Kayu Ara LRT station

From Wikipedia, the free encyclopedia
 BK2 
Kayu Ara
Rapid KL (brand)
Light rapid transit station
LocationDamansara Utama, Selangor
Malaysia
Owned byPrasarana Malaysia
Operated byRapid Rail
Line(s)11 Shah Alam Line
Platforms2 side platforms
Tracks2
Construction
ParkingAvailable
Other information
Station code BK2 
Services
Preceding station   Rapid KL   Following station
Bandar Utama
Terminus
Bandar Utama-Klang Line line
BU11
toward Johan Setia

The Kayu Ara LRT station is a Light Rapid Transit (LRT) station that serve the suburb of Damansara Utama and Kampung Sungai Kayu Ara in Petaling Jaya Selangor, Malaysia. It will be one of the stations on the Shah Alam line. The station is located right next the Kayu Ara River. The station is an elevated rapid transit station in Petaling Jaya, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]

The station is marked as Station No. 2 along with the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. The Kayu Ara LRT station is expected to be operational in February 2024 and will have facilities such as multi-story park and ride, kiosks, restrooms, elevators, taxi stand, and feeder bus among others.[2]

References[]

  1. ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
  2. ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.

External links[]



Retrieved from ""