Zerega Avenue station

From Wikipedia, the free encyclopedia

 Zerega Avenue
 "6" train"6" express train
MTA NYC logo.svg New York City Subway station (rapid transit)
Zerega Ave Station - 18116259919.jpg
Platforms
Station statistics
AddressZerega Avenue & Westchester Avenue
Bronx, NY 10461
BoroughThe Bronx
LocaleWestchester Square
Coordinates40°50′12″N 73°50′48″W / 40.836769°N 73.846793°W / 40.836769; -73.846793Coordinates: 40°50′12″N 73°50′48″W / 40.836769°N 73.846793°W / 40.836769; -73.846793
DivisionA (IRT)[1]
LineIRT Pelham Line
Services   6 all times except weekdays until 8:45 p.m., peak direction (all times except weekdays until 8:45 p.m., peak direction) <6> weekdays until 8:45 p.m., peak direction (weekdays until 8:45 p.m., peak direction)​
TransitBus transport NYCT Bus: Bx4
StructureElevated
Platforms2 side platforms
Tracks3 (2 in regular service)
Other information
OpenedOctober 24, 1920; 101 years ago (October 24, 1920)
RebuiltJuly 5, 2014; 7 years ago (July 5, 2014) to April 27, 2015; 6 years ago (2015-04-27)[2]
Station code364[3]
Opposite-
direction
transfer
Yes
Traffic
2019795,756[5]Increase 0.4%
Rank382 out of 424[5]
Station succession
Next northWestchester Square–East Tremont Avenue: 6 all times except weekdays until 8:45 p.m., peak direction <6> weekdays until 8:45 p.m., peak direction
Next southCastle Hill Avenue: 6 all times except weekdays until 8:45 p.m., peak direction <6> weekdays until 8:45 p.m., peak direction
Location
Zerega Avenue station is located in New York City Subway
Zerega Avenue station
Track layout

Legend
to Castle Hill Av
Street map

Station service legend
Symbol Description
Stops all times except rush hours in the peak direction Stops all times except rush hours in the peak direction
Stops rush hours in peak direction only Stops rush hours in the peak direction only

Zerega Avenue is a local station on the IRT Pelham Line of the New York City Subway. Located at Zerega Avenue and Westchester Avenue in the Westchester Square section of the Bronx, it is served by the 6 train at all times except weekdays in the peak direction, when the <6> train takes over.

History[]

Street stair prior to renovation

This station was built as part of the Pelham Line, which was part of the Dual Contracts, signed on March 19, 1913 and also known as the Dual Subway System.[6] The Pelham Line was proposed to be a branch of the Lexington Avenue Line running northeast via 138th Street, Southern Boulevard and Westchester Avenue to Pelham Bay Park.[7] This station opened on October 24, 1920, with the line's extension from East 177th Street to Westchester Square.[8][9][10]: 2389  Service was initially served by a mix of through and shuttle trains during the 1920s.[11]: 73–74 

From July 5, 2014 to April 27, 2015, as part of a $109 million rebuilding project at five Pelham Line stations,[2] this station, along with Buhre Avenue, was closed for station rehabilitation work.[12][13]

Station layout[]

P
Platform level
Side platform
Southbound local "6" train"6" express train toward Brooklyn Bridge (Castle Hill Avenue)
Peak-direction express No regular service
Northbound local "6" train"6" express train toward Pelham Bay Park (Westchester Square–East Tremont Avenue)
Side platform
M Mezzanine Fare control, station agent, MetroCard machines
G Street level Exit/entrance
Station sign and windscreen, also prior to renovation

This elevated station has three tracks and two side platforms. The center track is not used in regular service.

It resembles other elevated stations along the line: it has wood mezzanines and no windscreens along the platform edges.

Exits[]

The station's only exit is a mezzanine beneath the tracks. Outside fare control, stairs lead to the northeast and southwest corners of Westchester Avenue and Zerega Avenue.[14]

References[]

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Zerega Av and Buhre Av 6 Stations To Reopen After Renewal Project". mta.info (Press release). Metropolitan Transportation Authority. April 24, 2015. Retrieved April 26, 2015.
  3. ^ "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  4. ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  5. ^ a b "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  6. ^ nycsubway.org—The Dual Contracts
  7. ^ "The Dual System of Rapid Transit (1912)". www.nycsubway.org. Retrieved March 25, 2014.
  8. ^ "Subway Extension Opens Sunday". The New York Times. October 22, 1920. ISSN 0362-4331. Retrieved December 14, 2016.
  9. ^ Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. 1922. p. 372.
  10. ^ Moodys Manual of Railroads and Corporation Securities. Moody Manual Company. 1922.
  11. ^ Annual Report. J.B. Lyon Company. 1922.
  12. ^ "Zerega Avenue and Buhre Avenue 6 Line Stations to Close for Seven Months for Renewal". Retrieved April 11, 2016.
  13. ^ "Service Notice". mta.info. Metropolitan Transportation Authority. Retrieved April 11, 2016.
  14. ^ "MTA Neighborhood Maps: Pelham Bay" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Retrieved July 20, 2016.

External links[]

Retrieved from ""