Lakeshore West line

From Wikipedia, the free encyclopedia

Lakeshore West
GO Lakeshore West logo.svg
Lakeshore West GO Train Westbound.jpg
A Lakeshore West line GO Transit train westbound past Exhibition in Toronto
Overview
OwnerMetrolinx
Canadian National Railway
Canadian Pacific Railway
LocaleToronto, Mississauga, Oakville, Burlington, Hamilton, Grimsby, St. Catharines, Niagara Falls
Stations15 (plus 1 under construction)
Service
TypeCommuter rail
SystemGO Transit rail services
Operator(s)GO Transit
Daily ridership33,500 (2019)[1]
History
OpenedMay 23, 1967 (1967-05-23)
Technical
Line length132 km (82 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed153 km/h (95 mph)[2] (speed limit)
150 km/h (93 mph)[3] (locomotive max)
Route map

Legend
km
GO Transit logo.svg GO Lakeshore East logo.svg GO Stouffville logo.svg GO Richmond Hill logo.svg
0
Union
VIA Rail Canada simplified.svg BSicon SUBWAY.svg BSicon CLRV.svg
North Bathurst Yard
GO Transit logo.svg GO Milton logo.svg GO Kitchener logo.svg GO Barrie logo.svg
3.2
Exhibition
8.2
9.2
10.8
Mimico
Willowbrook Yard
15.4
Long Branch
20.6
Port Credit
Hurontario LRT
21.2
26.9
Clarkson
Peel Region
Halton Region
34.4
Oakville
VIA Rail Canada simplified.svg
Sixteen Mile Creek
39.8
Bronte
41.5
44.9
Appleby
51.5
Burlington
52.5
Burlington Junction
55.7
Aldershot
VIA Rail Canada simplified.svg
Halton Region
Hamilton
59.9
Hamilton Junction
60.0
Hunter Street tunnel
63.2
Hamilton GO Centre
GO bus symbol.svg
Hamilton Yard
63.1
West Harbour
72.3
Confederation
86.3
Grimsby GO
89.5
VIA Rail Canada simplified.svg
Jordan Harbour
114.6
St. Catharines
VIA Rail Canada simplified.svg
132.6
Niagara Falls
VIA Rail Canada simplified.svg

Lakeshore West is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Hamilton, with occasional trips extending to St. Catharines and Niagara Falls.

History[]

The Lakeshore West line is the oldest of GO's services, opening as part of the then-unified Lakeshore line on GO Transit's first day of operations on May 23, 1967.[4] The first train, numbered 946 left at 5:50 am from Oakville bound for Toronto, ten minutes before service began out of Pickering.[5] During the three-year experiment, all day GO Train service ran hourly from Oakville to Pickering with limited rush hour train service to Hamilton. The experiment proved to be extremely popular; GO Transit carried its first million riders during its first four months, and averaged 15,000 per day soon after.[6][7]

Service began running west from Union, stopping at Mimico, Long Branch, Port Credit, Lorne Park, Clarkson, and Oakville. Rush-hour trains ran to Bronte, Burlington and Hamilton, at the former CN railway station at James Street.

GO trains started serving the Canadian National Exhibition in August 1967 from an older platform just west of the Dufferin Street bridge over the Lakeshore West line and the Queen Elizabeth Way. For the 1968 Exhibition season, temporary booths were set up to handle passengers, which topped 24,000 on the season's busiest day. This prompted the need for a proper station with additional capacity, and by the 1968 Royal Agricultural Winter Fair, the current Exhibition GO Station was built and put in service.[6]

Lorne Park Station closed within the first year of the line's operation. Burlington was re-located approximately 750 metres eastward in March 1980. Appleby GO Station opened on September 19, 1988, followed by Aldershot on May 25, 1992. The opening of Aldershot coincided with the extension of all day and weekend service from Oakville to Burlington, however, this was reversed due to budget cuts on July 3, 1993.[6]

On April 29, 1996, was replaced by the Hamilton GO Centre. All day service to Burlington was restored on May 1, 2000, and extended to Aldershot on September 7, 2007.[6] On June 29, 2013, all day service was increased to operate trains every 30 minutes.[8]

A third track was added between Sixteen Mile creek and the Port Credit station. Combined with additional work undertaken since the early 1990s, this gives the Lakeshore West line at least three tracks from Union Station through to Bayview Junction.

In 2009 as a pilot project, GO began operating express trains to St. Catharines and Niagara Falls on weekends and holidays during Niagara Region's busy summer tourist season. The service was provided again during the 2010 season, and was officially made permanently recurring starting in 2011.[9] In 2019, the weekend express service began operating year-round.[10]

West Harbour GO Station opened in July 2015, serving as a second Hamilton terminus for rush-hour train service.[11] This new station was built adjacent to the former CNR James Street station used by GO until 1996. In August 2021, all-day service was extended to this station.[12]

On January 7, 2019, one weekday round-trip was extended beyond West Harbour station to Niagara Falls.[13]

Service[]

On weekdays, local service operates every 15 minutes east of Oakville, every 30 minutes east of Aldershot, and every 60 minutes at West Harbour.[14] In addition, five daily express trains operate during peak periods, of which four operate between Toronto and Hamilton GO Centre,[14] and one operates between Toronto and Niagara Falls.[15]

On weekends, local service operates every 30 minutes between Union and Aldershot, and every 60 minutes between Aldershot and West Harbour. Four express trains per day operate between Toronto and Niagara Falls.[15]

All off-peak local trains, as well as some peak trains, are through-routed with the Lakeshore East line to Oshawa.[14]

Four GO bus routes are considered to be part of the Lakeshore West corridor:

Future[]

As part of the 2008 Metrolinx regional transportation plan entitled The Big Move, the agency identified an express all-day service between Hamilton and Oshawa (via Toronto Union) as one of its top 15 priorities.[16] Metrolinx has also committed to eventually providing service every 15 minutes on the line, as well as electrifying railways. This project, dubbed Regional Express Rail, is expected to reduce some trip times by 20%.[17][18]

In early 2019, Niagara Falls, New York officials expressed interest in having GO Transit expand rail service over the border to the Niagara Falls station in New York.[19] Metrolinx stated that there are specific restrictions when a train leaves Ontario, or any province in Canada, that require a different set of inspection criteria and standards in order to legally enter the United States which would make a stop at the station difficult.[20]

Niagara Region[]

Metrolinx is currently planning to expand rail service between Hamilton and Niagara Falls.[21] The project includes two new stations, two upgraded stations, and more than 25 kilometres of new track.[21] Originally planned for completion in 2023, Metrolinx halted the delivery process for the stations in the Niagara extension in November 2018 when the newly-elected Government of Ontario rescinded its funding for their construction. In order to be constructed, the stations would instead be dependent on private financing.[22]

In 2015, Confederation GO Station (in East Hamilton, near Stoney Creek) was announced with a completion date of 2019.[23][24] As of 2021, a bus loop has opened on the site but construction on the rail station has not yet begun.[25]

In June 2016, Ontario Minister of Transportation Steven Del Duca announced that regular service would be extended to Grimsby, with the Grimsby GO Station announced to open in 2021.[26] In 2023, enhanced service was then-expected to begin to the St. Catharines and Niagara Falls Via Rail stations which will be upgraded to support increased GO service.[27]

Ownership[]

In order to facilitate service expansions, GO Transit's parent agency Metrolinx has gradually acquired portions of the Lakeshore West corridor from the freight railway companies Canadian National Railway (CN) and Canadian Pacific Railway (CP). Most of the Lakeshore West line operates along the Oakville subdivision, which was entirely owned by CN prior to 1998.[28]

On March 31, 2010, GO acquired its first segment of the Oakville subdivision, between Union Station and 30th Street in Etobicoke (just west of GO's Willowbrook Rail Maintenance Facility).[29] On March 27, 2012, GO purchased a second segment immediately to the west, extending its ownership to a point just west of Fourth Line in Oakville.[30] On March 22, 2013, Metrolinx purchased a third segment extending its ownership westward to a point just west of Burlington station, where the CN Halton Subdivision joins the line.[31]

In addition to the Union Station Rail Corridor, these three segments represent Metrolinx's current ownership of the line. CN continues to own the tracks between Burlington and the Desjardins Canal, as well as the Grimsby subdivision that carries trains into Niagara Region. CP owns the tracks between the Desjardins Canal and the Hamilton GO Centre.[32]

Station list[]

Most off-peak trains, as well as some peak trains, continue as part of the Lakeshore East line after stopping at Union Station, with no train change required.

Service legend
Local Operates at all times
Express Operates on weekday peak periods in the peak direction
Weekend Express Operates only on weekends
Station Municipality Services Connections Notes
Local Express Weekend
Express
Union Toronto VIA Rail Canada simplified.svg Canadian/Corridor/Maple Leaf
GO Transit logo.svg GO Lakeshore East logo.svg GO Milton logo.svg GO Kitchener logo.svg GO Barrie logo.svg GO Richmond Hill logo.svg GO Stouffville logo.svg GO bus symbol.svg
UP Express logo.svg
BSicon SUBWAY.svg TTC - Line 1 - Yonge-University-Spadina line.svg BSicon CLRV.svg BSicon BUS1.svg TTC
Through service to the Lakeshore East line
Exhibition | BSicon CLRV.svg BSicon BUS1.svg TTC
Mimico | | BSicon BUS1.svg TTC
Long Branch | | BSicon CLRV.svg BSicon BUS1.svg TTC
Bus interchange MiWay
Port Credit Mississauga | Bus interchange MiWay Future connection to Hurontario LRT
Clarkson | Bus interchange MiWay
Bus interchange Oakville Transit
Oakville Oakville VIA Rail Canada simplified.svg Corridor/Maple Leaf
GO Transit logo.svg GO bus symbol.svg
Bus interchange Oakville Transit
Bronte | Bus interchange Oakville Transit
Appleby Burlington | Bus interchange Burlington Transit
Bus interchange Oakville Transit
Burlington GO Transit logo.svg GO bus symbol.svg
Bus interchange Burlington Transit
Aldershot VIA Rail Canada simplified.svg Corridor/Maple Leaf
GO Transit logo.svg GO bus symbol.svg
Bus interchange Burlington Transit
Bus interchange Hamilton Street Railway
Hamilton Hamilton GO Transit logo.svg GO bus symbol.svg
Bus interchange Hamilton Street Railway
Bus service only during off-peak, future pedestrian connection to Hamilton LRT
West Harbour | GO Transit logo.svg GO bus symbol.svg
Bus interchange Hamilton Street Railway
Confederation | | GO bus symbol.svg
Bus interchange Hamilton Street Railway
Bus service began in 2019[33]
Rail service beginning TBD
Grimsby Grimsby | | TBD Opening TBD[34]
St. Catharines St. Catharines VIA Rail Canada simplified.svg Maple Leaf
St. Catharines Transit
Limited commuter trains on weekdays
Limited excursion trains on weekends
Niagara Falls Niagara Falls VIA Rail Canada simplified.svg Maple Leaf
GO Transit logo.svg GO bus symbol.svg
Niagara Falls Transit
WEGO Niagara Falls Visitor Transportation

References[]

  1. ^ "Ridership Performance" (PDF). Metrolinx. September 2019. Retrieved November 20, 2019.
  2. ^ "Railway Investigation". Transportation Safety Board of Canada. June 10, 2013. Retrieved October 25, 2020.
  3. ^ "Quick Facts: GO Trains (Sept 2012)" (PDF). GO Transit. Archived from the original (PDF) on April 19, 2014. Retrieved November 4, 2012.
  4. ^ GO celebrates 40 years of success
  5. ^ GO 50th Anniversary
  6. ^ Jump up to: a b c d Garcia et al.: Lakeshore corridor
  7. ^ Sergeant, Ch.4: Buying the trains.
  8. ^ Kalinowski, Tess (April 19, 2013). "GO trains to run every 30 minutes all day on Lakeshore lines". Toronto Star. Toronto Star Newspapers. Retrieved April 19, 2013.
  9. ^ "Summer GO Train Permanent". Niagara This Week. April 15, 2011. Retrieved May 20, 2019.
  10. ^ Staff (August 15, 2019). "Metrolinx adding 84 new weekly GO train trips in GTHA". The Canadian Press. Global News. Retrieved August 16, 2019.
  11. ^ "First commuters ride GO from Hamilton's new West Harbour station". CBC News. April 9, 2015. Retrieved July 15, 2015.
  12. ^ "Ontario Introduces Hourly GO Train Service Between West Harbour GO Station and Union Station". news.ontario.ca. Retrieved July 26, 2021.
  13. ^ "New GO train service to Niagara". CBC News. January 6, 2019. Retrieved May 20, 2019.
  14. ^ Jump up to: a b c d "Lakeshore West Timetable" (PDF). gotransit.com. GO Transit. September 4, 2021. Retrieved September 1, 2021.
  15. ^ Jump up to: a b c "Lakeshore West Niagara Timetable" (PDF). gotransit.com. GO Transit. September 4, 2021. Retrieved September 1, 2021.
  16. ^ The Big Move Archived June 18, 2010, at the Wayback Machine, Section 5.2: The first 15 years. Retrieved July 23, 2010
  17. ^ Lakeshore West GO line
  18. ^ Tess Kalinowski, Transportation reporter (April 17, 2015). "GO to add almost 50 per cent more trains in next 5 years". Toronto Star. Retrieved March 30, 2016.
  19. ^ rick.pfeiffer@niagara-gazette.com, Rick Pfeiffer. "Falls officials want to bring Canadian commuter train across the border". Niagara Gazette. Retrieved January 3, 2020.
  20. ^ "Niagara Falls, N.Y. mayor says he wants a GO Train across the border | The Star". thestar.com. January 30, 2019. Retrieved January 3, 2020.
  21. ^ Jump up to: a b "Metrolinx: For a Greater Region - Niagara". www.metrolinx.com. Retrieved March 23, 2018.
  22. ^ LaFleche, Grant; Sawchuk, Bill (November 30, 2018). "Grimsby GO station plan 'will be stopped'". The St. Catharines Standard. Retrieved January 2, 2019.
  23. ^ "Ontario Investing Up to $1 Billion for Light Rail Transit in Hamilton". Ontario Newsroom. May 26, 2015. Retrieved August 9, 2021.
  24. ^ "Hamilton to get a new LRT and GO Train station". Toronto Star. May 26, 2015. Retrieved August 9, 2021.
  25. ^ Werner, Kevin (April 1, 2020). "Confederation GO bus service hits the ground running with service to area transit loop". HamiltonNews.com. Retrieved August 9, 2021.
  26. ^ "Work begins in 2017 on GO train expansion into Niagara". The Canadian Press. June 28, 2016. Retrieved December 6, 2016.
  27. ^ "Boards for St Catharines" (PDF). Metrolinx. Retrieved March 23, 2018.
  28. ^ http://www.metrolinx.com/en/docs/pdf/board_agenda/20130627/20130627_BoardMtg_GO_Transit_Update_EN.pdf
  29. ^ http://www.newswire.ca/en/story/711421/cn-sells-commuter-rail-line-segment-west-of-toronto-union-station-to-metrolinx-for-c-168-million
  30. ^ "CN - CN sells Greater Toronto Area rail lines to Metrolinx for GO Transit services". newswire.ca.
  31. ^ "CN - CN sells Oakville-Burlington, Ont., line segment to Metrolinx for GO Transit commuter rail service". newswire.ca.
  32. ^ Metrolinx Rail Corridor Ownership
  33. ^ "Stoney Creek Public Meeting Presentation Boards" (PDF). Metrolinx Engage. November 27, 2017. p. 8. Retrieved January 5, 2018.
  34. ^ "New Weekday GO Rail Service Planned Between Hamilton and the Niagara Region". News Release. Ministry of Transportation. June 28, 2016. Retrieved June 28, 2016. a new station on Casablanca Boulevard in Grimsby

General references[]

Bibliography[]

External links[]

Retrieved from ""