Kwasa Damansara MRT station

From Wikipedia, the free encyclopedia
 KG04   PY01 
Kwasa Damansara
Rapid KL (brand)
transit station
MRT SBK Kwasa Damansara station.jpg
Exterior view of the station as seen from the parking bays.
Other namesChinese: 桂莎白沙罗
Tamil: குவாசா டமன்சரா
LocationKwasa Damansara, Selangor
Malaysia
Coordinates3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E / 3.176472; 101.572556Coordinates: 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E / 3.176472; 101.572556
Owned byMRT Corp
Operated byRapid Rail
Line(s)9 Kajang Line
12 Putrajaya Line (Coming soon)
PlatformsStacked Island
Tracks4
Construction
Structure typeElevated
Platform levels3
ParkingAvailable with payment. 550 parking bays; 100 motorcycle bays.
Bicycle facilitiesNot available
Other information
Station code KG04   PY01 
History
Opened KG04  16 December 2016
Opening PY01  November 2021
Services
Preceding station Rapid KL Logo.svg Following station
Kampung Selamat
towards Sungai Buloh
Kajang Line Kwasa Sentral
towards Kajang
Coming soon development
Kampung Selamat
towards Kampung Batu
Putrajaya Line
Phase I
Terminus

The Kwasa Damansara station is a mass rapid transit (MRT) station that serves the future township of Kwasa Damansara in Selangor, Malaysia, which is currently being developed. It is one of the stations of the MRT Kajang Line and was opened on 16 December 2016 under Phase One opening of the line.[1]

The ceremony to launch Phase One of line by the Prime Minister of Malaysia Najib Razak was held at this station on 15 December 2016.[2]

The station will later become an interchange station between the MRT Kajang Line and MRT Putrajaya Line which is completed and scheduled to be opened soon to serve public, with both lines having their terminus at this station.[3]

Station features[]

Station location[]

The station is located within the Kwasa Damansara development project, one of two stations to serve this future township. As it is located away from Jalan Sungai Buloh (Malay; English: Sungai Buloh Road), a new access road was built to give access to the station.

Although the tracks at the Kwasa Damansara station are elevated, the station building itself is at-grade, the only one of its kind on the MRT Sungai Buloh-Kajang Line, but similar to Setiawangsa station on the Kelana Jaya Line.

The station has three levels, with the ground floor being the concourse and the two floors above being platform levels. The two elevated platforms are island platforms, enabling this station to have four platforms to enable it to function as the interchange station between the MRT Sungai Buloh-Kajang Line and the future MRT Sungai Buloh-Serdang-Putrajaya Line.

At present, only platform 1 for Kajang-bound trains on level 2, and platform 2 for Sungai Buloh-bound trains on level 1 are being used. Platform 3, across from platform 1 on level 2 and platform 4 which shares level 1 with platform 2, are not in use and do not have any tracks.

Station layout[]

L2 Platform 1 9 Kajang Line towards  SBK35  Kajang (←)
Island platform
Platform 3 Future 12 Putrajaya Line towards  PY41  Putrajaya Sentral (→)
L1 Platform 2 9 Kajang Line towards  SBK01  Sungai Buloh (→)
Island platform
Platform 4 Future 12 Putrajaya Line Terminus
G Concourse Fare gates into paid area, escalators and lifts to platforms, Main entrance, Taxi lay-by, Kiss and ride lay-by, Walkway to park and ride, Staff parking

Exits and entrances[]

The station currently has one entrance - Entrance A - although the design caters to future entrances when the area surrounding the station is developed. The entrance currently leads to the station access road and the park and ride facility.

Kajang Line station
Entrance Location Destination Picture
A West side of the station Taxi and private vehicle lay-by, park and ride SBK Line Kwasa Damansara Entrance A 2.jpg

Sungai Buloh-Serdang-Putrajaya Line[]

When Phase One operations for the MRT SSP MRT Line begins in 2021, this station will become the northern terminus of the line. At the same time, this station will replace Sungai Buloh station as the northern terminus of the MRT Sungai Buloh-Kajang Line.

As a result, the Kampung Selamat station and Sungai Buloh which are currently part of the MRT Kajang Line will be transferred to become part of the MRT Putajaya Line.[3]

Gallery[]

References[]

  1. ^ "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Klang Valley MRT Project. Mass Rapid Transit Corporation Sdn Bhd. Archived from the original (PDF) on 5 March 2017. Retrieved 1 April 2017.
  2. ^ "Ride the MRT tomorrow". thesundaily.my. 2016-12-15. Retrieved 2017-12-10.
  3. ^ a b Project information from "Route Map". mymrt.com.my. Archived from the original (PDF) on 27 June 2017. Retrieved 6 December 2017.

External links[]

Retrieved from ""