SMART Tunnel

From Wikipedia, the free encyclopedia

Mes-e38.png
Expressway 38
Stormwater Management And Road Tunnel
(SMART Tunnel)
Terowong Jalan dan Pengurusan Air Banjir (Terowong SMART)
East Kuala Lumpur map with the SMART Tunnel
Route information
Maintained by Syarikat Mengurus Air Banjir dan Terowong Sdn Bhd (SMART)
Length4 km (2.5 mi)
Existed2003–present
HistoryConstruction works started November 2003, and were completed in 2007
Major junctions
North endSultan Ismail–Kampung Pandan Link
Jalan Tun Razak
 Sultan Ismail–Kampung Pandan Link
Kuala Lumpur Middle Ring Road 1 (Jalan Tun Razak)
E37 Kuala Lumpur–Seremban Expressway
E37 East–West Link Expressway
South endSMART Tunnel toll plaza near Sungai Besi Airport
Location
Primary
destinations
Bukit Bintang

Cheras
Petaling Jaya
Seremban
Highway system
Stormwater Management And Road Tunnel
Smart-tunnel.jpg
Southbound upper deck of the SMART Tunnel
Overview
LocationKuala Lumpur, Malaysia
StatusOperational
RouteE38 E38
StartJalan Tun Razak on Kuala Lumpur Middle Ring Road 1
EndSungai Besi Airport on E37 Kuala Lumpur–Seremban Expressway
Operation
Work begun2003
ConstructedGamuda Berhad
MMC Corporation Berhad
Opened2007
OwnerGovernment of Malaysia
Malaysian Highway Authority (LLM)
(JPS)
OperatorSyarikat Mengurus Air Banjir dan Terowong Sdn Bhd (SMART)
TollPrivate cars and taxis
Technical
Length4 km (2.5 mi)
No. of lanes4, double-decked
Operating speed60 km/h

The Stormwater Management And Road Tunnel (SMART Tunnel), E38, is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. The 9.7 km (6.0 mi) tunnel is the longest stormwater drainage tunnel in Southeast Asia and second longest in Asia.

The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams along Jalan Sungai Besi and Loke Yew flyover at Pudu during rush hour. There are two components of this tunnel, the stormwater tunnel and motorway tunnel. It is the longest multi-purpose tunnel in the world.

In 2011, the SMART tunnel received the UN Habitat Scroll of Honour Award for its innovative and unique management of storm water and peak hour traffic.

It begins at lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South. The project is led by the government, including Malaysian Highway Authority (Lembaga Lebuhraya Malaysia, LLM) and the Department of Irrigation and Drainage Malaysia (Jabatan Pengairan dan Saliran, JPS) and also a company joint venture pact between Gamuda Berhad and Malaysian Mining Corporation Berhad (MMC).

Route background[]

The Kilometre Zero of the tunnel is located at Salak Interchange.

History[]

In 2001 the Government sought proposals for a solution that would allow a typical flood of three to six hours' duration to occur without flooding the city centre.[1] A tunnel that would allow floods to bypass the centre was one way of achieving this, providing it was coupled with temporary storage facilities to keep flows downstream of Kuala Lumpur within the capacity of the river channel. A group led by Gamuda engaged SSP, a large Malaysian consultant engineering firm, and Mott MacDonald UK to develop proposals for a tunnel with holding ponds at upstream and downstream ends of the tunnel.

Construction of the tunnel began on 25 November 2003. Two Herrenknecht Tunnel Boring Machines (TBM) from Germany were used, including Tuah on north side and Gemilang on south side. Gusztáv Klados was the senior project manager of the project.[2]

On 11 December 2003, the 13.2-m diameter Mixshield TBM, Tuah, completed a 737-m section after 24 weeks of excavation. By the end of January 2004, Tuah would start a second drive covering a distance of 4.5 km to Kampung Berembang lake. The motorway sections on the SMART system was officially opened at 3:00PM, 14 May 2007, after multiple delays.[3][4]

Meanwhile, the stormwater sections on the SMART system began operations at the end of January 2007.

By 18 July 2010 the SMART system had prevented seven potentially disastrous flash floods in the city centre,[5] having entered its first mode 3 operation only weeks after the opening of the motorway.[6]

As of September 2020, the tunnel had activated its fourth mode for the seventh time. During the flash flood on 10 September 2020, the tunnel diverted three million cubic metres of water.[7][8]

Functioning[]

The four modes of operation and storage capacity.

The first mode, under normal conditions where there is no storm, no flood water will be diverted into the system. When the second mode is activated, flood water is diverted into the bypass tunnel underneath the motorway tunnel. The motorway section is still open to traffic at this stage. When the third mode is in operation, the motorway will be closed to all traffic. After making sure all vehicles have exited the motorway, automated water-tight gates will be opened to allow flood waters to pass through. After the flood has ended, the tunnel is verified and cleaned via pressure-washing, and the motorway will be reopened to traffic within 48 hours of closure.[9]

Technical specifications[]

SMART tunnel entrance along Jalan Sungai Besi, Kuala Lumpur, Malaysia.

Stormwater tunnel[]

  • Construction cost: RM1,887 million (US$514.6 million)
  • Stormwater tunnel length: 9.7 km (6.0 mi)
  • Diameter: 13.2 m (43.3 ft) (outer diameter)
  • Tunnelling method: Tunnel Boring Machine (TBM)
  • TBM type: Slurry shield

Motorway tunnel[]

  • Motorway tunnel length: 4 km (2.5 mi)
  • Structure type: Double Deck
  • Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan Imbi
  • Length: 1.4 km (0.87 mi) at Jalan Tun Razak
  • Links: 1.6 km (0.99 mi) at Kuala Lumpur–Seremban Expressway Links: City Centre near Kg. Pandan Roundabout KL–Seremban Expressway near Sungai Besi Airport

Features[]

The north bound entrance of SMART Tunnel on the Kuala Lumpur–Seremban Expressway.
  • World's First Dual-Function Tunnel (Stormwater Management & Road)
  • Longest tunnel in Malaysia
  • 9.7 km (6.03 miles) stormwater by-pass tunnel
  • 4 km (2.49 miles) double-deck motorway within stormwater tunnel
  • The motorway tunnel is suitable for light vehicles only. Motorcycles and heavy vehicles are not allowed
  • Ingress and egress connections to the motorway tunnel linking the southern gateway to the city centre
  • Holding basin complete with diversion and tunnel intake structures
  • Storage reservoir and a twin-box culvert to release flood discharge
  • State-of-the-art operations control room equipped with the latest systems in operations management, surveillance and maintenance of the SMART system.
  • Custom-made fire engine units consisting of two modified Toyota Hilux pickup trucks, parked at two different locations for quick access to the tunnel in case of fire on both carriageways.[10]

Tolls[]

The SMART Tunnel motorway using opened toll systems. All toll transactions at this toll plaza is only allowed with Touch 'n Go cards or SmartTAG.

Toll rates[]

Class Type of vehicles Rate
(in Malaysian ringgit (RM))
Notes
1 Private Cars
(Vehicles with two axles and three or four wheels (excluding taxis))
RM 3.00
4 Taxis RM 3.00 Toll charges are paid by passengers using Touch 'n Go only.

Toll charges can only be paid with the Touch 'n Go cards or SmartTAG. Cash payment is not accepted.

FM radio channels available[]

Radio Frequencies
Nasional FM 87.7 MHz
KL FM 97.2 MHz
Radio Klasik FM 95.3 MHz
Hot FM 97.6 MHz
Fly FM 95.8 MHz
hitz.fm 92.9 MHz
Traxx FM 90.3 MHz
BFM 89.9 89.9 MHz
Era FM 103.3 MHz

List of interchanges[]

The entire expressway had its speed limit of 60 km/h.

Legend:


From/to E37 East–West Link Expressway[]

km Exit Interchange To Remarks
E38
0
E37 East–West Link Expressway

Southeast
Cheras

Northwest
Petaling Jaya
Shah Alam
Direction Y junctions
E37 Kuala Lumpur–Seremban Expressway
ANIH Berhad border limit
E38 SMART logo.gif SMART Tunnel
(Touch 'n Go and SmartTAG ETC only)
SMART border limit
SMART logo.gif Hentian sebelah.jpg SMART Tunnel operation office Parking (malaysia).jpg Toilet sign (Malaysia).svg TnG TAG Information centre (malaysia).jpg
Customer Service Centre
SMART Tunnel operation office
South bound on Cheras, Petaling Jaya and Shah Alam stretches only
SMART logo.gif SMART toll plaza
Accepts electronic toll payment (Touch 'n Go and SmartTAG only)
Motorway Tunnel
Dry sections
Start/End of tunnel
Maximum height 2 m
Speed limit 60 km/h
From/To Motorway tunnel

From/to E37 Kuala Lumpur–Seremban Expressway[]

km Exit Interchange To Remarks
South
E37 Kuala Lumpur–Seremban Expressway
E37 Kompleks Sukan Negara
E5 Klang
E2 North–South Expressway Southern Route
E6 AH2 Kuala Lumpur International Airport (KLIA) Airport (malaysia).jpg
E2 AH2 Seremban
E2 AH2 Melaka
E2 AH2 Johor Bahru
E37 Kuala Lumpur–Seremban Expressway
ANIH Berhad border limit
E38 SMART logo.gif SMART Tunnel
(Touch 'n Go and SmartTAG ETC only)
SMART border limit
E38
0
SMART logo.gif SMART toll plaza
Accepts electronic toll payment (Touch 'n Go and SmartTAG only)
Motorway Tunnel
Dry sections
Start/End of tunnel
Maximum height 2 m
Speed limit 60 km/h
From/To Motorway tunnel

Motorway tunnel[]

km Exit Interchange To Remarks
Motorway Tunnel
Dry sections
Start/End of tunnel
Maximum height 2 m
Speed limit 60 km/h
EXIT 3801 Motorway Tunnel
Dry sections
Tunnel exit south bound
EXIT 3801A
SMART logo.gif Hentian sebelah.jpg SMART Tunnel Operation Office
E37 East–West Link Expressway
E37 Cheras
E37 Petaling Jaya
E37 Shah Alam

EXIT 3801B
E37 Kuala Lumpur–Seremban Expressway
E37 Kompleks Sukan Negara
E5 Klang
E2 North–South Expressway Southern Route
E6 AH2 Kuala Lumpur International Airport (KLIA) Airport (malaysia).jpg
E2 AH2 Seremban
E2 AH2 Melaka
E2 AH2 Johor Bahru
Tunnel Interchange
Motorway Tunnel
Conversion from dry to wet
Motorway Tunnel
Wet sections
Motorway Tunnel
Conversion from wet to dry
EXIT 3802 Motorway Tunnel
Dry sections
Tunnel exit north bound
EXIT 3802A
Sultan Ismail Link Tunnel
Jalan Davis
Kuala Lumpur Inner Ring Road
Jalan Imbi
Jalan Sultan Ismail
Jalan Bukit Bintang

EXIT 3802B
Kuala Lumpur Middle Ring Road 1
Jalan Tun Razak (Jalan Pekeliling)
Kuala Lumpur City Centre (KLCC)
Ampang
Tunnel Interchange
Lower floor
Motorway Tunnel
Dry sections
Start/End of tunnel
Maximum height 2 m
Speed limit 60 km/h
E38 SMART logo.gif SMART Tunnel
Start/End of expressway
(Touch 'n Go and SmartTAG ETC only)
SMART border limit
Kuala Lumpur Middle Ring Road 1
DBKL border limit
North
Kuala Lumpur Middle Ring Road 1
Jalan Tun Razak (Jalan Pekeliling)
Kuala Lumpur City Centre (KLCC)
Ampang

Sultan Ismail link tunnel[]

km Exit Interchange To Remarks
EXIT 3802 Sultan Ismail link tunnel
Dry sections
Tunnel entry south bound
Motorway Tunnel
E37 Cheras
E37 Petaling Jaya
E37 Kompleks Sukan Negara
E6 AH2 Kuala Lumpur International Airport (KLIA) Airport (malaysia).jpg
E2 AH2 Seremban
E2 AH2 Melaka
E2 AH2 Johor Bahru
Tunnel Interchange
Upper floor
Motorway Tunnel
Dry sections
Start/End of tunnel
Maximum height 2 m
Speed limit 60 km/h
E38 SMART logo.gif SMART Tunnel
Start/End of expressway
(Touch 'n Go and SmartTAG ETC only)
SMART border limit
Jalan Davis
DBKL border limit
NorthWest
Sultan Ismail–Kampung Pandan Link (Jalan Davis)
Kuala Lumpur Inner Ring Road
Jalan Imbi
Jalan Sultan Ismail
Jalan Bukit Bintang

Tunnel in popular culture[]

  • The SMART Tunnel was featured in an episode of Extreme Engineering on the Discovery Channel.
  • The SMART Tunnel was featured in an episode of on the National Geographic Channel and TV1.
  • The SMART Tunnel was featured in an episode of on the Science Channel.
  • The SMART Tunnel was featured in an episode of Megastructures on the National Geographic Channel and TV1.
  • The SMART Tunnel was featured in episode 2, Season 1, of Build It Bigger on the Science Channel.

See also[]

References[]

  1. ^ "A Dual-Purpose Tunnel, Ingenia 30, March 2007" (PDF). Archived from the original (PDF) on 13 April 2020. Retrieved 24 January 2012.
  2. ^ THE ROLE OF GUSZTÁV KLADOS
  3. ^ Utusan Malaysia Online - Berita Utama
  4. ^ Malaysian National News Agency :: BERNAMA Archived 19 May 2007 at the Wayback Machine
  5. ^ New Straits Times: Smart tunnel working well
  6. ^ MegaStructures SMART tunnel episode
  7. ^ YING, VEENA BABULAL and TEOH PEI (12 September 2020). "KL flash flood: 'Smart Tunnel mitigated situation' | New Straits Times". NST Online. Retrieved 15 September 2020.
  8. ^ "SMART Tunnel reopened to traffic | The Star". www.thestar.com.my. Retrieved 15 September 2020.
  9. ^ Success of Kuala Lumpur's dual purpose tunnel. ITS International. Online at http://www.itsinternational.com/categories/detection-monitoring-machine-vision/features/success-of-kuala-lumpurs-dual-purpose-tunnel/
  10. ^ Custom-Built Fire Engines for SMART Highway Delivered to the Malaysian Fire and Rescue Department Archived 4 January 2008 at the Wayback Machine - from SMART Tunnel official website