Semantan MRT station

From Wikipedia, the free encyclopedia
 KG14 
Manulife – Semantan
士曼丹
சேமாண்ட்டன்
Rapid KL (brand)
Rapid transit station
MRT Sungai Buloh-Kajang Line Semantan Station 1.jpg
Entrance B of the station at Jalan Dungun.
LocationDamansara Heights, Damansara
Kuala Lumpur, Malaysia.
Coordinates3°9′4.05″N 101°39′55.75″E / 3.1511250°N 101.6654861°E / 3.1511250; 101.6654861Coordinates: 3°9′4.05″N 101°39′55.75″E / 3.1511250°N 101.6654861°E / 3.1511250; 101.6654861
Owned byMRT Corp
Operated byRapid Rail
Line(s)9 Kajang Line
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
Platform levels3
ParkingAvailable near the overhead bridge
Bicycle facilitiesNot available
Other information
Station code KG14 
History
Opened16 December 2016
Services
Preceding station   Rapid KL   Following station
towards Sungai Buloh
MRT Kajang Line
towards Kajang

The Semantan MRT Station or Manulife-Semantan for sponsorship reasons, is a mass rapid transit (MRT) station that serves the suburb of Damansara Heights, Kuala Lumpur, Malaysia. It is one of the stations on the MRT Sungai Buloh-Kajang Line and was opened on 16 December 2016 when Phase One of the line became operational.[1]

The station is located near the Semantan Interchange (Jalan Dungun intersection) of the Sprint Expressway near Wisma UN, the United Nations (UN) representative office in Malaysia and the office area of Jalan Dungun.

History[]

During Phase One operation of the MRT Sungai Buloh-Kajang Line, this station was the southern terminus of the line where all passengers had to disembark. Trains would leave the station and made a turn back at the cross-over track above Jalan Sultan Abdul Halim before heading back towards Sungai Buloh. With the opening of Phase Two on 17 July 2017, the southern terminus of the station became Kajang station.

From 21 August 2017, Manulife has been granted a 5-year contract for the naming rights of the station, which is located within 5 minutes walk from Menara Manulife, the Manulife Malaysia's headquarters.[2][3]

Station Features[]

Station layout[]

L2 Platform Level Side platform
Platform 1 9 Kajang Line towards Kajang  SBK35  (→)
Platform 2 9 Kajang Line towards Sungai Buloh  SBK01  (←)
Side platform
L1 Concourse Faregates to paid area, escalators to platforms, ticketing machines, customer service office, station control, toilets, 7-Eleven, Rotiboy bakeshoppe, Entrance A and B escalators as well as lifts from ground level.
G Ground Level Entrance A and Entrance B, Feeder bus stop, Taxi Lay-by, Car lay-by

Exit and entrances[]

The station has two entrances, Entrance A is located on the north side along Jalan Damansara Endah while Entrance B is located on the south side along Jalan Dungun opposite of Wisma UOA Damansara. Both of the entrances have bus stops for bus and feeder services.

Kajang Line station
Entrance Location Destination Picture
A South side of Jalan Semantan Jalan Damansara Endah: bus stop for feeder and other bus services, car park MRT Sungai Buloh-Kajang Line Semantan Station 2.jpg
B North side of Jalan Semantan Jalan Dungun: bus stop for feeder and other bus services, Menara Manulife, Wisma UOA Damansara and The Five. MRT Sungai Buloh-Kajang Line Semantan Station 7.jpg

Bus services[]

MRT Feeder Bus Services[]

With the opening of the MRT Sungai Buloh-Kajang Line, feeder buses also began operating linking the station with the Solaris Dutamas and Kuala Lumpur High Court area in Jalan Tuanku Abdul Halim (Jalan Duta). The feeder buses operate from the station's feeder bus stops adjacent to the station at the Jalan Dungun entrance (Entrance B) of the station.

Route No. Origin Destination Via
T821[4]  SBK14  Manulife-Semantan station
Entrance B
Kuala Lumpur High Court, Publika Jalan Dungun
Jalan Gelenggang
Jalan Semantan
Jalan Tuanku Abdul Halim
Jalan Dutamas 1
Jalan Sultan Haji Ahmad Shah

Other Bus Services[]

The station is also served by RapidKL trunk buses at bus stops on either side of Jalan Semantan, and accessed via both entrances of the station. Semantan station is also served by a Kelana Jaya Line feeder bus route, connecting it with the Bangsar LRT station. The bus stop for the feeder bus is at Jalan Dungun, accessed via entrance B.

Route No. Origin Desitination Via
T850[5]  KJ16  Bangsar LRT station Pusat Bandar Damansara
Jalan Dungun
Jalan Bangsar Utama 1
Lorong Maarof
Jalan Maarof
Sprint Highway
Jalan Dungun
 SBK14  Semantan Station (Entrance B)
Jalan Gelenggang
Jalan Damanlela
Jalan Maarof
Jalan Bangsar

Gallery[]

References[]

  1. ^ "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Klang Valley MRT Project. Mass Rapid Transit Corporation Sdn Bhd. Archived from the original (PDF) on 5 March 2017. Retrieved 27 February 2018.
  2. ^ "Manulife granted naming rights for Semantan MRT station | New Straits Times". 22 August 2017.
  3. ^ https://www.manulife.com.my/content/dam/insurance/my/documents/about-us/newsroom/2017-08-21-manulife-press-release-manulife-officiates-manulife-semantan-mrt-station.pdf
  4. ^ RapidKL Bus Route T821
  5. ^ RapidKL Bus Route T850

External links[]

Retrieved from ""