Barrie line

From Wikipedia, the free encyclopedia
Barrie
GO Barrie logo.svg
Car 2029 at Barrie South Platform.jpg
The Barrie South platform with BiLevel coach 2029
Overview
OwnerMetrolinx
LocaleToronto; Vaughan; King City; Aurora;
Newmarket; East Gwillimbury;
Bradford; Barrie
Stations12
Service
TypeCommuter rail
SystemGO Transit rail services
Operator(s)GO Transit
Daily ridership17,000 (2014)[1]
History
OpenedSeptember 7, 1982
Technical
Line length101.4 km (63.0 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed80 miles per hour (130 km/h) [2]
hide
Route map

Legend
101.4
Allandale Waterfront
Barrie Yard
95.0
Barrie South
83.7
Innisfil
66.4
Bradford
57.4
East Gwillimbury
55.0
Newmarket
Viva yellow.svg
Mulock
48.1
Aurora
36.5
King City
Kirby
29.5
Maple
26.8
Rutherford
20.8
Snider Junction
Canadian National Railway
19.8
York University (permanently closed)
17.1
Downsview Park
BSicon SUBWAY.svg TTC - Line 1 - Yonge-University-Spadina line.svg
Caledonia
BSicon TRAM.svg TTC - Line 5.svg
Davenport Diamond
Canadian Pacific Railway
Bloor–Lansdowne
BSicon SUBWAY.svg TTC - Line 2 - Bloor-Danforth line.svg
North Bathurst Yard
Spadina–Front
0.0
Union VIA Rail Canada simplified.svg GO bus symbol.svg TTC - Line 1 - Yonge-University-Spadina line.svg BSicon CLRV.svg BSicon BUS1.svg
GO Transit logo.svg Lakeshore East line GO logo.png Richmond Hill line GO logo.png Stouffville line GO logo.png

Barrie is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its 101.4 kilometres (63.0 mi) route.[2] From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford Station until the opening of Barrie South Station.

The Barrie Line runs on the former Northern Railway of Canada route. This is the oldest operating railway line in Ontario, with passenger service beginning in 1853.[3]

History[]

In 1852, construction began on the Ontario, Simcoe and Huron Railway, which would run from Toronto to Collingwood.[4] The line opened on May 16, 1853, when passenger train service began operating between Toronto and Aurora (then Machell's Corners).[3] On October 11, 1853, service was extended to Allandale, then opposite Barrie on the south shore of Kempenfelt Bay.[5]

In 1888, the Grand Trunk Railway took over operation of the line.[3] In 1923, the bankrupt Grand Trunk Railway was merged into the Canadian National Railway (CNR) network.

Commuter service planning[]

In 1968, MPP William Hodgson introduced a private member's bill to move that the government of Ontario establish GO Transit services north of Metro Toronto.[6] That year, a community group known as the GO North Committee distributed "GO North" stickers for motorists to adhere to their automobile's windshield to advocate for GO Transit commuter rail service north of Toronto.[7]

Planning for commuter services resulted in the establishment of the Newmarket Bus Terminal by 1970, from which commuters would be taken to the Richmond Hill GO Station to commute to Toronto.[8]

John Crawford Medcof, operating a company named Railroad Boosters, rented a train for one-day service between Barrie and Toronto on 16 October 1969,[9][10] earning a profit.[11] He gave the proceeds to the government of Ontario to support a north GO train service promised by John Robarts in late 1969, but asked for the government to return the money when the provincial government announced it would not establish a Richmond Hill line service in 1970.[12][10] He applied for a grant of C$97,200 from the federal government to operate a commuter train for twelve weeks, with one train leaving Barrie in the morning for Toronto, and a return trip at night.[11] The grant was approved per the government's local initiatives program in December 1971.[11] The train was operated by Canadian National Railways, and charged the same fares as those for the GO Transit bus service.[11] Another trial commuter service from Barrie to Toronto was operated in late 1972, carrying 13,483 passengers.[13]

In 1973, the Canadian Transport Commission held a public hearing at Georgian College[13] during which its three-member committee heard presentations from Medcof and councillors from all "municipalities between Toronto and Barrie".[14] All presentations favoured the creation of commuter train service between the two cities, including that of York—Simcoe MP Sinclair Stevens.[14]

On April 1, 1972, CN introduced commuter service from Barrie to Toronto, as required by the Canadian Transport Commission. The service was transferred to Via Rail in 1978.[15] As a result of federal government financial cutbacks to Via Rail, the service was transferred to the provincial government and integrated into the GO Transit network on September 7, 1982, but service only extended to Bradford.[15] On September 17, 1990, the line was extended to Barrie, but was again cut back to Bradford on July 5, 1993.

Service expansion[]

On September 8, 1998, GO Transit added a second daily round trip to the line. In the early 2000s, GO Transit opened three new stations on the line: Rutherford on January 7, 2001;[15] York University on September 6, 2002;[16] and East Gwillimbury on November 1, 2004.[17] In 2006, the number of daily trains on the line doubled again to four in each direction.[18]

In 2006, GO Transit built a bridge at the Snider diamond,[19] which is the junction between the Barrie Line and Canadian National's primary east-west freight line, the York Subdivision. Since CN controlled both corridors, the passage of passenger trains over the diamond was often delayed by freight trains passing through the intersection. Constructing the bridge and associated trackage resulted in a grade separation of the two lines, eliminating such delays. Construction of the bridge began in February 2006, and the bridge was opened in December 2006. The entire project was completed in June 2007.[20]

On December 17, 2007, the Bradford Line was extended to the new Barrie South GO Station and was renamed the "Barrie Line".[21] Construction had begun on February 2, 2007 to construct the new Barrie South station, a new layover facility and new tracks, signals and crossings along the existing 20 kilometres (12 mi) railway corridor. The project cost $25 million, funded by two thirds by the federal and provincial governments, and one third by the City of Barrie.[22]

On December 15, 2009, Metrolinx purchased the portion of the Newmarket Subdivision within the City of Toronto from CN for $68 million. The Barrie line trackage, from Union Station to Barrie, is now fully owned by Metrolinx. As part of the agreement, the Canadian National Railway continues to serve five freight customers located on the Newmarket subdivision between Highway 401 and the CN York Subdivision.

On January 30, 2012, the Barrie line was extended north to the newly constructed Allandale Waterfront GO Station.[23]

In the summer of 2012, a pilot train service was introduced on weekends and holidays between June and September.[24] Two trains in each direction completed the entire route, while an additional four trains ran between Union Station and East Gwillimbury GO station.[25] The summer service cost C$520,000 to operate, including train crews, safety and enforcement, station staffing and fuel.[26] Bidirectional weekend service was offered again in summer 2013, with four trains in each direction covering the entire route from Toronto to Barrie, making all stops and having a bus connection at Rutherford GO Station for non-stop service to Canada's Wonderland.[26][27] It cost C$400,000 to operate.[26] For the summers of 2014, 2015 and 2016, the same train service was provided, but without non-stop buses to Canada's Wonderland, requiring those passengers to transfer instead to York Region Transit local bus service at Maple GO Station.[28]

On December 31, 2016, year-round weekend train service was introduced with service every 75 minutes in both directions between Toronto and Aurora, including three daily trains per direction covering the full route between Toronto and Barrie.[29]

On December 30, 2017, the Downsview Park GO Station (an intermodal station intersecting with the Toronto Transit Commission's (TTC) new Line 1 Yonge-University subway extension) opened, and service to York University station was correspondingly reduced to peak hours only.[30][31] At the same time, the Barrie line's weekend train service was improved to every 60 minutes between Union and Aurora, and new hourly weekday off-peak service was introduced between Union and Aurora, as well as additional peak period trains between Union Station to Bradford GO Station.[32] Although the station was intended to entirely replace York University GO Station, limited peak-period service was maintained to York University station following the opening of Downsview Park station.

Due to the temporary closure of the York University campus during the COVID-19 pandemic in Toronto, all service to York University GO Station was suspended on March 18, 2020.[33] On July 19, 2021, Metrolinx announced that the station was permanently closed.[34]

Stations[]

The Aurora station building is a federally designated heritage site

There are 10 stations on the Barrie line, excluding the terminus at Union Station in Toronto.

In addition to Union Station, four station buildings along the Barrie Line are federally protected by the Heritage Railway Stations Protection Act. At Allandale Waterfront and Newmarket stations, historic station buildings remain but are used for other purposes, while at Aurora and Maple stations, the historic stations buildings continue to be in use.[35] The station building at King City was built in 2005; the 1850s building was relocated to Black Creek Pioneer Village in the 1960s, then to King Township Museum in 1989. Bradford station is not protected and has been heavily altered.

Station Opened Parking spots Notes
Allandale Waterfront January 28, 2012 120 Federally designated heritage railway station built in 1904–1905 for Grand Trunk Railway (GTR).
Barrie South December 17, 2007 628
Bradford September 7, 1982 93 GTR Bradford Station built in 1900 has been heavily altered from original design.
East Gwillimbury November 1, 2004 637
Newmarket September 7, 1982 265 Federally designated heritage railway station was GTR station c. 1900. Northern Railway of Canada station from 1850s became freight shed and demolished.
Aurora September 7, 1982 1,464 Federally designated heritage railway station built by GTR in 1900.
King City September 7, 1982 555 Original 1853 Northern Railway of Canada station moved to King Township Museum in 1989 and current station built in 2005.
Maple September 7, 1982 1,319 Federally designated heritage railway station built by GTR in 1903.
Rutherford January 7, 2001 970
Downsview Park December 30, 2017[36] 0 Connection to TTC - Line 1 - Yonge-University-Spadina line.svg Yonge–University
Caledonia Est. 2024[37] Connection to future TTC - Line 5.svg Eglinton
Bloor–Lansdowne Proposed station[38]
Union September 7, 1982 0 Connection to VIA Rail Canada simplified.svg Via Rail, AmtrakAmtrak, UP Express logo.svg Union Pearson Express, GO Transit logo.svg GO Transit rail & bus services, and TTC TTC - Line 1 - Yonge-University-Spadina line.svg Yonge–University, BSicon CLRV.svg streetcar & BSicon BUS1.svg bus services.

Federally designated heritage railway station, built by Toronto Terminals Railway opened in 1927

Service[]

As of November 2019, the Barrie line has weekday service consisting of seven trains southbound from Barrie and three trains southbound from Bradford in the morning, and seven trains northbound to Barrie and two trains northbound to Bradford from Union Station in the afternoon.[39] The line also has hourly, two-way service between Union and Aurora during off peak times.

Weekend service consists of hourly trains in both directions. Five trips in each direction cover the full route from Toronto to Barrie, while the remainder operate between Toronto and Aurora. Trips terminating in Aurora have connecting GO bus service to Barrie.[39]

During the times and directions that train service does not operate, service is provided by GO bus routes 63 (Toronto–King City), 65 (Toronto–Newmarket) and 68 (Newmarket–Barrie).[39]

The maximum speed on the line is 128 kilometres per hour (80 mph), between Bradford and Barrie South.[2] Trains are limited to 24 kilometres per hour (15 mph) in some parts, but can travel at least 80 kilometres per hour (50 mph) over most of the line.[2]

Due to the 2019-20 coronavirus pandemic, starting on May 13, 2020, most off-peak train service was be suspended and replaced with buses due to low ridership.[40] Off-peak train service was gradually reintroduced throughout 2021.

Connections[]

The Barrie line makes connections with:

Future[]

Capacity expansion[]

Second track under construction in 2015 between Rutherford and York University stations

In April 2015, the government of Ontario announced that as part of a broad GO Transit expansion project called Regional Express Rail, service on the Barrie line would increase from 7 daily train trips to over 20 daily train trips by 2020.[41][a] The railway electrification system is expected to be completed by 2024 and will feature two-way, all-day service every 15 minutes between Union Station and Aurora GO.[41] However, on August 12, 2021, Metrolinx announced that, after electrification there would be 15-minute, two-way, all-day service beyond Aurora to Bradford, and 30-minute two-way, all-day service to Barrie South and Allandale Waterfront.[42]

Grade separation[]

A number of grade separation projects are planned for the line. The Davenport Diamond will separate the east-west CP rail subdivision tracks from the north-south Barrie line tracks. Road and rail grade separation will be undertaken at Rutherford Road immediately north of Rutherford GO Station,[43] and at McNaughton Road north of Maple GO Station.

Davenport Diamond[]

The Davenport Diamond is an at-grade rail-to-rail crossing of the GO Barrie line and east-west CP Rail North Toronto subdivision tracks near Davenport Road in Toronto. It is one of the busiest train intersections in North America.[44] In order to increase service frequency on the Barrie Line, GO Transit has identified the need to remove the diamond and build a grade separated crossing. In 2015 Metrolinx initiated a Transit Project Assessment Process (an environmental assessment process specific to transit projects) based on the preferred option of construction an overpass to carry the GO line over the east-west CP Rail line. The project began construction in 2017 and is scheduled to be completed in 2023.[45]

The grade separated crossing will be on a 1.4-kilometre (0.9 mi) long, 8.5-metre (28 ft) high rail bridge. It will lie between Bloor Street West and Saint Clair Avenue West parallel to Lansdowne Avenue. The bridge will allow GO Transit to run all-day, two-way service on the Barrie line without freight traffic disruptions. The project will cost $120 million.[46][47]

Metrolinx is focusing on bringing more to the community via the construction of this project. At the same time of building the guideway, further community improvements will be added in the immediate vicinity, including noise wall and bearing pads, a rail overpass above Wallace Avenue and a pedestrian underpass at Paton Road, as well as a replacement of the Bloor Street West bridge.[48]

Additional stations[]

In the September 2015 planning document "New Station Analysis", an initial list of 22 potential GO station sites were identified. These were, from north to south, at Innisfil, Holland Yard, Mulock Drive, St John's Sideroad, Yonge Street, Bathurst Street at Side Road 15, Dufferin Street, Kirby Road, Keele Street at Teston Road, Langstaff Road, Highway 7, Steeles Avenue, Finch Avenue, Downsview Park, Wilson Avenue, Lawrence Avenue, Caledonia Road, Rogers Road, St Clair Avenue West, Davenport Road, Dupont Street, and Bloor Street.[49]

Of these, most were rejected as unsuitable, either because they were too close to other stations,[50] or for failing to meet other criteria, such as connections to other services, proximity to urban growth centres,[51] construction viability, urban density, or necessary infrastructure.[52] Others were rejected because they were considered for other lines on the network.[53] Four sites were considered for either the Barrie line or the Kitchener line.[54] The sites at Highway 7 in Vaughan and at St Clair Avenue West were not included as part of the 10-year RER expansion, but are part of a future expansion program.[55] The candidate location Bathurst Street at Side Road 15 was deferred for future consideration.[56]

Stations have been approved in Vaughan for the Kirby Road site (serving the community of Hope), at Mulock Drive in Newmarket, and in Innisfil.[57] Under the Regional Express Rail initiative, new stations are planned in Toronto at Bloor Street West (near Lansdowne Avenue and Lansdowne subway station) and at Spadina Avenue near Front Street (with access to the CityPlace neighbourhood and 510 Spadina streetcars).[58][59]

Caledonia Station[]

The design for Caledonia station on Line 5 Eglinton includes provisions for a connection to the Barrie Line, including a pedestrian bridge above the Barrie line and provisions for elevator access to future GO platforms.[60] Metrolinx announced that an environmental assessment for the station would begin in the summer of 2015.[61]

Innisfil GO Station[]

Metrolinx is considering a station in Innisfil for a future expansion, to be located at approximately mile marker 52.00 miles (83.69 km).[62] They analyzed two sites just east of Sideroad 20: 5th Line near Lefroy's Lormel subdivision and 6th Line near the future Sleeping Lion development in south Alcona.[63] Innisfil town council stated its preference for the 6th Line location, which was ultimately chosen by Metrolinx,[64] and approved use of $2 million to acquire land and $2.6 million to partially fund the station's construction.[65]

Concord Station[]

To provide an interchange with Viva, a bus rapid transit service in York Region, a new station was proposed at Highway 7. The site was called Concord Station, after the Concord neighborhood in which it would be located.[66] The city of Vaughan has integrated the station into its design plans for a mixed use development near the intersection of Highway 407 and the rail corridor. Both the municipal government of Vaughan and the regional government of York have identified this location as a potential site for the station, which requires GO Transit to perform an environmental assessment.[67] In January 2013, Vaughan municipal clerk sent a Vaughan City Council resolution to York Regional Council requesting Metrolinx consideration for four priority projects, among them all-day two-way service on the Barrie line, creation of the Concord GO Station, and creation of a Kirby Road GO Station.[68] The station would be located near the old CN Concord Station (located north of Highway 7 on east side of tracks on the current Barrie line) that dated back to the Northern Railway of Canada Thornhill Station c. 1853 and demolished in 1978.

Ridership[]

In 2012, the Barrie line served about 7,500 passengers a day,[69] or approximately 2 million per year. By 2008, the annual number of riders on the Barrie line was almost 3.1 million, an increase of 18% from 2007 and 167% from 2001.[70] About 2,300 of the 3,000 daily peak passengers to Union Station boarded at Aurora (about 1,000), Rutherford (about 800), and Newmarket (about 500) that year.[71]

The weekend summer service had 105 daily riders in 2012 (32,000 total for six trains per day), and 220 daily riders in 2013 (41,000 total for four trains per day).[26]

From 2010 to 2014, ridership on the line increased 70% based on cordon count data.[72] For 2015, there was a weekday morning peak of 5,852 boardings and 227 alightings at the stations on the line, all other passengers alighting at Union Station in Toronto.[72]

2015 weekday morning peak ridership
Station Boardings Alightings
Allandale Waterfront 254 0
Barrie South 263 0
Bradford 229 2
East Gwillimbury 337 5
Newmarket 358 15
Aurora 1,113 15
King City 444 1
Maple 1,701 2
Rutherford 1,121 22
York University 32 165

Notes[]

  1. ^ As of April 2015, there are seven daily southbound weekday morning trains on the Barrie line, and seven daily northbound weekday evening trains.
  1. ^ "Regional Express Rail" (PDF). Metrolinx. 5 September 2014. Retrieved 2 September 2014.
  2. ^ Jump up to: a b c d Metrolinx 2010, p. 57.
  3. ^ Jump up to: a b c Town of Aurora.
  4. ^ Milland 2009.
  5. ^ Smith.
  6. ^ The Era 1968, p. 1.
  7. ^ Lade 1968, p. 1.
  8. ^ The Era 1969, p. 1.
  9. ^ Brotherhood of Maintenance of Way Employees 1973.
  10. ^ Jump up to: a b The Era & June 1970, p. 29.
  11. ^ Jump up to: a b c d Ottawa Citizen 1971, p. 21.
  12. ^ The Era 1970, p. 2.
  13. ^ Jump up to: a b The Era 1973, p. 2a.
  14. ^ Jump up to: a b The Era 1973, p. 5.
  15. ^ Jump up to: a b c Garcia & Bow.
  16. ^ Ministry of Transportation 2002.
  17. ^ Canada Newswire 2004.
  18. ^ GO Transit 2005.
  19. ^ GO Transit 2006.
  20. ^ GO Transit 2007.
  21. ^ GO Transit: New stations.
  22. ^ City of Barrie 2007.
  23. ^ Mackenzie 2012.
  24. ^ GO Transit: Seasonal service 2012.
  25. ^ GO Transit 2012.
  26. ^ Jump up to: a b c d Bruton 2013.
  27. ^ GO Transit: Barrie Seasonal Service 2013.
  28. ^ GO Transit 2014.
  29. ^ Government of Ontario 2016.
  30. ^ Toronto Transit Commission 2010.
  31. ^ Metrolinx 2010.
  32. ^ CTV News 2017.
  33. ^ "GO Train Shuttle Service". York University. Archived from the original on July 19, 2021. Retrieved July 19, 2021.
  34. ^ "York University GO Station closes to make way for Barrie Line expansion". Metrolinx. July 19, 2021. Archived from the original on July 19, 2021. Retrieved July 19, 2021.
  35. ^ Parks Canada.
  36. ^ "More Barrie GO Trains". GO Transit. Archived from the original on 2017-12-13. Retrieved December 13, 2017.
  37. ^ "For a Greater Region – Caledonia Station". www.metrolinx.com. Retrieved December 31, 2019. Construction will begin in 2022 and take approximately two years to complete
  38. ^ "New agreement with City of Toronto helps bring new SmartTrack stations closer to reality". Metrolinx. August 17, 2021. Archived from the original on August 18, 2021. Retrieved August 18, 2021.
  39. ^ Jump up to: a b c "Barrie Line 2019" (PDF). GO Transit. 2 November 2019. Retrieved 27 December 2019.
  40. ^ "Error | GO Transit" (PDF).
  41. ^ Jump up to: a b Kalinowski 2015.
  42. ^ "Metrolinx plans to bring 15-minute, two-way, all-day GO service further north on the Barrie Line to Bradford". Metrolinx. August 12, 2021. Archived from the original on August 12, 2021. Retrieved August 12, 2021.
  43. ^ GO Transit 2020.
  44. ^ "Metrolinx: For a Greater Region - Davenport Diamond: Guideway & Greenway". www.metrolinx.com. Retrieved 2020-06-29.
  45. ^ "Metrolinx: For a Greater Region - Davenport Diamond: Guideway & Greenway". www.metrolinx.com. Retrieved 2020-06-29.
  46. ^ Tess Kalinowski, Transportation reporter (7 August 2015). "GO gives city more time to consider giant rail bridge". Toronto Star. Retrieved 2016-03-31.
  47. ^ Tess Kalinowski, Transportation reporter (17 November 2015). "Metrolinx to move ahead with giant Davenport rail bridge". Toronto Star. Retrieved 2016-03-31.
  48. ^ "Davenport Diamond: Guideway" (PDF).
  49. ^ Woo 2015, p. 19.
  50. ^ Woo 2015, p. 17.
  51. ^ Woo 2015, p. 22.
  52. ^ Metrolinx 2016, p. 11–12.
  53. ^ Woo 2015, p. 12.
  54. ^ Metrolinx 2016, p. 13.
  55. ^ Metrolinx 2016, p. 21-23.
  56. ^ Metrolinx 2016, p. 26.
  57. ^ Metrolinx 2016.
  58. ^ Metrolinx 2016, p. 18.
  59. ^ Spurr 2016.
  60. ^ Metrolinx 2013.
  61. ^ Metrolinx 2015.
  62. ^ Metrolinx 2010, p. 167.
  63. ^ Vanderlinde 2016.
  64. ^ Metrolinx 2018.
  65. ^ CTV News 2016.
  66. ^ City of Vaughan 2013, p. 15.
  67. ^ City of Vaughan 2013, p. 16.
  68. ^ Kelly 2013, p. 2.
  69. ^ McInroy 2012.
  70. ^ Metrolinx 2010, p. 41.
  71. ^ Metrolinx 2010, p. 44.
  72. ^ Jump up to: a b Metrolinx 2017, p. 9.

References[]

External links[]

Retrieved from ""