Madhupur–Giridih–Koderma line

From Wikipedia, the free encyclopedia

Madhupur–Giridih–Koderma line
Giridih railway station - Entrance.jpg
Giridih, an important railway station on Madhupur–Giridih–Koderma line
Overview
StatusOperational
OwnerIndian Railways
LocaleJharkhand, India
TerminiMadhupur Junction
Koderma Junction
Stations21 operational
Service
TypeElectrified
SystemBroad gauge
ServicesKoderma–Madhupur line
Operator(s)Eastern Railway
East Central Railway
History
Opened1871, 2012, 2015, 2019
Technical
Line length138 km (86 mi)
Number of tracks1
Track gauge5 ft 6 in (1,676 mm) broad gauge
Operating speedUp to 110 km/h
Route map

Legend
km
Up arrow
138
Madhupur
Left arrow
132
Sugapahari
130
Sugapahari Halt
125
Jagadishpur
121
Krishna Ballabh Sahay Halt
111
0
Maheshmunda
11
Giridih
16
CPC Siding Giridih
104
0
New Giridih
Dhanbad–New Giridih line (planned)
Dhirabar River
12
Koimara
25
Fatehpur
32
Tundi
45
Maharajganj
Khudia River
59
Govindpur
Up arrow
70
Pradhankhanta
Down arrow
96
0
Salaia
Parasnath–New Giridih line (planned)
7
Lakhiatanr
14
Kumhartola
24
Madhuban
31
Chainpur Halt
Up arrow
38
Parasnath
Down arrow
93
Jitpur
86
Kawar
79
Jorasankh Halt
72
Jamua
62
Duriatanr Halt
55
Rema
49
Dhanwar
41
Rakesh Bagh Halt
33
Nawadih
28
Nawal Sahi Halt
20
Maheshpur Halt
10
Koderma Town
Up arrow
0
Koderma
Down arrow
km

Madhupur–Giridih–Koderma line is a 138 km (86 mi)-long single 1,676 mm (5 ft 6 in) 5 ft 6 in (1,676 mm) broad gauge track from Madhupur city in Deoghar district to Koderma city in Koderma district via Giridih city in Giridih district of Jharkhand state. It is an extended route of Madhupur–Giridih railway line. The Koderma–Maheshmunda section falls under Dhanbad Division of East Central Railway and Giridih–Madhupur section under Asansol Division of Eastern Railway. The construction of 110 km (68 mi) rail line from Koderma to Maheshmunda was done under supervision of Dhanbad Division of East Central Railway.[1]

History[]

Giridih railway station was built as a railway siding in 1871 by the British government in India (prior to the India's independence in 1947) mainly for transport of mineral reserve from the region. The contract for the railway siding was awarded in 1865 and the construction was completed in 1871.[2] The siding is owned by Central Coalfields Limited.[3]

A 110 km (68 mi) track from Koderma to Maheshmunda was constructed. This extended the Madhupur–Giridih railway line to Koderma, effectively making it a Madhupur–Giridih–Koderma line. A new railway station was built in Giridih named as (NGRH) which leaves out the already existing Giridih railway station (GRD) on this route, also making Maheshmunda a junction station. On 16 February 2019, Eastern Railway in its press-release announced a passenger train service w.e.f. 25 February 2019 from Koderma to Madhupur via . Onward journey duration is of 4 hours and 5 minutes while the return journey duration is 4 hours and 25 minutes. Eastern Railway also announced another passenger train service w.e.f. 25 February 2019 from Koderma to Maheshmunda Junction through the same press-release. Onward journey duration is of 3 hours while the return journey duration is 3 hours and 10 minutes.[4]

Electrification[]

Madhupur–Giridih–Koderma line was completely electrified in October 2020.

Further extension[]

There are plans from the Railways ministry to connect with Parasnath via Madhuban, for the convenience of the Jain pilgrims visiting Shikharji.[5] The foundation for the construction of new Parasnath–New Giridih rail line was laid in 2019. The 47 km-long railway line would incur a cost of Rs 972 crore on its construction and will have two crossing stations and a couple of halts. The cost of the project would be borne by the central and the state government in 50:50 ratio and a target has been set to complete the project by 2023.

There are other proposals as well to connect with Dhanbad via Tundi and Govindpur,[6] and with Jhajha via Bengabad, Chakai and Sono. The first phase of the Jhajha–New Giridih rail line involves 20-km long Jhajha–Batia section, the foundation for which was laid in 2019 and which will be constructed at a cost of Rs 496 crore.

A final location survey for 7.54 km-long Madhupur bypass line was sanctioned in February 2020 after construction of which trains from Jasidih can run up to Giridih and Koderma without loco reversal at Madhupur. A delay of more than 30 minutes for an engine change at Madhupur will thus be avoided. The estimated cost of the linking project is Rs 281 crore.

Description[]

Following is the list of stations that are on MadhupurKoderma route via .[7]

List of stations
S.No. Station Station Code
1 Madhupur MDP
2 Sugapahari TP-6/3 SGPA
3 Sugapahari Halt TP-7/11 SAPT
4 Jagadishpur JGD
5 Krishna Ballav Sahay Halt KBSH
6 Maheshmunda Junction MMD
7 New Giridih NGRH
8 Salaiya SLIA
9 Kawar KWAR
10 Jorasankh Halt JASH
11 Jamua JAUA
12 Duriyatanr Halt DUTR
13 Rema REMA
14 Raj Dhanwar DNWR
15 Rakesh Bagh Halt RHBH
16 Nawadih NWDH
17 Nawasahi Halt NWSI
19 Maheshpur A Cabin Halt MHSA
20 Koderma Town KQRT
21 Koderma Junction KQR

Trains[]

Single passenger train run five times a day between Madhupur JunctionGiridih. The train service on Madhupur–Giridih rail route started in 1871. The passenger trains are run by Eastern Railway zone. The trains run five times daily except Thursdays and four times on Thursday.[8] The bogies of the express trains are attached to the passenger trains for movement in the Madhupur–Giridih route. Following are the trains arriving and departing from Giridih.[9][10]

Express trains
S.No. Train no. Train name Source – Destination
1 23112 Giridih Kolkata Express Giridih–Kolkata
2 23111 Danapur Express Giridih–Danapur, Patna
3 83112 Danapur Giridih Express Danapur, Patna–Giridih
4 13111-slip Lal Quila Express Slip Kolkata–Giridih
Passenger Trains
Sl.No. TRAIN NO. TRAIN NAME
1 53511 Madhupur–Giridih Passenger
2 53512 Giridih–Madhupur Passenger
3 53513 Madhupur–Giridih Passenger
4 53514 Giridih–Madhupur Passenger
5 53515 Madhupur–Giridih Passenger
6 53516 Giridih–Madhupur Passenger
7 53517 Madhupur–Giridih Passenger
8 53518 Giridih–Madhupur Passenger
9 53519 Madhupur–Giridih Passenger
10 53520 Giridih–Madhupur Passenger

After the construction of Koderma–Maheshmunda section in 2019, new passenger trains were started on this route which are run by East Central Railway. Following are the trains running on this route via .

Passenger trains
Sl.No. TRAIN NO. TRAIN NAME
1 53365 Maheshmunda–Koderma Passenger
2 53366 Koderma–Maheshmunda Passenger
3 53369 Madhupur–Koderma Passenger
4 53370 Koderma–Madhupur Passenger

See also[]

  • Indian Railways
  • Giridih
  • Giridih district

References[]

  1. ^ "Railways conduct trial run on newly built track on Dhanbad Division". The Times of India. 27 March 2010. Archived from the original on 3 January 2013. Retrieved 27 March 2010.
  2. ^ Akhtar, Shahnawaz (20 August 2009). "Ignored, Giridih station cries for care – Pilgrim spot fetches Rs 25cr for railways, but denied express trains". The Telegraph (Calcutta). Calcutta, India. Retrieved 31 March 2012.
  3. ^ "Colliery Sidings East Railway". Official Website of the Eastern Railway. Archived from the original on 26 May 2012. Retrieved 1 April 2012.
  4. ^ Railway, Eastern (16 February 2019). "pic.twitter.com/fol9xNXCuk". @EasternRailway. Retrieved 17 February 2019.
  5. ^ "Giridih lauds Didi's budget – 'Madhuban link a blessing'". The Telegraph. Calcutta. 5 July 2009. Retrieved 31 March 2012.
  6. ^ "मोदी सरकार ने खींचा धनबाद-गिरिडीह के बीच रेल लाइन का खाका". Dainik Jagran (in Hindi). Retrieved 23 February 2019.
  7. ^ "List of Stations on Asansol Division". Official Website of Eastern Railway, Govt of India. Retrieved 7 April 2012.
  8. ^ Akhtar, Shahnawaz (19 May 2008). "Coal mafia chokes trains". The Telegraph. Calcutta. Retrieved 31 March 2012.
  9. ^ "Trains to Giridih". India Rail Info. Retrieved 31 March 2012.
  10. ^ "Trains from Giridih". India Rail Info. Retrieved 31 March 2012.

External links[]

|

Retrieved from ""