Kolkata Metro Line 3

From Wikipedia, the free encyclopedia

Kolkata Metro Line 3
Kolkata Metro Logo.svg
Joka-Esplanade Metro
Metro Railway under Construction - Diamond Harbour Road - NH 117 - Behala - Kolkata 2015-12-12 7830.JPG
Overview
StatusUnder construction
OwnerMetro Railway, Kolkata
Line number3
LocaleIndia Kolkata, India
TerminiDiamond Park (South)
Esplanade (North)
Connecting lines Line 1   Line 2 
Stations14
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
History
Planned openingJoka to Taratala in 2022
Technical
Line length16.215 kilometres (10.076 mi)[1]
Number of tracks2
CharacterElevated and Underground
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail[2]
Operating speed80 km/h (designed)

Kolkata Metro Line 3 is a line of the Kolkata Metro. As of 2020, the line is still under construction.[3] The route spans 14.215 kilometres (8.833 mi) from Joka in the south, to Esplanade in the north with an extension of 2 km to Diamond Park from Joka.[4] It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

Development[]

It is partially elevated and partially underground: around 8.5 kilometres (5.3 mi) of the project will be elevated and the rest 6.32 kilometres (3.93 mi) of the metro line will be underground.[3] The project is getting delayed due to non availability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[5] Tenders for its construction and plant & machinery (M&P) were invited in April 2020.[6]

Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.

Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.

List of stations[]

The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of 16.72 km at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot is under construction in Joka. It is being built by RVNL and the tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for 2 km has been sanctioned in the Budget of 2012-13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.

There are 3 phases in this line-

  • Joka to Taratala (Under construction)
  • Taratala to Esplanade (After completion of phase 1)
  • Joka to Diamond park (After completion of phase 2)
Line 3
No. Station Name Location Phase Opening Connections Layout Coordinates Notes
English Bengali
1 Diamond Park ডায়মন্ড পার্ক Joka 3 Planned Kolkata bus.png Vivekananda Mission School Bus Stop Elevated
2 IIM আইআইএম
3 Joka জোকা 1 Under construction Kolkata bus.png Joka bus Depot

Kolkata bus.png Diamond Park Bus Stop

Also known as Diamond Park
4 Thakurpukur ঠাকুরপুকুর Thakurpukur

Kolkata bus.png Thakurpukur Police Station Bus Stop

Kolkata bus.png Thakurpukur Bazar Bus Stand

5 Sakherbazar সখেরবাজার Behala

Kolkata bus.png Thakurpukur Bus Depot

Kolkata bus.png Silpara Bus Stop

Kolkata bus.png Behala Sakherbazar Minibus Stand

Kolkata bus.png Kadamtala Bus Stand

Also known as Silpara
6 Behala Chowrasta বেহালা চৌরাস্তা

Kolkata bus.png Behala Chowrasta Bus Stand

7 Behala Bazar বেহালা বাজার

Kolkata bus.png Behala Bazar Bus Stop

8 Taratala তারাতলা Taratala

Kolkata bus.png Ajanta Cinema Bus Stop

Kolkata bus.png Taratala Bus Stand

Also known as Pathakpara
9 Majerhat মাঝেরহাট Majerhat Indian Railways Suburban Railway Logo.svg Majerhat Station

Kolkata bus.png DH Road Mint Bus Stop

Kolkata bus.png Majherhat Gurudwara Bus Stop

10 Mominpur মোমিনপুর Mominpur 2 Planned(Tender Floats) Kolkata bus.png Mominpore Bus Stop Underground
11 Kidderpore খিদিরপুর Kidderpore Indian Railways Suburban Railway Logo.svg Khidirpur Station

Calcutta Tramways Company (logo).gif Khidderpore Crossing Tram StopKolkata bus.png Khidderpore Bus Stop

12 Victoria ভিক্টোরিয়া Maidan Calcutta Tramways Company (logo).gif Hastings Tram Stop

Kolkata bus.png Victoria Memorial Bus Stop

Kolkata bus.png PG Hospital Bus Stop

Kolkata bus.png Birla Planetarium Bus Stop

Also known as Hastings
13 Park Street পার্ক স্ট্রিট Park Street Kolkata bus.png Park Street Bus Stop

 Line 1 

14 Esplanade এসপ্ল্যানেড Esplanade Under Construction  Line 1 

 Line 2  (Under Construction)

Kolkata bus.png Esplanade Bus Station(WBTC,SBSTC,NBSTC)

Calcutta Tramways Company (logo).gif Esplanade Tram Depot

International Bus Terminus. Also known as Dharmatala / Chowringhee

See also[]

  • List of Kolkata metro stations
  • Kolkata Metro Rolling Stock
  • 2018 Kolkata bridge collapse
  • Kolkata Suburban Railway

References[]

  1. ^ "Kolkata Metro Map".
  2. ^ "CAF to supply Kolkata metro trains". Railway Gazette. 9 September 2012. Retrieved 6 September 2018.
  3. ^ a b B, Krishnendu; yopadhyay; Jun 10, Ajanta Chakraborty | TNN | Updated; 2019; Ist, 10:39. "Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.CS1 maint: numeric names: authors list (link)
  4. ^ "Kolkata Metro Line 3".
  5. ^ B, Krishnendu; Mar 1, yopadhyay | TNN | Updated; 2019; Ist, 11:11. "Work begins at Joka Metro depot, wall built | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.CS1 maint: numeric names: authors list (link)
  6. ^ "RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot". The Metro Rail Guy. 28 April 2020. Retrieved 29 April 2020.
Retrieved from ""