As of 2013, there was an installed capacity of 2,599 megawatts (MW) of wind power in Romania,[1] up from the 7 MW installed capacity in 2007.[2][3] Until December 2010, Romania added around 440 MW to its installed wind capacity from two wind farms: Fântânele-Cogealac and the EDP Peştera.[4] The Fântânele-Cogealac Wind Farm has been completed in 2012 and at the time was the largest in Europe.[5]

Romania has a wind-power potential of around 14,000 MW,[6] and an energy-generating capacity of 23 terawatt-hours.[6] The country's wind power capacity that can be assimilated by the national transport grid is between 3,000 MW and 9,000 MW,[7] while only in the last two years the total power of the requests for connecting to it was about 22.800 MW.[8] The Dobrogea region, which consists of Constanţa and Tulcea counties, has the second-highest wind potential in Europe.[9]

Several companies are interested in investing in wind farms in Romania. The Italian company Enel Green Power, a subsidiary of Enel, plans to build several wind farms with a total capacity of 350 MW.[10] The Swiss conglomerate Cofra Group plans to build two large wind farms, one that will have a capacity of 700 MW in Dobruja and one that will have a capacity of 400 MW in Neamţ and Suceava counties; the total investment will amount to $1.65 billion.[11] In 2008, Iberdrola bought 50 wind farm projects, with a combined installed capacity 1,600 MW, from two companies for $450 million.[12] Romanian companies interested in building wind farms include Electrica and , which have plans to build wind farms that will have an installed capacity of 310 MW with total investments of $420 million.[13][14] The Hungarian company Sinus Holding will build five wind farms in the Northern Moldavia region, having an installed capacity of 700 MW and totaling $800 million in capital investment, that will be built by December 2009.[15]

Largest projects[]

These are the most important wind farm projects in Romania (larger than 10 MW):

Project name Sponsoring company Installed capacity (MW) County Status Completed/
Notes
Activ Business Casimcea Activ Business 45 Tulcea Approved [16]
Eco Power Eco Power 80 Buzău Approved [17]
EDP Dobrogea Energias de Portugal 225 Tulcea Approved [18]
EDP Peştera Wind Farm Energias de Portugal 90 Constanţa Commissioned [19]
EDP Cernavodă Wind Farm Energias de Portugal 134 Constanţa Commissioned [20]
Enel Agighiol Enel Green Power 34 Tulcea Commissioned [21]
Babadag[citation needed] Martifer 48 Tulcea Approved [22]
Blue Investment Baia[citation needed] Blue Investment 35 Tulcea Under construction [23]
Blue Planet Baia[citation needed] Blue Planet Investments 35 Tulcea Under construction [24]
Fălciu-Berezeni E.ON 30 Vaslui Under construction [25]
Călimani West Wind 27 Suceava Approved [26]
Oraviţa Local authorities 10 Caraş-Severin Commissioned [27]
Enel Corugea Enel Green Power 70 Tulcea Under construction [28]
Eolgen Racoviţeni Eolgen 45 Buzău Proposed [29]
Roşieşti E.ON 46 Vaslui Approved [25]
EOL Săcele Electrica and Holrom 50 Constanţa Approved [30]
Eolica Baia Eolica Dobrogea 126 Tulcea Approved [31]
Eolica Beidaud Eolica Dobrogea 128 Tulcea Approved [31]
Eolica Casimcea Eolica Dobrogea 244 Tulcea Approved [31]
Eolica Ceamurlia South Eolica Dobrogea 28 Tulcea Approved [31]
Eolica Cogealac Eolica Dobrogea 448 Constanţa Approved [31]
Corbiţa Energycum 50 Vrancea Approved [32]
Eolica Corbu Eolica Dobrogea 68 Constanţa Approved [31]
Fântânele-Cogealac CEZ Group 600 Constanţa Commissioned 2012[4]
Eolica Grǎdina Eolica Dobrogea 62 Constanţa Approved [31]
Eolica Istria Eolica Dobrogea 74 Constanţa Approved [31]
Eolica Kogălniceanu Eolica Dobrogea 32 Constanţa Approved [31]
Eolica Mihai Viteazu Eolica Dobrogea 80 Constanţa Under construction [33]
Eolica Pantelimon Eolica Dobrogea 66 Constanţa Approved [31]
Eolica Sǎcele Eolica Dobrogea 252 Constanţa Approved [31]
Eolica Sarichioi Eolica Dobrogea 102 Tulcea Approved [31]
Eolica Târguşor Eolica Dobrogea 36 Constanţa Approved [31]
Vetrişoaia E.ON 36 Vaslui Approved [25]
Eolus Vind Eolus Vind 30 Constanţa Approved [34]
Europp Galaţi Europp Energocons 33 Galaţi Approved [16]
Eximprod Galaţi Eximprod Buzău 70 Galaţi Approved [16]
Green Energy Green Energy 200 Tulcea Approved [35]
Liteni-Dolhasca Ulli Rowind 34 Suceava Under construction [36]
Market Expert Tulcea Market Expert 33 Tulcea Approved [16]
Mărişelu Local authorities 300 Cluj Approved [37]
Moldova Noua Enel Green Power 48 Caraş-Severin Commissioned 2012[38]
New Energy Constanţa New Energy Group 30 Constanţa Under construction [39]
New Energy Tulcea New Energy Group 20 Tulcea Approved [39]
Orşova Toplet Energy 35 Mehedinţi Under construction [40][41]
Romwind Constanţa Romwind 30 Constanţa Approved [16]
Sălbatica I Enel Green Power 70 Tulcea Commissioned 2011[42]
Sălbatica II Enel Green Power 70 Tulcea Commissioned 2012[43]
Sibioara Sibioara Wind Farm 42 Vaslui Approved [16]
Sinus Holding Sinus Holding 700 Vaslui/Suceava/Neamţ Approved [15]
Tarcău Eolo Energy 24 Neamţ Approved [44]
Tomis Team Dobrogea Tomis Team 600 Tulcea/Constanţa Under construction [45]
Valea Nucarilor Enel Green Power 70 Tulcea Commissioned 2012[46]
Văcăreni Energie Investments Group 240 Tulcea Proposed [47]
Verbund Casimcea Verbund 225 Tulcea Under construction [48]
Scobinti Iasi ACK srl Romania 40 Scobinti-Iasi Approved [49]
Moldova-Eolian srl Romania 100 Ruginoasa-Iasi Proposed [50]
Siminoc - Murfatlar Zar Twins Energy 45 Constanta Approved
Nalbant Tulcea Philro Energia 20 Nalbant Tulcea Approved [51]

Totals[]

Category status Total capacity
Commissioned 2,599 MW
Under construction MW
Approved MW
Proposed MW
All Stages MW

See also[]

References[]

  1. ^ EWEA (February 2014). "Wind in power: 2013 European statistics" (PDF). European Wind Energy Association. Retrieved 2014-11-05.
  2. ^ "Avalansa portugheza: Martifer pregateste o achizitie de 7 mil. euro pe eolian si un parc propriu, EDP primeste deja turbinele". Business Standard (in Romanian). 2009-04-01. Archived from the original on 2011-07-16. Retrieved 2009-04-02.
  3. ^ Cristian Matache (2008-08-21). "Prima centrală energetică eoliană din România va fi operaţională din 2009" (in Romanian). Gandul. Retrieved 2009-02-04.
  4. ^ Jump up to: a b Catalin Lupoaie (2008-08-27). "CEZ face energie eoliana cat un reactor de la Cernavoda". Ziarul Financiar (in Romanian). Retrieved 2009-02-03.
  5. ^ Sally Bakewell: "CEZ Commissions All GE Turbines at Europe’s Largest Wind Farm" in Bloomberg, 14 December 2012
  6. ^ Jump up to: a b "Investiţiile în energia eoliană rămân deocamdată la nivel de intenţie" (in Romanian). Mediafax. 2007-12-17. Retrieved 2009-08-18.
  7. ^ "Energia eoliana in Europa, de cinci ori puterea instalata a Romaniei" (in Romanian). www.ziare.com. 2007-09-07. Retrieved 2009-07-28.
  8. ^ http://www.adevarul.ro/financiar/Turbinele_eoliene_din_Romania_pot_functiona_la_30-_din_puterea_instalata_0_194380904.html
  9. ^ Mirona Hriţcu (2009-04-29). "Numai pentru milionarii în euro: afaceri cu energie eoliană" (in Romanian). Capital. Retrieved 2009-07-28.
  10. ^ "Enel: 280 MW din vant, in Tulcea". Business Standard (in Romanian). 2008-09-24. Archived from the original on 2012-07-29. Retrieved 2009-08-14.
  11. ^ "Cofra investeste 1,1 miliarde euro in centrale eoliene". Business Standard (in Romanian). 2007-08-31. Archived from the original on 2012-07-19. Retrieved 2009-02-03.
  12. ^ Roxana Petrescu (2008-02-13). "Dupa incercarea de preluare a Electrica Muntenia Sud, Iberdrola investeste 300 mil. euro in centrale eoliene". Ziarul Financiar (in Romanian). Retrieved 2009-08-18.
  13. ^ "Green Energy Grup, 300 milioane de euro pentru parcuri eoliene". Business Standard (in Romanian). 2007-08-23. Archived from the original on 2012-07-31. Retrieved 2009-08-18.
  14. ^ "Electrica vrea parteneri chinezi pentru investitii in eolian si hidro". Business Standard (in Romanian). Archived from the original on 2012-07-29. Retrieved 2009-08-18.
  15. ^ Jump up to: a b "Sinus Holding va construi parcuri de turbine eoliene de 700 MW in Moldova". Business Standard (in Romanian). 2008-07-03. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
  16. ^ Jump up to: a b c d e f "Cine sunt si cum rezista in criza micii jucatori din piata eolienelor". Business Standard (in Romanian). 2009-02-10. Archived from the original on 2011-07-16. Retrieved 2009-03-05.
  17. ^ "Un parc eolian de 80 MW, investitie de 130 milioane euro, va fi pus in functiune langa Ramnicu Sarat". Business Standard (in Romanian). 2009-03-17. Archived from the original on 2011-07-16. Retrieved 2009-06-11.
  18. ^ Simona Dobre (2008-11-04). "EDP face un parc eolian de 225 MW in circa doi ani". Business Standard (in Romanian). Archived from the original on 2012-03-01. Retrieved 2009-08-22.
  19. ^ "EDP va avea un prim parc eolian in functiune in Medgidia dupa o investitie de peste 100 mil. euro". Ziarul Financiar (in Romanian). 2009-10-21. Retrieved 2009-10-21.
  20. ^ "Cernavoda 110/33 kV Substation, Romania". GEDLux Sistemas de Control. 2011-05-31. Archived from the original on 2016-03-04. Retrieved 2013-07-23.
  21. ^ "Enel da startul productiei de energie verde cu un prim parc eolian de 34 MW langa Tulcea" (in Romanian). Wall Street. 2010-12-07. Retrieved 2012-12-16.
  22. ^ "Martifer face parc eolian pe 260 de hectare la Babadag". Ziarul Financiar (in Romanian). 2007-10-23. Retrieved 2009-08-18.
  23. ^ "Blue Investments va aloca 60 milioane de euro pentru un parc eolian in judetul Tulcea" (in Romanian). Financiarul. 2008-11-21. Archived from the original on 2009-01-08. Retrieved 2009-02-03.
  24. ^ Dan Odagiu (2008-11-20). "Românii fac un parc eolian gigantic". Cotidianul (in Romanian). Retrieved 2009-08-19.
  25. ^ Jump up to: a b c "E.ON investeste in prima transa pana la 170 mil. € in trei parcuri eoliene". Business Standard (in Romanian). 2008-09-23. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
  26. ^ Florin Dochita (2005-10-01). "Vintul de pe Calimani bate pentru buzunarele nemtilor". Cotidianul (in Romanian). Retrieved 2009-08-18.
  27. ^ "La Oraviţa a fost inaugurat primul parc eolian din vestul ţării" (in Romanian). Ziua de Vest. 2011-10-22. Retrieved 2012-12-16.
  28. ^ "Enel construieste un parc eolian de 70 MW in judetul Tulcea" (in Romanian). Energie Live. 2011-05-03. Archived from the original on 2012-03-23. Retrieved 2012-12-16.
  29. ^ Roxana Bucur (2008-09-25). "Un parc eolian de anvergură la Racoviteni" (in Romanian). Sansa Buzoiana. Retrieved 2009-08-22.
  30. ^ Roxana Petrescu (2008-06-18). "Electrica isi continua ofensiva pe regenerabile". Ziarul Financiar (in Romanian). Retrieved 2009-02-03.
  31. ^ Jump up to: a b c d e f g h i j k l m "Short Descriptions of Projects". Eolica Dobrogea (Schweiz) AG, Switzerland. Eolica Dobrogea. 2009-02-03. Archived from the original on 2009-02-10. Retrieved 2009-02-03.
  32. ^ Georgian Stoica (2008-08-15). ""Regele asfaltului" toarnă si un parc eolian" (in Romanian). Saptamana Financiara. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
  33. ^ BR Review: "Eolica Dobrogea administrator sues Transelectrica and ANRE for EUR 118 mln prejudice", February 21, 2012
  34. ^ "Eolus Vind intra cu 15 mil. € pe eolian". Business Standard (in Romanian). 2008-09-05. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
  35. ^ "Green Energy şi-a amânat proiectul parcului eolian de 200MW din Tulcea, din cauza legislaţiei" (in Romanian). www.realitatea.ne. 2009-07-17. Retrieved 2009-07-30.
  36. ^ "Cel mai mare parc eolian din tara, la Suceava" (in Romanian). Financiarul. 2009-03-07. Retrieved 2009-08-18.
  37. ^ Cosmina FERNOAGĂ. "Parc energetic eolian pe 100 ha la Mărişel" (in Romanian). Ziua de Cluj. Retrieved 2009-02-03.
  38. ^ "Enel Green Power commissions 48MW wind farm in Romania". ReCharge. 2012-08-30. Retrieved 2012-12-16.
  39. ^ Jump up to: a b Adrian Stoica (2007-06-11). "Nemtii cred in potentialul eolian al Dobrogei" (in Romanian). Romania Libera. Retrieved 2009-02-03.
  40. ^ "Romanian economic highlights" (PDF). Ministry of Foreign Affairs. 2009-05-04. Retrieved 2009-02-03.[permanent dead link]
  41. ^ Iulian Gogonea (2008-09-26). "Vântul aduce investiţii de milioane la Orşova" (in Romanian). Adevarul. Archived from the original on 2009-06-30. Retrieved 2009-08-18.
  42. ^ "Un nou parc eolian a devenit functional in Romania" (in Romanian). Hotnews. 1 July 2011. Retrieved 17 December 2012.
  43. ^ "Enel inaugurated 70 MW wind farm in Northern Dobrogea". Business Review. 2011-10-21. Retrieved 2012-12-16.
  44. ^ "Mori de vânt şi hidrocentrale pe Valea Tarcăului" (in Romanian). Financiarul. 2009-02-03. Retrieved 2009-02-03.
  45. ^ "Tomis Team va dezvolta cel mai mare parc eolian din România, de 600 MW" (in Romanian). money.ro. 2008-08-20. Archived from the original on 2012-08-05. Retrieved 2009-08-19.
  46. ^ "Enel inaugurates 70 MW wind park in Tulcea". Business Review. June 26, 2012. Retrieved 6 November 2013.
  47. ^ "Gică Popescu intră în afacerile pe eolian" (in Romanian). Business Magazin. Archived from the original on 2009-12-17. Retrieved 2009-09-22.
  48. ^ "Verbund a investit 380 milioane de euro in parcul eolian Casimcea" (in Romanian). business24.ro. 6 June 2013. Retrieved 10 December 2013.
  49. ^ "ACK srl" (in Romanian). Retrieved 2009-02-03.
  50. ^ "Moldova Eolian srl" (in Romanian). Retrieved 2010-02-03.[permanent dead link]
  51. ^ "Parc Fotovoltaic Nalbant Romania" (in Romanian). Retrieved 2010-02-03.

External links[]

Media related to Wind power in Romania at Wikimedia Commons

Retrieved from ""