BU11 LRT station
JS03 BU11 Interim Name:Tropicana (S3) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
LRT station | |||||||||||
Location | Malaysia | ||||||||||
Owned by | Prasarana Malaysia; operated by Rapid Rail. | ||||||||||
Line(s) | 11 | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | Available | ||||||||||
Services | |||||||||||
|
The BU11 LRT station is a Light Rapid Transit (LRT) station that serve the suburb of BU11 Bandar Utama , Petaling Jaya Malaysia serves as one of the stations on the Shah Alam line. The station is located next to SPRINT Highway Damansara Toll Plaza.The station is an elevated rapid transit station in forming part of the Klang Valley Integrated Transit System.[1]
The station is marked as Station No. 3 along with the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. The BU11 LRT station is expected to be operational in February 2024 and will have facilities such as multi-story park and ride, kiosks, restrooms, elevators, taxi stand, and feeder bus among others.[2]
Surrounding Area[]
- BU11 residential, Bandar Utama
- The British International School of Kuala Lumpur
- First City University College
- SJK(T) Effingham
- Kuarters Institusi Pendidikan Bandar Utama
- Tropicana Landscape & Nursery
- Merchant Square Comercial Area
- Centerpoint Bandar Utama
- Bayu Puteri Apartment
- Pangsapuri Permai
- Pangsapuri Damai
- SMK Tropicana
References[]
- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
External links[]
Coordinates: 3°07′59″N 101°36′21″E / 3.1331549°N 101.6058634°E
- Railway stations in Selangor
- Rapid transit stations in Selangor
- Shah Alam Line
- Asian railway station stubs
- Malaysian building and structure stubs
- Malaysia rail transport stubs
- Asian rapid transit stubs