West Harbour GO Station

From Wikipedia, the free encyclopedia

GO Transit logo.svg West Harbour
Hamilton Harbour Station - Overpass.jpg
Location353 James Street North
Hamilton, Ontario
Canada
Coordinates43°16′00″N 79°51′58″W / 43.26667°N 79.86611°W / 43.26667; -79.86611Coordinates: 43°16′00″N 79°51′58″W / 43.26667°N 79.86611°W / 43.26667; -79.86611
Owned byMetrolinx
Platforms2 side platforms
Tracks2
ConnectionsBSicon BUS1.svg Hamilton Street Railway
Construction
Parking300 spaces
Bicycle facilitiesYes
Other information
Station codeGO Transit: WR
History
OpenedJuly 9, 2015 (2015-07-09)
Services
Preceding station GO Transit logo.svg GO Transit Following station
Aldershot Lakeshore West Terminus
Lakeshore West
Express
St. Catharines

West Harbour GO Station is a regional rail station in the North End neighbourhood of Hamilton, Ontario, Canada.[1] The station has been served by GO Transit's Lakeshore West line since July 9, 2015.[2] Via Rail service may eventually be provided.[3]

History[]

CN James Street Station[]

Former CNR station building

The neighbouring Hamilton Canadian National Railway Station, on the east side of James Street North at Murray Street, was built between 1929 and 1931.[4]

The property is a National Historic Site and has been designated under the Federal Heritage Railway Stations Protection Act and under Part IV of the Ontario Heritage Act by City of Hamilton By-law 95-115.[5] Portions of the building were protected by the Ontario Heritage Trust in 1999.[4]

In 1967, GO Transit took over CN's commuter service between Toronto and Hamilton, and in 1978 all other CN passenger service was transferred to Via Rail.[6]

In 1992 Via Rail closed its Burlington (formerly the GTR/CNR Freeman/Burlington Junction Station, built around 1910 and located near Brant Street), Hamilton and Dundas stations and consolidated service at the new Aldershot GO Station.[6]

GO Transit closed the James Street station in 1993 and moved remaining service to the Hamilton GO Centre,[6] one and a half kilometres directly south on James Street.

The Laborers' International Union of North America (LIUNA) bought and renovated the station, and in 2000 the station was reopened as LIUNA Station, an events centre with catering facilities for weddings, dances, and other special events.[6]

GO West Harbour Station[]

Plans for a new station on the CN line through Hamilton were announced on May 31, 2013, by Ontario's Minister of Transportation.[7] Construction was estimated to cost $3 million[3] and phase one was completed in time for the 2015 Pan American Games.[8] Construction of phase two was proposed to begin in August 2015 after the games are over. Metrolinx announced on February 28, 2014, that Kenaidan Contracting of Mississauga had been awarded a $44-million contract to build the station.[9]

The station opened on July 9, 2015, and was initially served by two round trips per weekday, as well as special services related to the 2015 Pan-Am Games. In 2019, regular service was doubled to four round trips per day, of which one trip operated through to and from Niagara Falls.[10][11]

On August 7, 2021, West Harbour station became the western terminus for all-day local services on the Lakeshore West line, when one train per hour was extended westward to West Harbour.[12]

Service[]

On weekdays and weekends, Lakeshore West local trains operate hourly from West Harbour to Oshawa GO Station via Union Station.[13] On weekdays, West Harbour is also served by one daily express train operating between Niagara Falls and Toronto.[14] The weekend GO train service between Niagara Falls and Toronto passes by West Harbour station without stopping. [14]

GO bus route 18K connects with select train arrivals, with service to Brock University via St. Catharines station.[13] The station is also served by Hamilton Street Railway (HSR) bus routes 4 Waterfront and 20 A-Line Express on James Street North.

Future[]

Rail tracks past Burlington GO Station are owned by CN Rail. This has added a greater degree of uncertainty to passenger rail expansion as all service changes need approval by CN who operate freight rail along the same corridor. Infrastructure upgrades completed in 2020 at the Hamilton Junction have relieved a bottleneck and allowed the introduction of all-day hourly passenger rail service to the station.[15]

As part of the Province's GO Expansion program, the Lakeshore West corridor will be electrified between Union Station and Aldershot allowing the operation of electric trains at frequencies of 15 minutes or better all day. Electrification beyond Aldershot toward Hamilton is not planned and was excluded from the GO Expansion environmental assessment completed in 2017.[16] Instead, diesel trains will continue to serve West Harbour at a peak period frequency of 30 minutes and the current 60 minute frequency off peak and weekends between Confederation GO Station and Union Station.[17]

Currently, West Harbour GO Station has two stub-ended tracks with platforms on the south side the mainline. GO trains between Toronto and Niagara Falls must reverse either in or out of the station, a maneuver that adds 20 minutes to the schedule. In order to eliminate this 20-minute maneuver, Metrolinx plans to extend the stub tracks to reconnect with the mainline east of the station. This would facilitate service to the future Confederation GO Station and to Niagara Falls GO Station.[18]

See also[]

References[]

  1. ^ "West Harbour (James St. N.) - New Hamilton GO Station". GO Transit. Archived from the original on March 4, 2016.
  2. ^ "First commuters ride GO from Hamilton's new West Harbour station". CBC News. July 9, 2015. Retrieved July 11, 2015.
  3. ^ a b "James Street North GO/VIA Station Gateway to Niagara". Quick Wins. Metrolinx. Retrieved November 1, 2012.
  4. ^ a b "Hamilton CNR Station". Canada's Historic Places. Parks Canada. Retrieved November 1, 2012.
  5. ^ "List of Designated Properties and Heritage Conservation Easements under the Ontario Heritage Act" (PDF). Hamilton's Heritage, Volume 1. City of Hamilton. March 2007 [August 2002]. Retrieved November 1, 2012.
  6. ^ a b c d "CNR James Street Station/LIUNA Station". Hamilton Transit History. Retrieved November 1, 2012.
  7. ^ "An official GO for GO station on James North". CBC News. May 31, 2013. Retrieved June 1, 2013.
  8. ^ GO Transit’s new Hamilton station opens Railway Age July 17, 2015
  9. ^ Meredith MacLeod (February 28, 2014). "Metrolinx announces $44-million GO Station on James Street North". Hamilton Spectator. Retrieved February 28, 2014.
  10. ^ Paddon, Natalie (August 16, 2019). "More trains coming to West Harbour GO". The Hamilton Spectator. Retrieved July 26, 2021.
  11. ^ "Lakeshore West schedule 2019" (PDF). GO Transit. January 5, 2019. Retrieved May 20, 2019.
  12. ^ "Ontario Introduces Hourly GO Train Service Between West Harbour GO Station and Union Station". news.ontario.ca. Retrieved July 26, 2021.
  13. ^ a b "Lakeshore West Timetable" (PDF). gotransit.com. GO Transit. September 4, 2021. Retrieved September 1, 2021.
  14. ^ a b "Lakeshore West Niagara Timetable" (PDF). gotransit.com. GO Transit. September 4, 2021. Retrieved September 1, 2021.
  15. ^ Metrolinx (June 23, 2020). "Getting rid of the 'bottlenecks' – Here's how GO Expansion of infrastructure through the Hamilton Junction area is moving ahead". Retrieved October 8, 2021.
  16. ^ "GO Rail Network Electrification". Retrieved October 8, 2021.
  17. ^ "Infrastructure Ontario Issues RFP for Massive GO Rail Expansion". May 31, 2019. Retrieved October 8, 2021.
  18. ^ "How a new track at Aldershot GO helps unlock train service into Hamilton". Metrolinx. November 5, 2021. Archived from the original on November 6, 2021.

External links[]

Media related to West Harbour GO Station at Wikimedia Commons

Retrieved from ""