധ അതിവേഗ റെയിൽ‌ ഇടനാഴി
StatusPlanning
OwnerK-Rail (Kerala Rail Development Corporation)
LocaleKerala, India
TerminiTrivandrum
Kasaragod
Stations11
Websitekeralarail.com
Service
TypeHigher-speed rail
Depot(s)Kollam
History
Last extensionPlanned extension till Mangalore from Kasaragod
Technical
Line length532 km (331 mi)
Number of tracks2
CharacterElevated, underground, surface and grade-separated, dedicated passenger tracks
Track gaugeStandard Gauge of 1,435 mm
ElectrificationYes
Operating speed200 km/h (120 mph)
SignallingETCS Level 2 with LTE
Proposed stations

Legend
Thiruvananthapuram
Kollam
Chengannur
Kottayam
Ernakulam
Cochin International Airport
Thrissur
Tirur
Kozhikode
Kannur
Kasargode

The Thiruvananthapuram–Kasaragod Semi High Speed Rail Corridor, also known as the Silver Line, is a proposed higher-speed railway in India that would connect Thiruvananthapuram, the capital city of Kerala, with Kasaragod, also in Kerala. It will have a designed speed of 200 kilometres per hour (120 mph), allowing trains to cover the 532-kilometre (331 mi) distance in less than four hours, compared to the present 10 to 12 hours it takes to traverse this distance. Trivandrum, Kollam, Chengannur, Kottayam, Ernakulam, Nedumbassery Airport, Thrissur, Tirur, Kozhikode, Kannur and Kasaragod will be the stations in this corridor.[1]

The Detailed Project Report of the project is being prepared by K-Rail (Kerala Rail Development Corporation Limited), a joint venture company between Ministry Of Railways and Government of Kerala.

The railway line aims to ease transport congestion between the northern and southern regions of the state, whilst also improving travel times and protecting fighting climate change. The project includes a roll-on/roll-off (RORO) train service that conveys road vehicles, and enhanced feeder public transport services from stations.[2] But, proposed usage of Standard Gauge instead of Broad-gauge will hinder the Ro-Ro capacity of the line.

Background[]

Kerala has 162,000 kilometres (101,000 mi) of roads which is 4.2% of India's total length. This is quite high considering that Kerala accounts for 2.7% of the total population of India. The existing railway network in the state is also not suitable for faster travel. The average speed of journey by rail and road in the state is about 30% to 40% lower than in the neighbouring states.

The journey becomes even slower in the rainy seasons because of deterioration in the condition of the roads and railway lines. Because of the adverse terrain, there is little scope of economically raising speed of trains on the existing railway line in the corridor. With the above in mind, the Government has decided to build the Thiruvananthapuram - Kasaragod corridor as a Semi high-speed line, covering the coastal region which is the most densely populated region of the state.

Kerala being a densely populated state, most of the commuters depend on the conventional modes of transport. The proposed Silver Line (SHSR) will bring about a remarkable change in local commute, by improving the travel time and quality of transportation. There will be a substantial reduction in road accidents due to the reduction of congestion on roads. This also includes the last mile connectivity using aggregate services and feeder services, which will transform the people's perception towards public transportation. The Silver Line (previously called as SHSR) will also be duly integrated with the existing Indian Railway network for the benefit of interstate and long distance travellers.


Environmental and social impact[]

Transport systems bring enormous benefits to society providing access and mobility that are essential for modern societies and economic growth. However, transport activities have many undesirable external impacts as well, such as CO2 emissions, congestion, accidents, land use and many more. The urge to fight these challenges is therefore pushing economies towards more efficient, and sustainable solutions.

Silver Line[2] is a suitable alternative as it saves time, resources, and helps in reduction of carbon footprint by relying on renewable energy sources for its stations, providing last-mile connectivity to and from the station using electric vehicles (EVs), and facilities for parking/charging EVs at the stations. The proposed RORO services also contribute in reducing pollution and congestion compared to road transport of goods vehicles.

History[]

History of Kerala Semi High-speed rail
Kollam Junction railway station - An evening view.jpg
Year Event
2009 February Kerala Finance Minister Thomas Isaac announced Thiruvananthapuram-Kasaragod high-speed rail corridor[3]
2010 February Initial planning for Kerala HSR by Chief Minister V. S. Achuthanandan[4]
2011 September Special-purpose vehicle formed for the project extending up to Mangalore by CM Oommen Chandy
2012 June DMRC submitted a feasibility study report with an est. cost of 127 billion (US$1.7 billion)
2014 October CM Oommen Chandy's stated that the project is now stalled due to protests
2016 June Kerala Government, headed by CM Pinarayi Vijayan, asked DMRC to submit the DPR
2019 January Government of Kerala decided to wind up Kerala HSR project, found unviable due to high project cost[5]
2019 May Survey report by France-based Systra said a semi high-speed rail project across Kerala could be financially viable
est. cost 56 billion (US$740 million)[6]
2019 December Government of Kerala named the Semi-High Speed Rail Project as 'Silver Line'. Estimated cost ₹56,443 crore[7]
2020 January Hyderabad-based GeoKno India Private Limited completed an aerial survey for Kerala 'Silver Line' project[8]
2020 January Kerala Government decided to set up land acquisition cells in 10 districts to acquire 1,226.45 hectares for 'Silver Line' project
2020 April On 16 April, the Kerala Rail Development Corporation (K Rail) Board approved the DPR of 'Silverline Kerala'. One additional station(Kochi Airport) added in the route.[9]
2020 June On 10 June, the Government of Kerala approved the revised alignment of 57.5 km Vadakara-Thalassery stretch of 'Silverline Kerala' to reduce displacement and avoid bifurcating Mahe.[10][11]
2020 October The project proposal has been tabled before the Railway Board for approval[12]
2021 February Central Government approved the project. Finance Minister wrote to the Kerala CM for speeding up the land acquisition and financial plan related discussions with JICA for the Kerala Silverline project.[13][14]
2021 May Housing and Urban Development Corporation Kerala granted ₹3,000 crore loan for acquiring land for the first phase (Kochuveli to Chengannur) developments.


The Thiruvananthapuram–Mangaluru high-speed rail corridor was mooted in the 2009-10 budget speech of the LDF government. The project was cleared by the State Cabinet in February 2010.[15][16] The Kerala State Industrial Development Corporation (KSIDC) was appointed as the nodal agency to develop the project.

In September 2011, a special purpose vehicle, the Kerala High Speed Rail Corporation Ltd. (KHSRC) was formed to implement the project.[17] The Ministry of Railways has stated that the project is feasible and has expressed full support for the project.[18] The Delhi Metro Rail Corporation (DMRC) conducted the pre-feasibility study of the project. The KHSRC requested the DMRC to submit a detailed project report (DPR) for the project by November 2012. However, the DPR faced several delays.[19]

In February 2014, the Indian media reported that the state government shelved the project. The Times of India quoted unnamed sources as stating, "It has not been scrapped officially, but it is at a dead stage. The estimated project cost has almost doubled now, and the more the delay, the costlier the project would become." The cost of constructing the project was estimated to be 1.80 lakh crore (US$24 billion), much higher than the originally estimated 1 lakh crore (US$13 billion).[20][21][22] 80% of the cost was proposed to be funded by JICA, and the remaining 20% by the State and Central governments.

In March 2014, T. Balakrishnan, Chairman and Managing Director of KHSRCL, denied that the project had been scrapped.[23] In October 2014, Kerala Chief Minister Shri Oommen Chandy stated that the government wished to implement the project, and that the project was stalled due to protests. He also stated that the survey had been completed and the project would be implemented only with the support of people.[24]

In June 2016, the newly elected Left government asked the DMRC to complete the DPR.[citation needed] The DMRC submitted the detailed project report (DPR) to the state government in July 2016. The DMRC proposed constructing a 430-kilometre (270 mi) line from Kochuveli in Thiruvananthapuram up to Kannur, with an option to extend the line up to Mangalore in a later phase.[25] The Union Government approved the DMRC's draft report on 9 July 2016.[26]

In August 2016, the KHSRCL announced that it would conduct survey to determine public opinion of the proposed alignment. The survey is intended to prevent any possible protests over land acquisition and suppress dissent from opponents of development projects in the state.[27] The results of the survey, published in February 2017, found that 86% of the 13,447 people interviewed across 110 assembly constituencies in 11 districts were in favour of the project. Only 9% of those surveyed opposed the project, while 5% remained neutral. 73% of the respondents were aware of the project before being interviewed. Of those who had not heard of the project, 82% expressed support, while 88% of those who were aware expressed support. Supporters of the project believe that it will reduce travel time, reduce greenhouse gas emissions and accidents, and generate development in the state. Opponents of the project argue that the project will result in large-scale displacement of people as a result of land acquisition, take away the livelihood of farmers whose land is acquired, waste a large sum of money, and reduce the number of trees.[28][29][30]

In 2019, a survey by French consultant company Systra found that the Kochuveli-Kasaragod rail corridor could be financially viable. Systra found that the project can recoup 6% of its cost every year after linking Thiruvananthapuram and Kochi airports.[31] The state agency, Kerala State Remote Sensing and Environment Centre (KSERC), is supposed to submit the survey report by March 2020. After land acquisition order, a detailed project report (DPR) will be prepared by the Government of Kerala.[32]

Project details[]

Project Specifications
Project title Silver Line
Total distance 531.45 km (330.23 mi)
Travel time less than 4 hours
Maximum speed 220 km/h (140 mph)
Maximum operating speed 200 km/h (120 mph)
Number of stations 11
Proposed project cost 66,079 crore (US$8.8 billion)
Tracks 2 (up & down)
Rolling stock 9 coaches initially
Expected daily ridership 67,740 pax[33]

On August, 2021 Revenue Department, Thiruvananthapuram published a list of survey numbers for land confiscation.[34] Kerala Infrastructure Investment Fund Board approved a loan of Rs 2100 crores for buying these lands from respective owners of these plots.[35]

Plan[]

Kerala will get a special railway corridor along its 532-kilometre (331 mi) length by 2024, as the state government is set to build a 66,079 crore (US$8.8 billion) rail line that will enable semi-high speed trains ply between upstate Kasaragod and the capital city of Thiruvananthapuram. The semi-high-speed corridor from Thiruvananthapuram to Kasargode would not have any level crossings. K-Rail will have to acquire about 1,200 hectares (3,000 acres) for the project that will have the rails elevated along urban stretches. The trains will run at a maximum speed of 200 kilometres per hour (120 mph). They will initially have nine coaches, and the number will be subsequently enhanced to 12. The travel charge is projected to be ₹2.75 per km (2.4¢ US/mi), and there will be an annual hike of 7.5 per cent.[36]

K-Rail expects a ridership of 67,740 passengers a day. It estimates to carry 1,330 travellers in one direction at peak hours. For meeting the expenses of the 66,079 crore (US$8.8 billion) project, 34,454 crore (US$4.6 billion) will come as loans. The Centre and state will need to provide 7,720 crore (US$1.0 billion) each. The Kerala government will spend 8,656 crore (US$1.1 billion) on land acquisition and allied matters. The rest of the expenses will be met through other loans by the union and state governments. The rail line will pass through 11 of the state's 14 districts, and will stop at ten stations. Up its northward course from Thiruvananthapuram, these stations will be Kollam, Chengannur, Kottayam, Kochi, Kochi Airport, Thrissur, Tirur, Kozhikode and Kannur before reaching Kasaragod. The SilverLine corridor will be 100% green project. K-Rail is set to adopt last-mile connectivity, with multi-modal integration, system-driven e-vehicle public transport system, charging as well as parking stations, which would take the state to next generation of urban mobility. The project will also adopt the latest world-class rail system technology like signalling system of ERTMS level-2 with automatic train control system, ticketing, communication, fully air-conditioned rolling stock with modern passenger amenities. The main depot for the line will be located near the Kochuveli terminus.

See also[]

References[]

  1. ^ "DPR of semi-high-speed railway line from TVM to Kasaragod approved". Mathrubhumi. 17 April 2020. Retrieved 17 April 2020.
  2. ^ a b "Traders in T'puram pledges total support for SHSR project". 5 September 2019. Retrieved 4 February 2020.
  3. ^ "TVPM-Kasaragod in 4 hours! Isaac brings in fast rail corridor in budget". On Manorama. 1 February 2019. Retrieved 24 January 2020.
  4. ^ "Kerala plans high speed rail corridors". DNA. 10 February 2010. Retrieved 24 January 2020.
  5. ^ "Govt winds up high-speed rail project". Times of India. 10 January 2019. Retrieved 24 January 2020.
  6. ^ "Govt winds up high-speed rail project". Times of India. 10 January 2019. Retrieved 24 January 2020.
  7. ^ "Government approves Rs 56,443 cr Kerala semi-high speed rail project named "Silver line"". Affairs Cloud. 10 January 2019. Retrieved 24 January 2020.
  8. ^ "Kerala semi-high speed railway line aerial survey completed; Thiruvananthapuram to Kasaragod in 4 hours soon!". FInancial Express. 8 January 2020. Retrieved 24 January 2020.
  9. ^ "DPR of semi-high-speed railway line from TVM to Kasaragod approved". Mathrubhumi. 17 April 2020. Retrieved 17 April 2020.
  10. ^ "Cabinet nod for Silver Line DPR". The Hindu. 10 June 2020. Retrieved 12 April 2020.
  11. ^ "K-Rail revises alignment of section". The Hindu. 9 June 2020. Retrieved 10 April 2020.
  12. ^ "Semi-High Speed Rail Corridor project tabled before Railway Board". Mathrubhumi. 10 October 2020. Retrieved 12 October 2020.
  13. ^ "Kerala's ambitious Silverline gets Centre's green light". TNIE. 2 February 2021. Retrieved 2 February 2021.
  14. ^ "After windfall from Union Budget 2021, Kerala's Silverline rail project gets Centre's nod". Manorama. 2 February 2021. Retrieved 2 February 2021.
  15. ^ "No cause for concern over high speed rail: Chandy". The Hindu. 25 September 2012. Retrieved 11 March 2013.
  16. ^ "Kerala Chief Minister assures people on high speed rail project". NDTV. 25 September 2012. Retrieved 11 March 2013.
  17. ^ "Kerala's High Speed Dilemma". Yentha.com. 8 August 2012.
  18. ^ Krishnakumar, G. (13 September 2012). "1,700 families to be displaced for high speed rail project". The Hindu. Retrieved 11 March 2013.
  19. ^ S. Anil Radhakrishnan (10 March 2013). "High Speed Corridor: DMRC needs more time to submit report". The Hindu. Retrieved 11 March 2013.
  20. ^ High speed rail project shelved by planning board - The Times of India
  21. ^ http://english.manoramaonline.com/cgi-bin/MMOnline.dll/portal/ep/contentView.do?contentId=16193075&tabId=1&programId=11565535
  22. ^ Kerala pauses work on high-speed rail corridor project - News Oneindia
  23. ^ Pillai, R. Ramabhadran (14 March 2014). "High-speed rail to take Kochi-Kasaragod route". The Hindu. Retrieved 14 March 2014.
  24. ^ "അതിവേഗ റെയില്‍: പിന്തുണച്ചാല്‍ നടപ്പാക്കുമെന്നു മുഖ്യമന്ത്രി". Mangalam. 5 October 2014. Retrieved 5 October 2014.
  25. ^ Radhakrishnan, S. Anil (12 July 2016). "From capital to Kannur in two hours". The Hindu. Retrieved 6 February 2017.
  26. ^ "TVM-Kannur high-speed rail: Centre approves draft report". Mathrubhumi. Retrieved 6 February 2017.
  27. ^ Radhakrishnan, S. Anil (20 August 2016). "Public opinion on high-speed rail corridor to be elicited". The Hindu. Retrieved 6 February 2017.
  28. ^ "86 percent people in Kerala want Thiruvananthapuram-Kannur high-speed rail corridor, reveals survey". The New Indian Express. Retrieved 6 February 2017.
  29. ^ "Keralites 'in favour of high-speed rail project'". Gulf-Times (in Arabic). 2 February 2017. Retrieved 6 February 2017.
  30. ^ Radhakrishnan, S. Anil (2 February 2017). "Kerala gives a thumbs up to high-speed rail". The Hindu. Retrieved 6 February 2017.
  31. ^ "Kerala's semi high-speed rail project likely to be profitable: Survey". Onmanorama. Retrieved 20 May 2019.
  32. ^ "Kerala's semi high-speed rail project likely to be profitable: Survey". Mathrubhumi. 24 February 2020. Retrieved 24 February 2020.
  33. ^ "'Semi-high speed railway line is Kerala's transportation solution for future'". Gulf-Times. Kochi. 27 October 2019. Retrieved 5 November 2019.
  34. ^ "G.O.(Ms)No.163/2021/RD" (PDF). Thiruvananthapuram: Revenue Department. 2021 – via Kerala Rail Development Corporation Limited (K-Rail). https://keralarail.com/projects/thiruvananthapuram-kasaragod-semi-high-speed-rail-shsr-project/
  35. ^ "Land confiscation procedures for Silverline Semi High-Speed rail project begins". Mathrubhumi. Retrieved 16 October 2021.
  36. ^ "DETAILED PROJECT REPORT (DPR) - Kerala SemiHSR" (PDF). Keralarail.com. 23 September 2021. Retrieved 23 September 2021.
Retrieved from ""