List of wind farms in Romania
As of 2013, there was an installed capacity of 2,599 megawatts (MW) of wind power in Romania,[1] up from the 7 MW installed capacity in 2007.[2][3] Until December 2010, Romania added around 440 MW to its installed wind capacity from two wind farms: Fântânele-Cogealac and the EDP Peştera.[4] The Fântânele-Cogealac Wind Farm has been completed in 2012 and at the time was the largest in Europe.[5]
Romania has a wind-power potential of around 14,000 MW,[6] and an energy-generating capacity of 23 terawatt-hours.[6] The country's wind power capacity that can be assimilated by the national transport grid is between 3,000 MW and 9,000 MW,[7] while only in the last two years the total power of the requests for connecting to it was about 22.800 MW.[8] The Dobrogea region, which consists of Constanţa and Tulcea counties, has the second-highest wind potential in Europe.[9]
Several companies are interested in investing in wind farms in Romania. The Italian company Enel Green Power, a subsidiary of Enel, plans to build several wind farms with a total capacity of 350 MW.[10] The Swiss conglomerate Cofra Group plans to build two large wind farms, one that will have a capacity of 700 MW in Dobruja and one that will have a capacity of 400 MW in Neamţ and Suceava counties; the total investment will amount to $1.65 billion.[11] In 2008, Iberdrola bought 50 wind farm projects, with a combined installed capacity 1,600 MW, from two companies for $450 million.[12] Romanian companies interested in building wind farms include Electrica and , which have plans to build wind farms that will have an installed capacity of 310 MW with total investments of $420 million.[13][14] The Hungarian company Sinus Holding will build five wind farms in the Northern Moldavia region, having an installed capacity of 700 MW and totaling $800 million in capital investment, that will be built by December 2009.[15]
Largest projects[]
These are the most important wind farm projects in Romania (larger than 10 MW):
Project name | Sponsoring company | Installed capacity (MW) | County | Status | Completed/ Notes |
---|---|---|---|---|---|
Activ Business Casimcea | Activ Business | 45 | Tulcea | Approved | [16] |
Eco Power | Eco Power | 80 | Buzău | Approved | [17] |
EDP Dobrogea | Energias de Portugal | 225 | Tulcea | Approved | [18] |
EDP Peştera Wind Farm | Energias de Portugal | 90 | Constanţa | Commissioned | [19] |
EDP Cernavodă Wind Farm | Energias de Portugal | 134 | Constanţa | Commissioned | [20] |
Enel Agighiol | Enel Green Power | 34 | Tulcea | Commissioned | [21] |
Babadag[citation needed] | Martifer | 48 | Tulcea | Approved | [22] |
Blue Investment Baia[citation needed] | Blue Investment | 35 | Tulcea | Under construction | [23] |
Blue Planet Baia[citation needed] | Blue Planet Investments | 35 | Tulcea | Under construction | [24] |
Fălciu-Berezeni | E.ON | 30 | Vaslui | Under construction | [25] |
Călimani | West Wind | 27 | Suceava | Approved | [26] |
Oraviţa | Local authorities | 10 | Caraş-Severin | Commissioned | [27] |
Enel Corugea | Enel Green Power | 70 | Tulcea | Under construction | [28] |
Eolgen Racoviţeni | Eolgen | 45 | Buzău | Proposed | [29] |
Roşieşti | E.ON | 46 | Vaslui | Approved | [25] |
EOL Săcele | Electrica and Holrom | 50 | Constanţa | Approved | [30] |
Eolica Baia | Eolica Dobrogea | 126 | Tulcea | Approved | [31] |
Eolica Beidaud | Eolica Dobrogea | 128 | Tulcea | Approved | [31] |
Eolica Casimcea | Eolica Dobrogea | 244 | Tulcea | Approved | [31] |
Eolica Ceamurlia South | Eolica Dobrogea | 28 | Tulcea | Approved | [31] |
Eolica Cogealac | Eolica Dobrogea | 448 | Constanţa | Approved | [31] |
Corbiţa | Energycum | 50 | Vrancea | Approved | [32] |
Eolica Corbu | Eolica Dobrogea | 68 | Constanţa | Approved | [31] |
Fântânele-Cogealac | CEZ Group | 600 | Constanţa | Commissioned | 2012[4] |
Eolica Grǎdina | Eolica Dobrogea | 62 | Constanţa | Approved | [31] |
Eolica Istria | Eolica Dobrogea | 74 | Constanţa | Approved | [31] |
Eolica Kogălniceanu | Eolica Dobrogea | 32 | Constanţa | Approved | [31] |
Eolica Mihai Viteazu | Eolica Dobrogea | 80 | Constanţa | Under construction | [33] |
Eolica Pantelimon | Eolica Dobrogea | 66 | Constanţa | Approved | [31] |
Eolica Sǎcele | Eolica Dobrogea | 252 | Constanţa | Approved | [31] |
Eolica Sarichioi | Eolica Dobrogea | 102 | Tulcea | Approved | [31] |
Eolica Târguşor | Eolica Dobrogea | 36 | Constanţa | Approved | [31] |
Vetrişoaia | E.ON | 36 | Vaslui | Approved | [25] |
Eolus Vind | Eolus Vind | 30 | Constanţa | Approved | [34] |
Europp Galaţi | Europp Energocons | 33 | Galaţi | Approved | [16] |
Eximprod Galaţi | Eximprod Buzău | 70 | Galaţi | Approved | [16] |
Green Energy | Green Energy | 200 | Tulcea | Approved | [35] |
Liteni-Dolhasca | Ulli Rowind | 34 | Suceava | Under construction | [36] |
Market Expert Tulcea | Market Expert | 33 | Tulcea | Approved | [16] |
Mărişelu | Local authorities | 300 | Cluj | Approved | [37] |
Moldova Noua | Enel Green Power | 48 | Caraş-Severin | Commissioned | 2012[38] |
New Energy Constanţa | New Energy Group | 30 | Constanţa | Under construction | [39] |
New Energy Tulcea | New Energy Group | 20 | Tulcea | Approved | [39] |
Orşova | Toplet Energy | 35 | Mehedinţi | Under construction | [40][41] |
Romwind Constanţa | Romwind | 30 | Constanţa | Approved | [16] |
Sălbatica I | Enel Green Power | 70 | Tulcea | Commissioned | 2011[42] |
Sălbatica II | Enel Green Power | 70 | Tulcea | Commissioned | 2012[43] |
Sibioara | Sibioara Wind Farm | 42 | Vaslui | Approved | [16] |
Sinus Holding | Sinus Holding | 700 | Vaslui/Suceava/Neamţ | Approved | [15] |
Tarcău | Eolo Energy | 24 | Neamţ | Approved | [44] |
Tomis Team Dobrogea | Tomis Team | 600 | Tulcea/Constanţa | Under construction | [45] |
Valea Nucarilor | Enel Green Power | 70 | Tulcea | Commissioned | 2012[46] |
Văcăreni | Energie Investments Group | 240 | Tulcea | Proposed | [47] |
Verbund Casimcea | Verbund | 225 | Tulcea | Under construction | [48] |
Scobinti Iasi | ACK srl Romania | 40 | Scobinti-Iasi | Approved | [49] |
Moldova-Eolian srl Romania | 100 | Ruginoasa-Iasi | Proposed | [50] | |
Siminoc - Murfatlar | Zar Twins Energy | 45 | Constanta | Approved | |
Nalbant Tulcea | Philro Energia | 20 | Nalbant Tulcea | Approved | [51] |
Totals[]
Category status | Total capacity |
---|---|
Commissioned | 2,599 MW |
Under construction | MW |
Approved | MW |
Proposed | MW |
All Stages | MW |
See also[]
- Global Wind Energy Council
- World Wind Energy Association (WWEA)
- European Wind Energy Association
- Wind power
- Wind power in the European Union
- List of wind farms
- List of onshore wind farms
- List of large wind farms
- Wind turbine
- List of wind turbine manufacturers
- Wind power industry
References[]
- ^ EWEA (February 2014). "Wind in power: 2013 European statistics" (PDF). European Wind Energy Association. Retrieved 2014-11-05.
- ^ "Avalansa portugheza: Martifer pregateste o achizitie de 7 mil. euro pe eolian si un parc propriu, EDP primeste deja turbinele". Business Standard (in Romanian). 2009-04-01. Archived from the original on 2011-07-16. Retrieved 2009-04-02.
- ^ Cristian Matache (2008-08-21). "Prima centrală energetică eoliană din România va fi operaţională din 2009" (in Romanian). Gandul. Retrieved 2009-02-04.
- ^ Jump up to: a b Catalin Lupoaie (2008-08-27). "CEZ face energie eoliana cat un reactor de la Cernavoda". Ziarul Financiar (in Romanian). Retrieved 2009-02-03.
- ^ Sally Bakewell: "CEZ Commissions All GE Turbines at Europe’s Largest Wind Farm" in Bloomberg, 14 December 2012
- ^ Jump up to: a b "Investiţiile în energia eoliană rămân deocamdată la nivel de intenţie" (in Romanian). Mediafax. 2007-12-17. Retrieved 2009-08-18.
- ^ "Energia eoliana in Europa, de cinci ori puterea instalata a Romaniei" (in Romanian). www.ziare.com. 2007-09-07. Retrieved 2009-07-28.
- ^ http://www.adevarul.ro/financiar/Turbinele_eoliene_din_Romania_pot_functiona_la_30-_din_puterea_instalata_0_194380904.html
- ^ Mirona Hriţcu (2009-04-29). "Numai pentru milionarii în euro: afaceri cu energie eoliană" (in Romanian). Capital. Retrieved 2009-07-28.
- ^ "Enel: 280 MW din vant, in Tulcea". Business Standard (in Romanian). 2008-09-24. Archived from the original on 2012-07-29. Retrieved 2009-08-14.
- ^ "Cofra investeste 1,1 miliarde euro in centrale eoliene". Business Standard (in Romanian). 2007-08-31. Archived from the original on 2012-07-19. Retrieved 2009-02-03.
- ^ Roxana Petrescu (2008-02-13). "Dupa incercarea de preluare a Electrica Muntenia Sud, Iberdrola investeste 300 mil. euro in centrale eoliene". Ziarul Financiar (in Romanian). Retrieved 2009-08-18.
- ^ "Green Energy Grup, 300 milioane de euro pentru parcuri eoliene". Business Standard (in Romanian). 2007-08-23. Archived from the original on 2012-07-31. Retrieved 2009-08-18.
- ^ "Electrica vrea parteneri chinezi pentru investitii in eolian si hidro". Business Standard (in Romanian). Archived from the original on 2012-07-29. Retrieved 2009-08-18.
- ^ Jump up to: a b "Sinus Holding va construi parcuri de turbine eoliene de 700 MW in Moldova". Business Standard (in Romanian). 2008-07-03. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
- ^ Jump up to: a b c d e f "Cine sunt si cum rezista in criza micii jucatori din piata eolienelor". Business Standard (in Romanian). 2009-02-10. Archived from the original on 2011-07-16. Retrieved 2009-03-05.
- ^ "Un parc eolian de 80 MW, investitie de 130 milioane euro, va fi pus in functiune langa Ramnicu Sarat". Business Standard (in Romanian). 2009-03-17. Archived from the original on 2011-07-16. Retrieved 2009-06-11.
- ^ Simona Dobre (2008-11-04). "EDP face un parc eolian de 225 MW in circa doi ani". Business Standard (in Romanian). Archived from the original on 2012-03-01. Retrieved 2009-08-22.
- ^ "EDP va avea un prim parc eolian in functiune in Medgidia dupa o investitie de peste 100 mil. euro". Ziarul Financiar (in Romanian). 2009-10-21. Retrieved 2009-10-21.
- ^ "Cernavoda 110/33 kV Substation, Romania". GEDLux Sistemas de Control. 2011-05-31. Archived from the original on 2016-03-04. Retrieved 2013-07-23.
- ^ "Enel da startul productiei de energie verde cu un prim parc eolian de 34 MW langa Tulcea" (in Romanian). Wall Street. 2010-12-07. Retrieved 2012-12-16.
- ^ "Martifer face parc eolian pe 260 de hectare la Babadag". Ziarul Financiar (in Romanian). 2007-10-23. Retrieved 2009-08-18.
- ^ "Blue Investments va aloca 60 milioane de euro pentru un parc eolian in judetul Tulcea" (in Romanian). Financiarul. 2008-11-21. Archived from the original on 2009-01-08. Retrieved 2009-02-03.
- ^ Dan Odagiu (2008-11-20). "Românii fac un parc eolian gigantic". Cotidianul (in Romanian). Retrieved 2009-08-19.
- ^ Jump up to: a b c "E.ON investeste in prima transa pana la 170 mil. € in trei parcuri eoliene". Business Standard (in Romanian). 2008-09-23. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
- ^ Florin Dochita (2005-10-01). "Vintul de pe Calimani bate pentru buzunarele nemtilor". Cotidianul (in Romanian). Retrieved 2009-08-18.
- ^ "La Oraviţa a fost inaugurat primul parc eolian din vestul ţării" (in Romanian). Ziua de Vest. 2011-10-22. Retrieved 2012-12-16.
- ^ "Enel construieste un parc eolian de 70 MW in judetul Tulcea" (in Romanian). Energie Live. 2011-05-03. Archived from the original on 2012-03-23. Retrieved 2012-12-16.
- ^ Roxana Bucur (2008-09-25). "Un parc eolian de anvergură la Racoviteni" (in Romanian). Sansa Buzoiana. Retrieved 2009-08-22.
- ^ Roxana Petrescu (2008-06-18). "Electrica isi continua ofensiva pe regenerabile". Ziarul Financiar (in Romanian). Retrieved 2009-02-03.
- ^ Jump up to: a b c d e f g h i j k l m "Short Descriptions of Projects". Eolica Dobrogea (Schweiz) AG, Switzerland. Eolica Dobrogea. 2009-02-03. Archived from the original on 2009-02-10. Retrieved 2009-02-03.
- ^ Georgian Stoica (2008-08-15). ""Regele asfaltului" toarnă si un parc eolian" (in Romanian). Saptamana Financiara. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
- ^ BR Review: "Eolica Dobrogea administrator sues Transelectrica and ANRE for EUR 118 mln prejudice", February 21, 2012
- ^ "Eolus Vind intra cu 15 mil. € pe eolian". Business Standard (in Romanian). 2008-09-05. Archived from the original on 2011-07-16. Retrieved 2009-02-03.
- ^ "Green Energy şi-a amânat proiectul parcului eolian de 200MW din Tulcea, din cauza legislaţiei" (in Romanian). www.realitatea.ne. 2009-07-17. Retrieved 2009-07-30.
- ^ "Cel mai mare parc eolian din tara, la Suceava" (in Romanian). Financiarul. 2009-03-07. Retrieved 2009-08-18.
- ^ Cosmina FERNOAGĂ. "Parc energetic eolian pe 100 ha la Mărişel" (in Romanian). Ziua de Cluj. Retrieved 2009-02-03.
- ^ "Enel Green Power commissions 48MW wind farm in Romania". ReCharge. 2012-08-30. Retrieved 2012-12-16.
- ^ Jump up to: a b Adrian Stoica (2007-06-11). "Nemtii cred in potentialul eolian al Dobrogei" (in Romanian). Romania Libera. Retrieved 2009-02-03.
- ^ "Romanian economic highlights" (PDF). Ministry of Foreign Affairs. 2009-05-04. Retrieved 2009-02-03.[permanent dead link]
- ^ Iulian Gogonea (2008-09-26). "Vântul aduce investiţii de milioane la Orşova" (in Romanian). Adevarul. Archived from the original on 2009-06-30. Retrieved 2009-08-18.
- ^ "Un nou parc eolian a devenit functional in Romania" (in Romanian). Hotnews. 1 July 2011. Retrieved 17 December 2012.
- ^ "Enel inaugurated 70 MW wind farm in Northern Dobrogea". Business Review. 2011-10-21. Retrieved 2012-12-16.
- ^ "Mori de vânt şi hidrocentrale pe Valea Tarcăului" (in Romanian). Financiarul. 2009-02-03. Retrieved 2009-02-03.
- ^ "Tomis Team va dezvolta cel mai mare parc eolian din România, de 600 MW" (in Romanian). money.ro. 2008-08-20. Archived from the original on 2012-08-05. Retrieved 2009-08-19.
- ^ "Enel inaugurates 70 MW wind park in Tulcea". Business Review. June 26, 2012. Retrieved 6 November 2013.
- ^ "Gică Popescu intră în afacerile pe eolian" (in Romanian). Business Magazin. Archived from the original on 2009-12-17. Retrieved 2009-09-22.
- ^ "Verbund a investit 380 milioane de euro in parcul eolian Casimcea" (in Romanian). business24.ro. 6 June 2013. Retrieved 10 December 2013.
- ^ "ACK srl" (in Romanian). Retrieved 2009-02-03.
- ^ "Moldova Eolian srl" (in Romanian). Retrieved 2010-02-03.[permanent dead link]
- ^ "Parc Fotovoltaic Nalbant Romania" (in Romanian). Retrieved 2010-02-03.
External links[]
Media related to Wind power in Romania at Wikimedia Commons
- Wind farms in Romania
- Lists of wind farms by country
- Lists of buildings and structures in Romania