Verbund Casimcea Wind Farm

From Wikipedia, the free encyclopedia
Verbund Casimcea Wind Farm
Country
LocationCasimcea
StatusOperational
Commission date2013
Owner(s)Verbund
Power generation
Units operational88
Nameplate capacity225 MW

The Verbund Casimcea Wind Farm is an operational wind power project located in Tulcea County, Romania. It consists of 88 individual wind turbines with a nominal output 2.5 MW each which will deliver up to 540 GWh of power, enough to power over 350,000 homes, with a capital investment required of approximately €380 million.[1]