Delhi–Alwar Regional Rapid Transit System

From Wikipedia, the free encyclopedia

Delhi–Alwar Regional Rapid Transit System
Overview
OwnerNCRTC
Area served
LocaleNCR
Transit typeSuburban rail
Number of stations22
Operation
Operation will startApril 2025[1]
Headway5 - 10 minutes
Technical
System length164 km
No. of tracks2
Track gauge(1,676 mm (5 ft 6 in) broad gauge)
Electrification25 kV, 50 Hz AC overhead catenary
Average speed100 km/h
Top speed160 km/h
Delhi-NCR RRTS route map.svg
Map showing the three proposed RRTS lines along with Metro and Indian Railways services

Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction[2][3] semi-high speed rail corridor connecting Delhi, Gurugram, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h,[4] the distance between Delhi and Alwar will be covered in 104 minutes.[5] The project is expected to cost 37,000 crores.[6]

The Phase-I construction is expected to be complete by December 2024.[7]

History[]

The National Capital Region Planning Board (NCRPB) as part of its Integrated Transportation Plan 2032 identified eight rail based rapid transit corridors to improve the efficacy of transportation system in the NCR.[8] These were:

  1. Delhi - Gurgaon - Rewari - Alwar
  2. Delhi - Ghaziabad - Meerut
  3. Delhi - Sonipat - Panipat
  4. Delhi - Faridabad - Ballabhgarh - Palwal
  5. Delhi - Bahadurgarh - Rohtak
  6. Delhi - Shahadra - Baraut
  7. Ghaziabad - Khurja
  8. Ghaziabad - Hapur

Of these Delhi-Alwar, Delhi-Panipat and Delhi-Meerut are to be constructed in the first phase. The Urban Mass Transit Company was given the job of conducting a feasibility study on 23 March 2010. The study thus submitted was approved by the Planning Board in 2012. The contract was then transferred to NCRTC on 18 January 2017 to carry the study forward.[1]

On 15 June 2018, the 100 km long first phase of the project from Hazrat Nizamuddin to Shahjahanpur-Neemrana-Behror, at an estimated cost of 25,000 crore, was approved by the Haryana government.[9]

Construction[]

Construction of Delhi-Alwar route with total 22 stations in will be completed in the following three construction phases and a pre-construction phase:[10]

  • Pre-construction phase - January 2019 to December 2019: Pre-construction activities such as Pile Loading Test and Geo-Technical Survey for one year from January 2019 to December 2019.[10]
  • Phase-1 (Delhi to SNB) - January 2020 to December 2024: The 106 km Sarai Kale Khan in Delhi to Gurugram to SNB (Shahjahanpur-Neemrana-Behror Urban Complex) route, of which 75 km is in Haryana.[10] Initial 35 km with 5 stations will be underground mostly in Delhi and Gurugram, and subsequent 71 km route with 11 stations will be overground in Haryana. To be completed by 2024.[10] In April 2020, GR Infrastructure emerged as the lowest bidder for package 1: IDPL Complex Ramp - Rajiv Chowk Ramp with 3 stations.[11]
  • Phase-2 (SNB to Sotanala) - <dates>?: stations en route include Shahjahanpur, Neemrana and Behror.[10]
  • Phase-3 (Sotanala to Alwar) - <dates>?: All in Rajasthan.[10]

Stations[]

There will be total 23 stations in total; 17 (11 elevated and 6 underground) will be built in the first phase and the rest in later phases.[12][7]

No. Station Name Inter-station distance (km) Cumulative Distance (km) Connections Layout Status
Phase-1
1 Hazrat Nizamuddin  Pink Line   Indian Railways   ISBT  Elevated Planned
2 Dilli Haat - INA metro station interchange  Yellow Line   Pink Line  Underground Planned
3 Munirka (Delhi)  Magenta Line  Underground Planned
4 Delhi Aerocity metro station interchange  Orange Line  Underground Planned
5 Udyog Vihar (Gurugram)  Yellow Line  Elevated Planned
6 Sector-17 (Gurugram) None Elevated Planned
7 Rajiv Chowk (Gurugram)    Elevated Planned
8 (Gurugram)  Yellow Line  Underground Planned
9 Kherki Daula (WPE Toll Plaza Multi-model interchange)    Underground Planned
10 Manesar None Underground Planned
11 Panchgaon (WPE Multi-model Interchange)    Elevated Planned
12 Bilaspur Chowk INDU (MDR132) None Elevated Planned
13 Dharuhera None Elevated Planned
14 MBIR Nikhri Village (Manesar Bawal Investment Region) None Elevated Planned
15 Rewari None Elevated Planned
16 Bawal (Haryana) None Elevated Planned
17 SNB (Shahjahanpur-Neemrana-Behrod) (Rajasthan) None Elevated Planned
Phase-2
1 Shahjahanpur (Rajasthan) None Elevated Planned
2 Neemrana (Rajasthan) None Elevated Planned
3 Behror (Rajasthan) None Elevated Planned
4 Sotanala None Elevated Planned
Phase-3
1 Khairtal None Elevated Planned
2 Alwar None Elevated Planned

Status updates[]

  • December 2018: the Phase-I construction project proposal for Delhi-Gurugram-Shahjahanpur-Neemrana-Behror stretch was approved by NCRTC.
  • February 2019: The Haryana Government approved the project.[13]
  • June 2019: The Rajasthan Government approved the project.[13]
  • November 2019: Bids for the construction of the Gurgaon section of the Line were invited.
  • September 2020: Construction started on a 10 km stretch in Gurgaon. [14]

See also[]

References[]

  1. ^ a b Stateholders' Workshop for Delhi-Gurgaon-Rewar-Alwar RRTS Corridor (PDF) (Report). Archived from the original (PDF) on 20 September 2017. Retrieved 20 September 2017.
  2. ^ "Delhi to Alwar in 104 minutes: Rapid rail proposal moves to approval stage". Hindustan Times. 22 April 2017. Archived from the original on 20 September 2017. Retrieved 20 September 2017.
  3. ^ "NHAI approves Delhi RRTS projects worth Rs53,500 crore". Livemint. 19 July 2017. Archived from the original on 20 September 2017. Retrieved 20 September 2017.
  4. ^ "Work on Delhi-Alwar RRTS to start in a year". The Tribune. Archived from the original on 20 September 2017. Retrieved 20 September 2017.
  5. ^ "Delhi-Rewari-Alwar RRTS project discussed with stakeholders today". Press Information Bureau, Government of India. Archived from the original on 21 September 2017. Retrieved 21 September 2017.
  6. ^ "Rapid rail projects connecting Delhi to Alwar and Panipat get approval". Hindustan Times. 19 July 2017. Archived from the original on 20 July 2017. Retrieved 9 October 2017.
  7. ^ a b Big news for Delhi-NCR! Delhi-Alwar rapid rail transit Phase-1 corridor approved; how it will benefit, Financial express, Dec 2018.
  8. ^ "Plan to create high-speed corridor for NCR". The Hindu. 24 September 2012. Archived from the original on 20 September 2017. Retrieved 20 September 2017.
  9. ^ "Haryana gives green light to high-speed rail network project". The Hindu. 15 June 2018. Retrieved 18 June 2018.
  10. ^ a b c d e f Tender floated for construction of Rapid Rail, Daily Pioneer, 25 December 2018.
  11. ^ "GR Infra Lowest Bidder for Gurgaon Section of Delhi - Alwar RRTS Line". The Metro Rail Guy. 15 April 2020. Retrieved 15 April 2020.
  12. ^ "NCRTC|Delhi-Alwar Corridor". ncrtc.in. Archived from the original on 17 February 2019. Retrieved 15 July 2018.
  13. ^ a b "Delhi - Alwar RRTS - Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 3 January 2022.
  14. ^ "KEC Begins Construction on Delhi - Alwar RRTS' Gurgaon Section". The Metro Rail Guy. 29 September 2020. Retrieved 3 January 2022.