LNER Class A2

From Wikipedia, the free encyclopedia

LNER Raven Class A2
A2 class 1923.jpg
Raven Class A2 2400 on trial at King's Cross Station in June 1923
Type and origin
Power typeSteam
DesignerVincent Raven
BuilderNER/LNER Darlington Works
Build date1922 (2), 1924 (3)
Total produced5
Specifications
Configuration:
 • Whyte4-6-2
 • UIC2′C1′ h3
Gauge4 ft 8+12 in (1,435 mm)
Leading dia.3 ft 1.25 in (0.946 m)
Driver dia.6 ft 8 in (2.032 m)
Trailing dia.3 ft 9.25 in (1.149 m)
Fuel typeCoal
Fuel capacity5.5 long tons (5.6 t)
Water cap.4,125 imp gal (18,750 l)
Boiler pressure200 psi (1.38 MPa) (most), 180 psi (1.24 MPa) (2404)
CylindersThree
Cylinder size19 in × 26 in (483 mm × 660 mm)
Valve gearStephenson
Valve type8+34-inch (220 mm) piston valves
Performance figures
Tractive effort29,918 lbf (133.08 kN) (NER boiler), 26,926 lbf (119.77 kN) (2404 with A1 boiler)
Career
Operators
  • North Eastern Railway
  • London and North Eastern Railway
Numbers2400–2404
Withdrawn1936–1937
DispositionAll scrapped

The first London and North Eastern Railway (LNER) Class A2 was a class of 4-6-2 steam locomotive designed by Vincent Raven for the North Eastern Railway (as NER class 4.6.2).[1] Two were built by the NER in 1922 before the grouping and another three by the LNER in 1924. Their LNER numbers were 2400–2404. All five locomotives were named by the LNER.

Origins[]

The NER was the largest and most prosperous of the railway companies that would make up the LNER from 1923 and provided the general manager of the new railway company. However the chief mechanical engineer of the NER, Sir Vincent Raven was at retirement age and the new post was eventually offered to Nigel Gresley of the Great Northern Railway. He had introduced a powerful new A1 Class Pacific in April 1922, and Raven was anxious to show that the NER could keep up with the race for increased power.[2] Raven's rival design was authorised at the same time as the introduction of the A1 class publicised in the railway press in July 1922 although the first two examples did not appear from Darlington Railway Works until late December, and only one of them ran before the beginnings of the LNER.[3]

Design[]

The new class was an enlarged version of the successful Atlantics (later LNER C7 class) with a larger boiler, larger cylinders and wide firebox. The boiler pressure was also increased to 200 psi (1.38 MPa).[3] They shared with the Gresley K3 class the record for the largest diameter boiler in Britain, at 6 ft (1.83 m). Also, because of the great length of their parallel boilers, the locomotives earned the nickname 'Skittle-alleys'.[4]

Components for three further examples of the class had been prepared by Darlington works, and construction of these was authorised in February 1923.[4] This was the same month that Nigel Gresley took up office and may have been ordered without his knowledge.[3] These locomotives appeared in March 1924. However, comparative trials between the first two examples of the A1 and A2 classes conducted in the summer of 1923 showed that the A1 was a more technically advanced machine and no more Raven A2s were built.[5]Thus the A1 was chosen as the LNER's standard express passenger locomotive

Performance[]

The performance of the locomotives was adequate for the needs of their intended use on the East Coast Main Line between York and Edinburgh but disappointing and with higher coal consumption compared to the A1 class. They also suffered from a long wheelbase 40 ftin (12.32 m) which limited their route availability elsewhere.[4]

In an attempt to improve the steaming of the class Gresley rebuilt No. 2404 with an A1-style taper boiler in 1929, reducing the boiler pressure to 180 psi (1.24 MPa) but no noticeable improvement was achieved. Therefore, once the locomotives came due for heavy repair during 1936-37 they were all withdrawn from service and scrapped.[6]

Assessment[]

According to the Railway Correspondence and Travel Society survey of the Locomotives of the L.N.E.R. 'the design was an unhappy swan-song to the North Eastern locomotive development - it was their biggest, but somewhat below the best that Darlington could do.'[5] In the opinion of Allen, 'prestige rather than real need was the predominant consideration; in the design.[4]

Stock list[]

LNER
No.
Name Built Withdrawn Notes
2400 City of Newcastle December 1922 April 1937 Was converted to a stationary boiler at Darlington Works.
2401 City of Kingston upon Hull December 1922 July 1936
2402 City of York March 1924 July 1936
2403 City of Durham March 1924 May 1937
2404 City of Ripon March 1924 February 1937 Fitted with modified A1 boiler in September 1929

Notes[]

  1. ^ Boddy et al. 1963, p. 22.
  2. ^ Allen 1962, p. 15.
  3. ^ a b c Boddy, Neve & Yeadon 1973, p. 136.
  4. ^ a b c d Allen 1962, p. 16.
  5. ^ a b Boddy, Neve & Yeadon 1973, p. 137-8.
  6. ^ Allen 1962, p. 18.

References[]

  • Allen, Cecil J. (1962). British Pacific Locomotives. London: Ian Allan.
  • Appleby, Ken (1993). Britain's Rail Super Centres: York. Shepperton: Ian Allan. ISBN 0-7110-2072-8.
  • Boddy, M. G.; Fry, E. V.; Hennigan, W.; Proud, P.; Yeadon, W. B. (July 1963). Fry, E. V. (ed.). Locomotives of the L.N.E.R., Part 1: Preliminary Survey. Potters Bar: RCTS. ISBN 0-901115-11-8.
  • Boddy, M. G.; Neve, E.; Yeadon, W. B. (April 1973). Fry, E. V. (ed.). Locomotives of the L.N.E.R., Part 2A: Tender Engines—Classes A1 to A10. Kenilworth: RCTS. ISBN 0-901115-25-8.
  • Yeadon, W. B. (1991). Yeadon's Register of LNER Locomotives, Vol. 3: Raven, Thompson and Peppercorn Pacifics. Irwell Press.

External links[]

Retrieved from ""