Brook Avenue station

From Wikipedia, the free encyclopedia

 Brook Avenue
 "6" train
MTA NYC logo.svg New York City Subway station (rapid transit)
Brook Av IRT EB plat 2021 jeh.jpg
Northbound platform
Station statistics
AddressBrook Avenue & East 138th Street
Bronx, NY 10454
BoroughThe Bronx
LocaleMott Haven
Coordinates40°48′27″N 73°55′10″W / 40.80754°N 73.91932°W / 40.80754; -73.91932Coordinates: 40°48′27″N 73°55′10″W / 40.80754°N 73.91932°W / 40.80754; -73.91932
DivisionA (IRT)[1]
LineIRT Pelham Line
Services   6 all times (all times)
TransitBus transport NYCT Bus: Bx33
StructureUnderground
Platforms2 side platforms
Tracks3
Other information
OpenedJanuary 7, 1919; 102 years ago (1919-01-07)[2]
Station code376[3]
Accessiblenot ADA-accessible; accessibility planned
Opposite-
direction
transfer
No
Traffic
20191,823,468[5]Decrease 3.8%
Rank254 out of 424[5]
Station succession
Next eastCypress Avenue: 6 all times
Next westThird Avenue–138th Street: 6 all times
Location
Brook Avenue station is located in New York City Subway
Brook Avenue station
Track layout

Legend
to Cypress Av
to 3 Av
Street map

Station service legend
Symbol Description
Stops all times Stops all times

Brook Avenue is a local station on the IRT Pelham Line of the New York City Subway. It is served by the 6 train at all times and is located at Brook Avenue and East 138th Street in the Mott Haven neighborhood of the Bronx.

History[]

This station opened on January 7, 1919 with the extension of the Pelham Line from Third Avenue–138th Street to Hunts Point Avenue by the Interborough Rapid Transit Company.[2]

In 1951, the MTA proposed building a transfer from the IRT Pelham Line to the IND Second Avenue Line at Brook Avenue, though that was never built.[6][7] Instead, both platforms were extended at either ends in the 1960s to accommodate the current standard length of an IRT train (510 feet (160 m)). The extensions are noticeable as they are narrower than the rest of the platforms and have no columns. The extensions result in the platforms being slightly offset.[citation needed]

In 1981, the MTA listed the station among the 69 most deteriorated stations in the subway system.[8] Under the 2015–2019 MTA Capital Plan, the station, along with thirty other New York City Subway stations, will undergo a complete overhaul and would be entirely closed for up to 6 months. Updates would include cellular service, Wi-Fi, charging stations, improved signage, and improved station lighting.[9][10] However, these renovations are being deferred until the 2020–2024 Capital Program due to a lack of funding.[11] In 2019, the MTA announced that this station would become ADA-accessible as part of the agency's 2020–2024 Capital Program.[12]

Station layout[]

G Street level Exit/entrance
P
Platform level
Side platform
Southbound local "6" train toward Brooklyn Bridge (Third Avenue–138th Street)
Peak-direction express "6" express train does not stop here →
Northbound local "6" train toward Pelham Bay Park (Parkchester PM rush) (Cypress Avenue)
Side platform
Southbound street stair

This underground station has three tracks and two side platforms. The center express track is used by the weekday peak direction <6> service.[13]

Both platforms have their original Dual Contracts mosaic trim line and name tablets. The trim line has a geometric Vickers design of brightly colored diamonds in blue and green, bordered by scarlet red and yellow-ochre bands, as well as alternating "B" and concentric diamond plaques at regular intervals. The name tablets read "BROOK AVE." in white seriffed lettering on a blue background and yellow-ochre border. Some of the tablets themselves, and sections of the trim line on both sides have been replaced in recent years with historically accurate replicas. Dark yellow I-beam columns run along the original portion of the platforms at regular intervals, alternating ones having the standard black name plate with white lettering.[citation needed]

There are no crossovers or crossunders to allow free transfers between directions.[citation needed]

Exits[]

Both platforms have one same-level fare control area at the center. Each one has a turnstile bank, token booth, and two street stairs. The ones on the Pelham Bay Park-bound platform go up to either southern corners of Brook Avenue and East 138th Street while the ones on the Manhattan-bound platform go up to either northern corners.[14]

References[]

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ Jump up to: a b "New Lines In Bronx Coming This Year: Rays of Rapid Transit to be Let Into Dark Sections in the West and North" (PDF). The New York Times. January 7, 1919. Retrieved January 25, 2016.
  3. ^ "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  4. ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  5. ^ Jump up to: a b "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  6. ^ Rapid Transit Construction Program; 1951 (New York City Board of Transportation)
  7. ^ Crowell, Paul (September 14, 1951). "$500,000,000 VOTED FOR 2D AVE. SUBWAY BY ESTIMATE BOARD" (PDF). The New York Times. Retrieved January 2, 2017 – via The New York Times Archive.
  8. ^ Gargan, Edward A. (June 11, 1981). "Agency Lists Its 69 Most Deteriorated Subway Stations". The New York Times. Retrieved August 13, 2016.
  9. ^ "MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp"". Gothamist. Archived from the original on August 1, 2016. Retrieved July 18, 2016.
  10. ^ "MTAStations" (PDF). governor.ny.gov. Government of the State of New York. Retrieved July 18, 2016.
  11. ^ Berger, Paul (April 3, 2018). "New York Subway Cuts Back Plans to Renovate Stations". Wall Street Journal. ISSN 0099-9660. Retrieved April 3, 2018.
  12. ^ "Press Release - MTA Headquarters - MTA Announces 20 Additional Subway Stations to Receive Accessibility Improvements Under Proposed 2020-2024 Capital Plan". MTA. December 19, 2019. Retrieved December 25, 2019.
  13. ^ Lynch, Andrew (2020). "New York City Subway Track Map" (PDF). vanshnookenraggen.com. Retrieved February 6, 2020.
  14. ^ "Brook Avenue Neighborhood Map" (PDF). new.mta.info. Metropolitan Transportation Authority. April 2018. Retrieved February 28, 2019.

External links[]

Retrieved from ""